Skip to main content
Jayasanjeev Ramasamy

Jayasanjeev Ramasamy

Welding Inspector

Talent
Chennai, Chennai districtMember since February 17, 2024
·

Hire this person

Send a job offer directly to this candidate

About

As a QC Engineer/Inspector I oversee the quality and compliance of welding and fabrication activities in various projects. I have more than 15 years of experience in welding inspection, welding, and metal fabrication, working with different clients and contractors in the oil and gas industry. I have acquired multiple certifications and skills in welding and painting inspection such as CSWIP 3.2.2, ASNT level II, ISO 9001 -2015 and Bags grade 2 .

I am passionate about ensuring the highest standards of safety, quality, and efficiency in welding and fabrication, and I enjoy collaborating with diverse teams and stakeholders to deliver successful outcomes. I am looking for an opportunity to leverage my inspection expertise and welding and fabrication skills to contribute to the mission and vision of your organization.

Experience

  1. COMPANY : NDT CORROSION CONTROL SERVICES CONTRACTOR : NPCC / DENHOLM-YAM
CLIENT : SAUDI ARAMCO

PROJECT : CRPO-14JACKETS-LTA FOR OFFSHOREFACILITIES POSITION : QC INSPECTOR - WELDING

DURATION : January 2023 to August 2023

  1. COMPANY : NDT CORROSION CONTROL SERVICES CONTRACTOR : SHAW EMIRATES
CLIENT : SAUDI ARAMCO

PROJECT : TANAJIB& MARJAN PROJECT

POSITION : QC INSPECTOR - WELDING

DURATION : May 2022 to December 2022

  1. COMPANY : NDT CORROSION CONTROL SERVICES CONTRACTOR : NPCC
CLIENT : SAUDI ARAMCO

PROJECT : CRPO-51/52/54 -LTA FOR OFFSHOREFACILITIES POSITION : QC INSPECTOR - WELDING

DURATION : December 2020 to April 2022

  1. COMPANY : NASSERS.AL HAJRI CORPORATION CONTRACTOR : SAIPEM
CLIENT : SAUDI ARAMCO

PROJECT : IGCC – GASIFICATION PROJECT 

POSITION : QC SUPERVISOR - WELDING

DURATION : July 2016 to September 2018.

  1. COMPANY :NASSER S.AL HAJRI CORPORATION CONTRACTOR : DAELIM
CLIENT : SAUDI ARAMCO & DOW 

PROJECT : SADARA (SADARA ISOCYNATES ) PLANT POSITION : QC INSPECTOR - WELDING

DURATION : December 2013 to March 2016.

  1. COMPANY : Karthick Flow Controls. CLIENT : LARSEN & TUBRO
POSITION : QC INSPECTOR - WELDING

DURATION : May 2010 to September 2013

  1. COMPANY : KAZSTROY Service Infrastructure India Pvt. Ltd. CONTRACTOR : LARSEN & TUBRO/CAIRN ENERGY
CLIENT : Germanisher LLoyds

PROJECT : BARMER SALAYA PIPELINE PROJECT POSITION : QC INSPECTOR WELDING

DURATION : February 2009 to April 2010.

  1. COMPANY : ESSAR CONSTRUCTION LTD
CONTRACTOR : BPCL

CLIENT : ENGINEERS INDIA LIMITED

 PROJECT : VADINAR BINA PIPELINE PROJECT

 POSITION : QC INSPECTOR - WELDING

DURATION : December 2007 to January 2009.

DUTIES AND RESPONSIBILITIES

  • To follow QCP and ITP during surveillance and inspection
  • Perform material inspection, consumable inspection.
  • Application of inspection gauges, instruments and tools
  • Check equipment and accessories
  • Witness Procedure Qualification test.
  • Witness Performance Qualification,
  • Weld inspection surveillance checks before, during and after welding.
  • Perform Fit-up inspection
  • Perform visual inspection
  • Verify preheat.
  • Review/witnessNDT
  • Witness Mechanical test , monitor heat treatment.
  • Witness PMI for alloy steel and stainlesssteel materials
  • Observe production and fabrication welding
  • Interpret and assure compliance to Code / Standard / Specification.
  • Review Technical drawing
  • Witness weld repair
  • Confirm repairs, re-testingand re-inspection accordanceto specification.
  • Prepare and compile inspection reports.ie, maintaining all inspection records, reviewing and documenting visual inspection reports, NDT reports,PWHT reports.
  • Prepare and compile inspection reports.ie, Preparation of welding inspection reports and prepare daily progress report for submitting to client.
  • Reporting to the manager for potentiality for non-conformity related to welding.
  • Coordinate and send requestfor inspection(RFI) to client and third partyinspector as per ITP mark-ups
  • Monitor implementation of contract qualityplans, inspection plans,procedures and work instructions.
  • Coordination with planningdepartment
  • Involving Fabrication and Erection of C.S, LTCS, Alloy & SS Materials.
  • Conducting daily tool box meeting for Welders,Fitters and foreman regarding welding.
  • Involving final punch list clearance.
  • Involve in Test Package preparation.
  • Submit the test package to client for review and get the approval prior to test.
  • Attended Weekly QA/QC meeting
  • Co-ordination with Third Party Agencies& Clients.

CLIENT INTERATION

  • Interact with client to understand their specific requirements and execute project accordingly.
  • Update clients on project progressand submit timely reports to them
  • Taking refresheron day-day new updates transferred by the client
  • Attending all meeting related to projects.

QUALITY ASSURANCE

  • Plan & implementQuality Control/Assurance activities
  • Review and inspect non-conforming product and initiaterequests for correctivepreventive action.
  1. COMPANY : Essar Constructions ltd
CONTRACTOR : HPCL

CLIENT : ENGINEERS INDIA LIMITED

PROJECT : MUNDRA-DELHI PIPELINE PROJECT

POSITION: : Supervisor (Mechanical)

DURATION : September 2006 to November 2007.

DUTIES AND RESPONSIBILITIES

  • Briefing the staff regardingthe daily operations.
  • Checking of project related drawings & documents for compliance with Shop and site requirements.
  • Monitoring welding is done as per WPS.
  • Verify storage oven and electrodebaking as per project requirements.
  • Implementation of welding parameterscheck as per approved procedurea specification on production welds.
  • Preparation of welding inspectionreports.
  • Responsible to inspect and maintain hand tools and power tools and equipment’s.
  • Coordinating fabrication and erection activities.
  • Preparation/coordination in getting approvalof daily inspections from the client.
  • Lead and coordinate with the QA/QC in all quality related aspects.
  • Maintaining all inspectionrelevant records, documentsto the materials for Final Handing over.
·
  1. COMPANY : Radha Engineering Works CONTRACTOR : Jindal steel
POSITION : Maintenance Supervisor DURATION : December 2005 to June 2006.
  1. COMPANY : Eligi Tread Indian ltd.
POSITION : Trainee Supervisor DURATION : June 2004 to November 2005.

Education

EDUCATIONAL QUALIFICATION:

Graduation: B.E. in Mechanical Engineering from Mailam Engineering college,Affiliated to University of Madras, Chennai in the year April 2004.

Reviews

Related