LAB ASSISTANT
Send a job offer directly to this candidate
I intend to pursue rewarding career in Construction Company with an application of computers, thereby establishing my skills & grow with the organization & face the challenges successfully in my profession.
LAB ASSISTANT - TLP–HGIEPL Joint Venture - Chittorgarh – Udaipur, Rajasthan
(2021-07 - 2023-01)
Six Lane of Chittorgarh – Udaipur, Section of NH-76 from Design Chainage KM214.870 to KM 308.370 in the state of Rajasthan (length 93.500 km) on DBFOT (Toll) mode under NHDP Phase – V Package (KUA-III)
LABTECH - M/s SHIV BUILD INDIA PVT.LTD. - Delhi-Saharanpur-Dehradun, Uttar Pradesh
(2023-01 - 2024-04)
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 56+500 (Vill-Karaunda Mahajan) to Design Chainage 82+000 (Vill-Khyawari) in the state of Uttar Pradesh on EPC Mode (Package-III)
SR/LABTECH - M/S KGG GUPTA INFRASTRUCTURE PVT. LTD. - Bhopal, Madhya Pradesh
(2023-03 - 2024-04)
Maintenance of Bhopal bypass length 26.km
SR/LABTECH - SHAPERS CONSTRUCTION LIMITED - Bhopal, Madhya Pradesh
(2024-01)
Rehabilitation & Upgradation of Nasrullaganj-Rehti-Budhni Section of NH146-B, total design length-47.300 km from KM 0+150 to KM 50+500 (Design Chainage 0+000 to 47+300) to 2-Lane with Paved Shoulder Configuration in the state of Madhya Pradesh on EPC Mode
High School - MP BOARD (2010)
Intermediate - MP BOARD (2012)
Diploma - Civil - BARKATULLAH UNIVERSITY (BHOPAL) (2015)