Skip to main content
Dinesh Doke

Dinesh Doke

Site Engineer Project Engineer

Talent
Pune, PuneMember since July 7, 2024
·

Hire this person

Send a job offer directly to this candidate

About

  • Highly motivated and skilled Professional with over 5+ years’ experience in PreCommissioning, Commissioning and Pipeline services of Oil & Gas Plants in Middle East and in India.
  • Expertise in Pipeline commissioning, Nitrogen-Helium Leak Testing, Shutdown Operation and Maintains of

Oil and Gas plant and well Piping.

  • Conversant with latest Fire and Gas safety procedures and safe handling of equipment’s.
  • During my overseas assignment I had the opportunity to work with many nationalities. This has increased my interpersonal qualities coupled with my strong work ethic, has enhanced my confidence to undertake oriented and individual assignments.

Experience

RESPONSIBILITIES AS PROJECT ENGINEER AND FIELD ENGINEER IN TRANS ASIA AND IN NARMADA

OFFSHORE CONST PVT LTD.

  • Competent of Pre-commissioning activity like Cleaning , Gauging ,Water filling, Hydrotesting, Dewatering,

Swabbing, EGP (Electronic Caliper survey), Air Drying/Vacuum Drying ,Nitrogen Purging.

  • Responsibilities include Engineering and Technical & Project Management for Pipeline Pre-Commissioning

Services.

Procedure

Preparation & approval, Liaison with Contractor, Project Management, Resources

Management.

  • Acquired exposure in pipeline pigging for gauging, base line survey, and tool running and caliper pigging

Activities.

  • Conducted and inspected pipeline hydro test activities such as pre-testing of headers, water filling of Pipeline,

pressurizing, pressure calculations, dewatering, swabbing, nitrogen purging, etc.

  • Handled decommissioning and pipeline pre-commissioning activities, oil pipelines, managed tie in of new pipelines etc.,
  • Administered fabrication & erection of Structural Jobs and maintained its quality control procedures.
  • Identified job hazard, undertook risk analysis, implemented, and inspected all safety precautions at the worksite.
  • Co-coordinating and assisting the offshore projects, materials preparation, equipment’s function, engineering,

and implementation of the projects.

  • Back support and preparation work for the project as per procedure, knowledge, experience, field studies and technical services.
  • Trained for safety monitoring during fabrication, oil and gas commissioning activities and Hydro testing etc.,
  • Documentation of history sheet, test pack clearing, etc.

TEXOL ENGINEERING PVT LTD.

  • Prepare the checklist for the customer's site readiness and arrange the customer's consent on site readiness through effective follow-up.
  • Simultaneously, get the project handover documents from the project department, scrutinize the documents for accuracy and completeness, assist the coordinator (C&Q) to prepare the cost estimate for the visit to the customers' site (with the day-wise plan, site schedule, boarding-lodging, local conveyance, etc.), and arrange to get approval from the top managment.
  • Before FAT (Factory acceptance test) complete P&ID walk trhugh has been done and list out the punch points and try to closing of the punch points before site mobilization.
  • Work/Service Order of Third Party Contractor (TPC) at the Customer's Site (after selecting a Validated TPC,

receiving, comparing, and finalizing the quote from the TPC) and the Issuance-and-Receipt of the Work/Service

Order by the TPC.

  • Upon reaching the Customer's Site, Arrange to Unload the Consignment (if in the scope) at/near the Customer's

Facility.

  • Ensure the Gate Entry procedures, as per the Customer's pre-determined Material Entry procedures and the safe-

&-secure positioning of the Consignment at the pre-determined location of the Customer.

  • Arrange to Unpack the Consignment, Reconcile the material as per the pre-pared Packing List and Shift-&-Position-

&-Install the respective Systems/Equipment's at the precise location as per the pre-Approved relevant Drawings.

  • Site Piping Fabrication-&-Installation, as per pre-Approved Piping &Instrumentation Drawings (P&ID).
  • Insulation, as per Good Engineering Practices, Cable Tray, Conduit, Tubing and Cabling as per pre-Approved

General Arrangement (GA) & Room Layout Drawings.

  • In the event the Assignment is that of Modification / Upgradation of a System supplied in the past, The Customer's requirements should be internally discussed, finalized, documented, compared with the past Documents, got analyzed-&-validated with the concerned internal Depts. for feasibility, got approved by the Customer for Scope-&-

Cost resulting in a Purchase Order from the Customer.

  • Adherence to the pre-Approved Completion Timelines.
  • Conformation to mandatory Regulatory requirements in terms of Statutory Certification and Quality Standards.
  • Maintenance of all relevant Site-related Records of Attendance, Update of Man-days, Daily/Weekly SAT updates,

Deviation-&-Resolution updates.

  • The Site-Bill of the TPC/s are discussed-&-finalized and that there are no doubts / disputes. All the necessary Site

Expenditures should result in Invoices that are unambiguous, reasonably justifiable and optimally quantified.

  • Regular Verbal-&-Written Communication with Head Office / HOD .

Education

I have completed my bachelor's degree in Mechanical engineering form Savitribai Phule Pune University.

Reviews

Related