Project Coordinator - Hild Projects Pvt. Ltd.
(2026-05)
- Developed and maintained integrated project schedules in Oracle Primavera P6 for a 750 MW utility-scale solar project.
- Created WBS covering engineering, procurement, civil works, module installation, electrical works, testing, and commissioning.
- Developed detailed CPM schedules with activity relationships, milestones, and critical path analysis.
- Monitored project progress through periodic schedule updates and variance analysis; conducted delay analysis and prepared recovery schedules.
- Performed resource loading and levelling for manpower, equipment, and subcontractors.
- Generated weekly/monthly progress reports, look-ahead schedules, S-curves, resource histograms, and management dashboards.
- Supported earned value analysis, schedule forecasting, and COD milestone tracking.
Project Coordinator - DEK & Mavericks Green Energy Ltd.
(2025-09 - 2026-04)
- Coordinated solar project execution: planning, scheduling, permitting, installation, and commissioning across ~350 MWp portfolio.
- Managed procurement coordination, vendor follow-ups, quality compliance, and timely delivery of solar components.
- Prepared project documentation including reports, permits, and customer handover packages.
- Led cross-functional coordination meetings (design/engineering/construction) and supported grant/subsidy applications.
BSS Engineer - Vodafone & Idea Pvt. Ltd.
(2025-06 - 2025-09)
- Installation, commissioning, troubleshooting, and maintenance of 2G/3G/4G networks (Huawei & Nokia BTS/BSC/NodeB/eNodeB).
- RF planning/optimization basics; power systems (-48V DC, UPS, Battery banks); site integration and call testing.
Project NLD Engineer - Reliance JIO
(2023-06 - 2025-06)
- Planned and executed NLD fiber optic rollout; coordinated contractor schedules and managed ROW approvals/permissions.
- Liaisoning with R&B State/Panchayat, Gram Panchayat, Nagar Palika, Railway, and gas line authorities (ONGC, IOCL).
- Prepared SLD and survey reports; ensured safety compliance; confirmed routes using OTDR and Power Meter.
- Supervised tower fabrication & erection, fiber splicing, QC documentation; managed GIS, FIP, and NE Migration tasks.
ISP Engineer - TCTS (LOBO Staffing Solutions Pvt. Ltd.)
(2023-03 - 2023-06)
- ECI MUX configuration: BG20, BG30 & NPT1020. Fault handling during ISP events; ISP PM as per requirement.
Fiber Optic Telecom Engineer - Global Construction
(2022-10 - 2023-02)
- OSP cable laying, termination, jointing, link qualification, fiber testing using OTDR, power budgeting, and structured cabling.
- Site survey, acceptance, troubleshooting (loss test, VFL, fiber identifier), splicing, and installation.