Harender Chopra
Senior Surveyor (Highway & Railway Infrastructure)
Hire this person
Send a job offer directly to this candidate
About
Seeking a challenging position as a Senior Surveyor in a growth-oriented infrastructure organization with a hi-tech environment and dedicated professionals. Aiming to utilize extensive surveying expertise in Total Station, Trimble DGPS, Machine Guidance Systems, and alignment calculations to achieve project excellence.
Experience
Sr. Surveyor at Ceigall India Limited (2024-06 – Present)
Construction of 4-lane Greenfield Jalbehra–Shahbad Section of NH-152G (Km 0+000 to Km 22+850, part of Shahbad–Thol Feeder route) in Haryana on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I. Client: National Highways Authority of India (NHAI). Independent Engineer: MSV International Inc. Project Cost: ₹881 Crore.
- Executed Traversing, TBM Shifting, and error distribution.
- Calculated coordinates and executed layout for all structures including MNB, MJB, Box Culvert, HPC, Vehicle Underpasses (VUP, SVUP, LVUP), Service Roads, Interchanges, and Retaining Walls.
- Carried out Borrow Area Surveys and stock measurements (~30 Lakh Cum soil) using Trimble DGPS.
Surveyor at Ceigall India Limited (2022-05 – 2024-06)
Construction of 4-lane Greenfield Delhi–Amritsar–Katra Expressway from junction with NH-7 near Bhawanigarh to junction with SH-11 near Bhogiwal village (Km 188+830 to Km 225+770) on EPC mode under Bharatmala Pariyojna. Client: National Highways Authority of India (NHAI). Authority Engineer: M/s Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT). EPC Contractor: M/s Ceigall India Limited. Project Cost: ₹881 Crore.
- Carried out Traversing, TBM Shifting, and coordinate calculation as per required chainage.
- Executed layout for structures including MNB, MJB, Box Culverts, HPC, VUP, SVUP, LVUP, Service Roads, Interchanges, and Retaining Walls.
- Conducted Borrow Area Surveys and stock measurements for ~1 Crore Cum soil quantity using Trimble DGPS.
Asst. Surveyor at M/s Gawar Construction Limited (2020-10 – 2022-05)
Design and Construction of Civil Structures involving Formation in Embankment/Cutting, Bridges, Platforms, Buildings, Yards, and allied works on Design-Build Lump Sum basis for Meham–Hansi Section of Rohtak–Meham–Hansi New BG Line Project. Client: Northern Railway. Project Cost: ₹889 Crore.
- Center line marking, toe line marking, bed preparation, and OGL/PGL level recording.
- Executed layout of all civil & track structures using Total Station and Auto Level.
Education
Diploma in Civil Engineering – Swami Vivekanand Institute of Technology & Management
12th in Senior Secondary – Haryana Board of School Education (H.B.S.E., Bhiwani)
10th in Matriculation – Haryana Board of School Education (H.B.S.E., Bhiwani)
