Senior / appropriate position
Send a job offer directly to this candidate
Civil Engineer with 29+ years of experience in infrastructure development, highway construction, and railway projects. Expertise in project management, construction supervision, and coordination with government agencies and contractors across major Indian infrastructure projects.
Construction Manager - Haskoning India Consulting Pvt Ltd. Noida - Noida
(2026-05-04)
Design, Construction, Testing, Commissioning and O & M of Infrastructure Works at ORVAKAL NODE District Kurnool Adhara Pradesh under the HYDERABAD BENGALURU Industrial Corridor (HBIC) ON EPC Basis.
Resident Engineer - Geo Design & Research Pvt Ltd Baroda Gujarat - Baroda, Gujarat
(2022-08-12 - 2026-04-30)
Construction to 2 lanes with paved shoulder realignment/Bypass of NH-325 with multiple bypass sections (Asotra - Brahmdham bypass, Siwana Bypass, Mokalsar Bypass, Kathadi, Bishangarh, Jalore Bypass, Ahore Town Portion, Dujana Bypass), Balotra to Sanderao via Jalore Section Package-IV (Total Length 41.455Km) on EPC Mode in Rajasthan.
GM Highway - ICT Pvt Ltd - Rajasthan
(2021-04-06 - 2022-08-10)
Construction / Upgradation of Four/ Two lane with paved shoulder of NH-68 of Tanot- Ramgarh- Bhadasar- Jaisalmer and NH from Bhadasar (Mokal)-Sarkaritala up to Pakistan Border under Phase-1 Bharatmala Pariyojana (Total Length 193.523Km) on EPC Mode in Rajasthan.
DGM Highway - ICT Pvt Ltd New Delhi - Rajasthan
(2018-05-21 - 2021-03-31)
Six-Lanning of Kishangarh Udaipur Ahmedabad Section from Km. 90+000 (Near Gulabpura) to Km. 214+870 (End of Chittorgarh Bypass) of NH-79, Package-2 under NHDP Phase V on BOT (Toll)= 114.87 Km.
Sr Manager- Construction (Rail bed) - Tata Projects Ltd. Hyderabad - Hyderabad
(2018-02-01 - 2018-05-17)
Design of Construction of Civil, Building and Track works for Double line Railway involving Formation in Embankments/ Cutting, Bridges, Structures, Buildings, Ballast on Formations, Track Works for JNPT- Vaitarana Section of Western Dedicated Freight Corridor (Phase-2)= 95 Km.
Project Manager - Chittorgarh Kota Tollway Pvt Ltd Ahmedabad - Rajasthan
(2016-12-01 - 2018-01-31)
Operation and Maintenance of Chittorgarh-Kota section from Km 891.929 to Km 1052.429 of NH-27 OMT basis Pkg-3 in Rajasthan (length 160.50 Km).
Manager – Const. (Railway) - GMR Infrastructure Ltd. EPC Division, Bangalore - Uttar Pradesh
(2014-01-01 - 2016-11-30)
Doubling of Railway line from Jhansi (Km 1129.00) to Erich Road station (km 1195.00) on Jhansi Division of North Central Railway, Length = 66 km.
Manager – Const. (Highway / Railway) - GMR Infrastructure Ltd. EPC Division, Bangalore - Odisha
(2011-05-01 - 2013-12-31)
Construction of Rail bed from Km 0.00 to 8.22 Km from Thermal Power Plant to Budapank Railway station including 10.22 km approach road and 16.00 km Peripheral and township roads for GMR Kamlanga Thermal Power Plant Angul Odisha.
Manager – Const. (Const.) - GMR Projects Private Ltd. EPC Division, Bangalore - New Delhi
(2010-04-20 - 2011-04-30)
Rehabilitation of Runway 10/28 (T-2 Terminal) at IGI Airport, and CPD roads project New Delhi.
Highway Engineer (PMC) - SCSS Pvt Ltd Noida - Uttar Pradesh
(2009-02-01 - 2010-04-19)
Six laning of NH-8 from Km 42.00 to 273.00 (Gurgaon - Kotputli- Jaipur) In Package –V (Km 181+300 to Km 219+500) = 38.20 Km.
Manager Execution - AFCONS INFRASTRUCTURE LTD Engineers & Contractors ANDHERI (w) MUMBAI - New Delhi
(2008-03-01 - 2009-01-31)
Construction of 3 level grade separator at Ghazipur Intersection on NH-24 Bypass Project, length of approach road=5.00 Km.
Resident Engineer - D. S. Constructions Limited, New Delhi - Chhattisgarh
(2007-03-01 - 2008-02-28)
Four laning of NH-6 from Km 239.00 to 282.00 (from Raipur to Aurang) Project, Length = 43.00 Km.
BE - CIVIL (1995)
M Tech - Highway (2022)