Kishan Jankar
Apprentice Electrician
Hire this person
Send a job offer directly to this candidate
About
To Achieve The Defined Goals By Adopting New Ideas In Profession Of Electrical Engineering Maintenance And Projects For that Industries And This Will Give Advantage To My Employer.
Experience
Apprentice Electrician - Atra Pharmaceuticals pvt Ltd - H-19 waluj MIDC
Join at This industry in as Apprentice Electrician Role.
- Learn About industry Machine working and do an for field work (actually practical work) knowledge of Electrical System
- Learn Electrical Maintenance And other General maintenance and Learn about some Documents
- Learn about responsibility of Electrical System Plus HVAC System And there Documents
- Learn And work Electrical Maintenance and Dg set , transformer Air Compressors, Boiler , Chillers, HVAC System and water System
APP Role (Trainee) - Atra Pharmaceuticals pvt Ltd - H-19 waluj MIDC
Join Trainee in that's Industry
- Work at Electrical Maintenance Department I Will Supot to our team for work faster and proper
- Work production as well as service flower and Utility Area
- Work in RM Store, pm Store and BSR/FGS Stores machine and weighing scale balance maintenance work equipment calibration process
- Preventive maintenance equipment list
Jr. Officer Electrical Maintenance - Atra Pharmaceuticals pvt Ltd - H-19 waluj MIDC
Joining That Industries In As Jr. Officer Role in Electrical Maintenance
- Major Contribution In Electrical Maintenance And General maintenance
- Responsible for Operation and Maintenance & Documentation of HVAC, RLAF & Sampling Booth system
- Responsible telephone maintenance
- Responsible for Operation, maintenance and Documentation PW System Generation & Distribution Loop System
- Daily breakdown and Preventive maintenance of production and Utility Area
- Operation and maintenance of Utility ie air Compressor, Chillers, Boiler & Cooling Tower
- Review of all logbooks related to Engineering Department
- Preparation of engineering SOP , Annual Calibration planner, Preventive maintenance planner , HVAC Filter Cleaning Schedule
- In EHS Department work installation of smoke detector, MCP (manual call point), Smoke Detect Indicator, installation then Smoke Detectors Panel smoke zone tracking, Hooter Installation, monitoring and Maintenance
- Material Movement & man movement lift Installation and Maintenance
Project Installation & Commissioning - RV Life Sciences pvt Ltd - H-19 waluj MIDC
Major Contribution and Hands on Installation & Commissioning Activities During the Project
- HVAC System with BMS System and make RH Controling with Using Honeywell RH Controling System
- Purified Water System (Hydro pure) 3.5KL
- Process Equipment Granulation, Coating, Tablet Compression and Tablets Bulk , Packing
- Partion panel , Epoxy Flowering , Civil work Activity Support
- WIP and CIP System
- Review and Inspection of Project Drawings layouts. ( Civil, Electrical, HVAC, Utility piping, Area partion, Solar Panel, Smoke Detectors and fire Extinguisher position layouts )
- Supervision and Inspection of Work during execution
- Regular assessment of receiving material and work completion Compare to BOQ
- Safety Unloading and Shifting of Electrical Equipment And material
Maintenance Department APP Role - Endurance Technology pvt Ltd
Work in Maintenance Dept APP Role
- DF M/C work & other pressing M/C
- Welding Shops welding M/C maintenance work
- Cooling tower & fan operation and maintenance
- Take reading of all plants Energy meters and water meter reading
- Assembly line M/C maintenance
- Honda line M/C maintenance
- R/C line M/C maintenance
- PRF line M/C maintenance
- CNC M/C maintenance
- VMC line M/C maintenance
R&D Department APP Role Electrical Maintenance - Endurance Technology pvt Ltd
Works Again In APP Roll In R&D Dept Electrical maintenance work
- To check and Round in M/C Shop areas M/C
- Round at Air Compressor Room
- To check the machines wiring & problems
- To check the cooling tower motor pump and panel Current
- Switch off the Unwanted fans and Light's
- Solve the problems of machines
- Solved the major problem RS-45 machine Counting problem, adjustment of limit switches using nut-bolt and drill machine
- RS-30 Drop testing machine HMI Dropped out from panels wiring Damaged Cut wiring solve problem
- CAM Drum Machine Maintenance
- Disconnecting & Connecting Cam Drum M/C Trail ok done
- For all machine Shifting to G-45 wiring Disconnecting and Connecting All machine's input & output Supply
Ss control & F-15 TP Role - Precision Power products pvt Ltd
We have making Universal Battery for Indian Army Defence Security system
- Ex 2kw Battery Charger , 2.5kw Battery Charger
- In 2kw Battery Charger have 5 Cards are there 4 card are 500 watts And 1 Is 100 watt
- There are 6 O/P ie A B C D E F Name is given that outputs
- 1st to 4 O/P of card (ABCD) is same (500w) 6V to 28.5VDC And max current is 17.5 to 19 AMP
- And other 5 and 6 card (EF) is (100w) 2V to 28.5VDC And max current is E-3 AMP F-1 AMP Total Input AC current of 2 kw Battery Charger panel is 10.4 AMP
- Done HVIR test , Short Circuit test, Reverse polarity test, meter calibration
- Then panel is ok found we will take Heat run panels (checking working of panels properly 2 hr full load and ½ hr over load Heat Run
- Then Complete 100 panels we take Factory Inspection of that panels Govt DGQA Officer came to check the panels testing and checking of batteries properly charged using the charger
- Then Complete inspection the Inspector give report all panels
Education
Diploma - Electrical Engineering (D.E.E) - SBNM Polytechnic college chh. Sambhajinagar (2026)
ITI - Electronics Mechanic - Govt. ITI Nanded (2015 - 2017)
HSC - Science - B.P. College Gokunda, Kinwat (2015)
SSC - Bajrang madhymic Vidyalay Patoda (2013)
