Devendra Singh Parihar
Site Engineer | MEP Coordinator
Hire this person
Send a job offer directly to this candidate
About
Mechanical Engineer with 6+ years of experience in MEP coordination, site execution, and project management across industrial and government projects. Proficient in coordinating HVAC, electrical, and mechanical installations, reviewing BOQs, Shop Drawings, and GFC Drawings, ensuring execution in accordance with project specifications and QA/QC standards. Experienced in manpower management, material planning, contractor and consultant coordination, quantity estimation, site inspections, testing & commissioning support, snag closure, and project handover.
Skilled in AutoCAD, Revit, and construction drawing interpretation, with a strong commitment to safety, quality, timely project delivery, and client satisfaction through effective technical coordination and execution.
Experience
Site Engineer | MEP Coordinator at LISHA ENGINEERS PRIVATE LIMITED (2020-03 – Present)
Civil, Mechanical & Electrical Coordination – Quality & Operations
- Coordinated MEP activities with Civil, Architectural, and Structural teams to ensure smooth and clash-free project execution while managing 60+ workers.
- Supervised installation of HVAC, Electrical, and Mechanical systems in accordance with approved drawings and project specifications.
- Reviewed BOQs, Shop Drawings, and GFC Drawings to ensure accurate execution and compliance with project requirements.
- Coordinated with clients, consultants, and vendors to resolve technical issues and maintain uninterrupted project execution.
- Supervised installation of Cable Trays, Supports & Hangers, conduits, and associated MEP systems for industrial and commercial projects.
- Supported Testing & Commissioning activities and ensured all systems met project specifications before handover.
- Conducted QA/QC Inspections to verify installation quality and ensure compliance with project standards and safety regulations.
- Ensured compliance with ISO 9001, ISO 14001, ISO 45001 and project-specific EHS requirements throughout execution.
- Managed material deliveries and coordinated storage to maintain uninterrupted site operations.
- Inspected installed MEP systems to identify non-conformities and ensure corrective actions were implemented.
- Utilized AutoCAD and Revit for drawing review, layout verification, and coordination support.
- Participated in technical coordination meetings with consultants, clients, and project stakeholders.
- Tracked material delivery schedules and coordinated procurement to avoid execution delays.
- Verified installation levels, alignments, and dimensions as per approved construction drawings.
- Monitored site safety, PPE compliance, permit-to-work requirements, and safe execution of MEP activities.
- Delivered projects in accordance with approved timelines while maintaining high standards of quality, safety, and client satisfaction.
- Raised Inspection Requests (IRs) and coordinated inspections with consultants and client representatives.
- Supported preparation of As-Built Drawings and Operation & Maintenance (O&M) Manuals.
- Coordinated multidisciplinary teams to ensure smooth execution of MEP activities and compliance with project quality standards.
- Coordinated installation of electrical distribution systems, cable trays, DBs, and panel connections during project execution.
- Prepared and reviewed electrical layout drawings in AutoCAD/Revit for accurate panel placement and cable tray design.
Industrial Trainee at CNHI INDUSTRIAL INDIA PVT LTD (2019-09 – 2020-03)
- To reduce the Average Defect per Unit (ADPU) of tractor assembly by understanding and finding the solution to the defects whose frequency is higher using 5W1H, 5WHY and 4M techniques.
- Worked on project "Occurrence & Release Matrix" for defect tracking and control.
- Used 3G approach (Gemba, Gembutsu, Genjitsu) for real-time issue analysis.
- Reduction of Non-Value-Added Activities (NVAA) of Operator which also result in reducing operation cost.
- Contributed to quality improvement in CNHI AID-10 tractor model.
- Implemented improvements using kaizen management systems (KMS)
- Implemented Poka-Yoke techniques at workstations to eliminate human errors and ensure defect-free assembly.
- Integrated error-detecting machines into production lines, enabling early identification of defects and reducing rework.
Education
Bachelor of Technology in Mechanical Engineering – Abdul Kalam Technical University, U.P. India (2015 – 2019)

