BIM Modeler-Structure - Typsa India Pvt. Ltd. - UAE-OMAN
(2025-10)
Hafeet Rail – UAE-OMAN
- To create 3D BIM model of steel structure, Box culverts & RCC Structure like, Admin building, Maintenance workshop, Container yard operational building, Control room for wheel measuring device etc.
- Update existing 3D models as per engineer's instructions, markups & also update the model based on changes made by other disciplines or due to clashes detected in coordination meetings.
- Prepared and submitted drawings at every stage of the project.
BIM Engineer - Bechtel India Pvt. Ltd. - USA
(2022-09 - 2025-09)
Deputed by The BIM Engineers. Semiconductor Project - USA
- To create 3D BIM model of steel & RCC structure, edit models as per engineer's instructions, markups.
- Participated in weekly coordination meetings with other disciplines to resolve conflicts with the models.
- Updated existing 3D models based on changes made by other disciplines or due to clashes detected in coordination meetings.
- Conduct clash detection analysis, prepare clash detection reports, and resolve them.
- Prepared and submitted drawings & quantity schedules at every stage of the project.
- Performed quality control checks on all BIM models prior to submission.
Trainee BIM Engineer - Econstruct Design & Build Pvt. Ltd.
(2021-07 - 2022-08)
- Raviraj Project, Mumbai (GF+3+Terrace floor): To Create 3D model of Revit Architecture, Revit Structure & Revit MEP. To Create Bill of Quantities (BOQ).
- Padma Project, Bangalore (GF+4 Commercial Building): To Create 3D model of Revit Architecture, Revit Structure. To Create Bill of Quantities (BOQ).
- Reliance Mall, Mangalore, (2B+GF+4 Commercial Building): Planning of 2D Electrical plan in AutoCAD. Preparation of Tender & Contract Documents.
- The Empire Project, Mysore (2B+GF+9 Residential Building): To Create 3D model of Revit Architecture. Preparation of Tender & Contract Documents. To Create of 3D rendering images, walkthrough video by using Lumion.
- GMLR Project (Goregaon-Mulund Link Road): To create 3D Infraworks model of GMLR (Goregaon-Mulund Link Road). To create Bill of Quantities (BOQ). To create scheduling of the project with proper resource allocation and levelling. To create Time liner video in Navisworks.
Assistant Valuer - Vr. Manish R. Kapadia - Surat
(2018-05 - 2021-05)
- Approved Project Financial (APF) Report for Meera Heights (B+GF+14), Surat: Visiting sites and inspecting all attributes of the structure and determined the property value. Prepared technical reports & layout plans of the properties and evaluated market value of the property.
- Approved Project Financial (APF) Report for Shivay Heights (B+GF+13), Surat: Visiting sites and inspecting all attributes of the structure and determined the property value. Prepared technical reports & layout plans of the properties and evaluated market value of the property.
- Valuation Report for Dhiraj Sons mall (B+GF+3), Surat: Visiting sites and inspecting all attributes of the structure and determined the property value. Prepared technical reports & layout plans of the properties and evaluated market value of the property.