
Kajal Saha
Senior Highway Engineer
Hire this person
Send a job offer directly to this candidate
About
To associate with an esteemed organization where I can develop my positive potential and skill to its maximum which could co-operate in the achievement of the Organization goal. To contribute my level best and proof myself different from the others, No matter for which organization I work.
Experience
Junior Engineer at KESHEERAABAD CONSTRUCTION PVT.LTD (2015-11 – 2016-12)
Six-laning pune to satara section NH4 km 725.000 to 865.350 length km 140.350 state of Maharastra, PUNE. Client: NHAI
- Responsible for picking the cross section giving string level for sub-base course, base course, RE wall and Kerb execution
Site Engineer at ECI ENGINEERING AND CONSTRUCTION PVT.LTD (2016-12 – 2017-03)
2 laning of hazaribag to bijupara road project from design km 0+000 to 105+000 SH-7, Jharkhand, Ranchi. Consultants: KMC. Client: SHAJ
- Responsible for picking the cross section giving string level for sub-base course, none bituminous base course (GSB, WMM), bituminous basecourse (DBM, BC)
Site Engineer at ECI ENGINEERING AND CONSTRUCTION PVT.LTD (2017-03 – 2020-11)
Fore laning of Dimapur – Kohima road from design km 123.840 to 138.775 excluding Dimapur & Kohima bypass, in the state of Nagaland through an engineering, procurement and construction (EPC) Contract under SARDP-NE. Client: NHIDCL
- Responsible for picking the cross section giving string level for DLC, PQC, KERB Execution, sub-base course, none bituminous base course (GSB, WMM, CTB), bituminous basecourse (CRL, DBM, BC) breast wall, retaining wall, etc.
Senior Highway Engineer at NITIN SAI CONSTRUCTION PVT.LTD (NSC) (2020-11 – 2023-12)
Construction of two laning hard shoulder of Changtongya to Longleng road work from existing km 0.000 to km 16.952 [Design km 0.000 to km 18.779] in the state of Nagaland under NH-702 Plan on EPC mode (PKG-1). Client: NHIDCL. Consultant: M/s TASPL in association with JIPL.
- Responsible for picking the cross section giving string level for Execution, sub-base course, none bituminous base course (GSB, WMM, CTB), bituminous basecourse (DBM, BC), Cross beriyar, Junction development, breast wall, retaining wall, gabion wall construction
Senior Highway Engineer (Lead) at M/S MP AGARWAL PVT.LTD (2023-12 – 2024-05)
Construction of balance work of the 4 laning of the section from Jorhat – Jhanji NH-37(Old) PKG-III, Road work from km 477.000 to km 490.800 (13.800km) SARDP under EPC mode. Client: NHIDCL
Sr Highway Engineer at M/S VERTEX CONSTRUCTION (2024-05 – Present)
Construction of 2 laning with hard shoulder of Peren – Dimapur section on NH-129A from Design km 163.592 to km 173.850 (Length 10.258km) in the state of Nagaland on EPC mode (PKG-IV) under NH(0) TSP. Client: NHIDCL. Consultant: M/s Agnitio Infrastructure Project Pvt.Ltd, in JV With M/s Infrastructure Development Consultants.
- Assists the project manager in overseeing various aspects of the project, including planning, progress monitoring and ensuring adherence to project goals
- Leading and managing the entire project lifecycle, including planning, design construction
- Overseeing and mentoring junior engineers, supervisors of technical excellence
- Conducting site assessments and feasibility studies, identifying potential issues and solutions
- Maintaining quality standards throughout the project, including materials, workmanship, and safety
- Identifying and address potential issues, collaborating with the PM to find solutions
- Purchase and maintain equipment
- Contribute to identifying lessons learned from the project to improve future project
- Assist with the process of handing over the completed project to the client
Education
Madhyamik PASS (2012)
Diploma In Civil Engineering in Civil Engineering (2015)
