Consultant - TAMIL NADU WATER INVESTMENT COMPANY LIMITED - Tamil Nadu
(2025-06)
Various Water Supply and UGSS Projects in Corporation and Municipality in Tamil Nadu
- Consultancy assignment for Designing the Existing Water Supply System to the District Metered Area(DMA) Based Water Supply Distribution System for Thoothukudi, Vellore, Dindigul and Tirunelveli City Municipal Corporation.
- Design & Build of 7 MLD Product Water Conveyance System through Pipeline with all allied works from the 20 MLD Tertiary Treatment Reverse Osmosis (TTRO) Plant at Kelavarapalli to the proposed Shoolagiri Sipcot Industrial Park Phase I & II for 1 Year on DBO Basis.
- Preparation of Detailed Project Report for Under Ground Sewerage Scheme (UGSS) for Left out Areas of Phase –IV in Tiruchirappalli City Corporation.
- Preparation of Detailed Project Report (DPR) to improve the existing Water Supply Distribution and to provide Water Distribution system to the Uncovered area of Avadi Corporation.
- Amrut 2.0 City water balance plan Data Verification in Tamil Nadu State (666 ULB's)
- Preparation of Detailed Project Report (DPR) to improve the existing Water Supply Distribution in Idappadi Municipality adopting District Metered Area (DMA) concept.
- Transforming the existing intermittent water supply to continuous 24x7 water supply distribution system for the water zone 30 & 50 in Tiruppur city municipal corporation.
- Preparation of Detailed Project Report for Under Ground Sewerage Scheme (UGSS) for Left out areas in Avadi City Municipal Corporation
- Consultancy assignment for designing the existing Water Supply distribution system to the District Metered Area (DMA) based Water Supply Distribution System for 9 Corporations
- Preparation of Detailed Project Report (DPR) for Under Ground Sewerage Scheme (UGSS) for left out areas and added areas in Salem City Municipal Corporation.
- Preparation of Detailed Project Report (DPR) for Under Ground Sewerage Scheme (UGSS) for Pammal Municipality.
- Preparation of Detailed Project Report (DPR) for Under Ground Sewerage Scheme (UGSS) for Anakaputhur Municipality.
- Preparation of detailed project report for smart water supply network and sewerage collection system in T. Nagar, Chennai city, under, Smart City Mission for CMWSS Board.
- Preparation of detailed project report for improvement of internal distribution system & augmentation of additional source in the existing source at river Palar for Tambaram Municipality.
- Preparation of Comprehensive Detailed Project Report for Improvement of Source & Internal Distribution System to Gobichettipalayam Municipality.
- Preparation of Detailed Project Report for "Upgrading Vijayawada existing water supply to 24x7 water supply for Vijayawada Corporation – Phase – 1 area
- Preparation of detailed designs of various project components like Intake, Transmission mains, 24 x 7 Water Supply Distribution System along with Specification, Bill of Quantities and Drawings for approval to DW & SD for Chotta Govindpur and Bagbera Pipe Water Supply Scheme in East Singhbhum District of Jharkhand State.
- Preparation of Detailed Project Report (DPR) for the Improvement of Water Supply distribution system to Ambur, Vaniyambadi, Melvishram, Pernampattu, Gudiyattam, Walajapet, Thirupattur and Ranipet Municipalities in Vellore District
- TWAD-100 MLD Desalination plant in Ramanathapuram & Thoothukudi Districts-Planning study and preparation of Pre-Feasibility Report.
- Improvements of Water Supply Transmission Main, Distribution System and Water Management Plan at Vellore Corporation
Consultant - SHAH TECHNICAL CONSULTANTS PVT LTD - Tamil Nadu
(2012-04 - 2025-06)
Consulting Services for Preparation of DPR for Water Supply System and Underground Sewerage System to the left-out area of Erode City Municipal Corporation
- Condition assessment of Existing WS & UGSS infrastructure
- Design of Feeder main Length 16.20km
- Design of service reservoir for 36 Nos
- Design of distribution system in DMA concept for 435km
- Design of collection system for length of 612km
- Design of PS&LS
- Design of Pumping Main length 31.6km
- STP for the capacity of 31.40 MLD
- Preparation of Existing drawings and BOQ
Consultant - SHAH TECHNICAL CONSULTANTS PVT LTD - Tamil Nadu
(2007-07 - 2012-04)
Various Water Supply and UGSS Projects in Corporation and Municipality in Tamil Nadu
- UIDFC (Karnataka Municipal Reform Project – Package – IV) Providing Underground Drainage Scheme for Harihar, Humnabad & Athani Sewerage Project
- DPR for Augmentation of 15-TMC of Water to Chennai City(1161MLD)
- Under Ground Drainage scheme to Nagpur Municipal Corporation (2500 km)
- Preparation of detailed project report for smart water supply network and sewerage collection system in T. Nagar, Chennai city, under, Smart City Mission for CMWSS Board.
- Under Ground Drainage of 7ULB's Chennai, for CMWSSB. (Madipakkam, Palavakkam, St. Thomas Mount, Nandambakkam, Mugalivakkam, Palavakkam, Kottivakkam)