Electrical & Mechanical Installation Engineer - UGES POWERMAXE PVT- LTD
(2025-12)
- Both electrical and mechanical installation tool inspections and calibrations.
- Handling WTG installation inspection reports and resolving issues.
- Managing foundation bolt tensioning, torquing, and compaction reporting.
- Preparing nacelle and hub assemblies. Performing
- Planning crane lifting and tower erection activities.
- Conducting WTG MCC audits and HOTO.
Electrical & Mechanical Installation Engineer - HEFT ENERGY PVT-LTD.(Tata power renewable energy)
(2024-07 - 2025-12)
- Both electrical and mechanical installation tool inspections and calibrations.
- Handling WTG installation inspection reports and resolving issues.
- Managing foundation bolt tensioning, torquing, and compaction reporting.
- Preparing nacelle and hub assemblies. Performing
- Planning crane lifting and tower erection activities.
- Nacelle, Hub, and Tower Installation
- Documentation, Punch Point Closure & MCC Completion
- Material Inspection and HOTO of WTG
- Tower Accessories Matching and Road Survey
Electrical & Mechanical Installation Engineer - SYNIGENCE PVT. LTD. (INOX Renewable Energy)
(2023 - 2025)
- Both electrical and mechanical installation tool inspections and calibrations.
- Handling WTG installation inspection reports and resolving issues.
- Managing foundation bolt tensioning, torquing, and compaction reporting.
- Preparing nacelle and hub assemblies.
- Collected installation data and maintained WTG history cards.
- Supervised material inspection during incoming and installation phases.
- Assisted in closing punch points after mechanical completion.
- Conducted mechanical and electrical inspection during wind turbine installation.
Electrical & Mechanical Installation Engineer - RAMEEZ ENGINEERING
(2021 - 2023)
- Both electrical and mechanical installation tool inspections and calibrations.
- Worked on mechanical assembly and installation of wind turbine components.
- Supported site team in inspection, documentation, and safety compliance.
- Conducted mechanical and electrical inspections during wind turbine installation.
- Collected installation data and maintained WTG history cards.
- Supervised material inspection during incoming and installation phases.
- Assisted in closing punch points after mechanical completion
- Conducting WTG MCC audits and HOTO