Deputy Plant Manager as Plant Head at SHV Energy Pvt. Ltd. (SUPER GAS) (2026-01 – Present)
Plant In-Charge as Plant Head at SHV Energy Pvt. Ltd. (SUPER GAS) (2024-06 – 2025-12)
- Oversee full plant operations, including production, maintenance, safety, and statutory compliance (PESO, OISD, Factory Act).
- Manage inventory of LPG cylinders, valves, spares, and consumables to ensure uninterrupted operations.
- Lead HSE activities, safety drills, training, incident investigations, and audits.
- Skilled in equipment maintenance, troubleshooting, and operational efficiency improvement.
- Apply Lean principles including 5S, OEE, KPI tracking, and RCA.
- Strong team leadership, collaboration, communication, and presentation skills.
- Handle project reporting, performance monitoring, and continuous improvement initiatives.
- Successfully commissioned automation upgrades and infrastructure projects; managed OPEX/CAPEX budgets
Technical Executive – Technical & Projects at SHV Energy Pvt. Ltd. (SUPER GAS) (2023-04 – 2024-05)
- Coordinated with Sales team to collect and analyse customer Fuel Data Sheets for project planning.
- Conducted site inspections to assess suitability for LPG bank installation per IS guidelines.
- Prepared technical drawings, project scopes, and work instructions for customers.
- Created and managed SAP PRs and POs and monitored vendors for timely LPG bank installation.
- Conducted material inspections, project audits, and pneumatic testing of gas bank manifolds.
- Supervised commissioning of LPG banks and ensured compliance with safety and quality standards.
- Liaised with Finance for timely vendor payments and smooth project closure.
Production, Maintenance & Safety Department at BPCL Uluberia LPG Bottling Plant – Howrah, Kolkata (Under Sinclus Engineering & Consulting Pvt. Ltd.) (2020-12 – 2023-03)
Operations, Maintenance & Safety at BPCL Patna LPG Bottling Plant – Fatuha, Patna (Under Core Energy System Pvt. Ltd.) (2016-09 – 2020-11)
Production Department at BPCL – LPG Bottling Plants (Patna & Uluberia) (2016-09 – 2023-03)
- Supervised end-to-end LPG bottling operations ensuring safety, quality, and efficiency.
- Conducted pre/post-filling checks, equipment performance monitoring, and cylinder segregation.
- Coordinated production planning, vessel lineup, and manpower allocation.
- Performed SQC analysis to eliminate defective supply, optimized power and water usage.
- Achieved record bottling output of 13,616 cylinders in a single shift.
Planning Department at BPCL – LPG Bottling Plants (Patna & Uluberia) (2016-09 – 2023-03)
- SAP in sales & distribution, mm module handled.
- Planning loads as per market demand.
- Distribution of packed LPG.
- Optimum utilization of available packed trucks for distribution of loads.
- Maintain equal distribution of RTKM among the packed trucks
- Daily monitoring of stock loss of bulk LPG.
- Monitoring of consumables viz. Caps, SC Valves, T.E. Seal, O' Ring, Brown soap etc.
- Absenteeism reports follow up with transporters on daily basis.
- Golden hour in terms of invoicing from 6am to 10am, so that trucks will turn 2nd trip on the same day.
Maintenance Department at BPCL – LPG Bottling Plants (Patna & Uluberia) (2016-09 – 2023-03)
- Executed preventive and corrective maintenance to ensure uninterrupted operations.
- Ensured compliance with OISD and Guidelines standards for quality, safety, and environment.
- Oversaw firefighting systems, equipment reliability, and spare part management.
- Managed procurement activities (PR/PO creation, vendor billing, and payments).
HSSE Department at BPCL – LPG Bottling Plants (Patna & Uluberia) (2016-09 – 2023-03)
- Conducted monthly safety training for contract workers and LPG drivers.
- Implemented Near Miss reporting, safety talks, and regular safety audits (ISA & ESA).
- Ensured firefighting system upkeep and compliance with statutory requirement.