Apprentice Electrician - Atra Pharmaceuticals pvt Ltd - H-19 waluj MIDC
Join at This industry in as Apprentice Electrician Role.
- Learn About industry Machine working and do an for field work (actually practical work) knowledge of Electrical System
- Learn Electrical Maintenance And other General maintenance and Learn about some Documents
- Learn about responsibility of Electrical System Plus HVAC System And there Documents
- Learn And work Electrical Maintenance and Dg set , transformer Air Compressors, Boiler , Chillers, HVAC System and water System
APP Role (Trainee) - Atra Pharmaceuticals pvt Ltd - H-19 waluj MIDC
Join Trainee in that's Industry
- Work at Electrical Maintenance Department I Will Supot to our team for work faster and proper
- Work production as well as service flower and Utility Area
- Work in RM Store, pm Store and BSR/FGS Stores machine and weighing scale balance maintenance work equipment calibration process
- Preventive maintenance equipment list
Jr. Officer Electrical Maintenance - Atra Pharmaceuticals pvt Ltd - H-19 waluj MIDC
Joining That Industries In As Jr. Officer Role in Electrical Maintenance
- Major Contribution In Electrical Maintenance And General maintenance
- Responsible for Operation and Maintenance & Documentation of HVAC, RLAF & Sampling Booth system
- Responsible telephone maintenance
- Responsible for Operation, maintenance and Documentation PW System Generation & Distribution Loop System
- Daily breakdown and Preventive maintenance of production and Utility Area
- Operation and maintenance of Utility ie air Compressor, Chillers, Boiler & Cooling Tower
- Review of all logbooks related to Engineering Department
- Preparation of engineering SOP , Annual Calibration planner, Preventive maintenance planner , HVAC Filter Cleaning Schedule
- In EHS Department work installation of smoke detector, MCP (manual call point), Smoke Detect Indicator, installation then Smoke Detectors Panel smoke zone tracking, Hooter Installation, monitoring and Maintenance
- Material Movement & man movement lift Installation and Maintenance
Project Installation & Commissioning - RV Life Sciences pvt Ltd - H-19 waluj MIDC
Major Contribution and Hands on Installation & Commissioning Activities During the Project
- HVAC System with BMS System and make RH Controling with Using Honeywell RH Controling System
- Purified Water System (Hydro pure) 3.5KL
- Process Equipment Granulation, Coating, Tablet Compression and Tablets Bulk , Packing
- Partion panel , Epoxy Flowering , Civil work Activity Support
- WIP and CIP System
- Review and Inspection of Project Drawings layouts. ( Civil, Electrical, HVAC, Utility piping, Area partion, Solar Panel, Smoke Detectors and fire Extinguisher position layouts )
- Supervision and Inspection of Work during execution
- Regular assessment of receiving material and work completion Compare to BOQ
- Safety Unloading and Shifting of Electrical Equipment And material
Maintenance Department APP Role - Endurance Technology pvt Ltd
Work in Maintenance Dept APP Role
- DF M/C work & other pressing M/C
- Welding Shops welding M/C maintenance work
- Cooling tower & fan operation and maintenance
- Take reading of all plants Energy meters and water meter reading
- Assembly line M/C maintenance
- Honda line M/C maintenance
- R/C line M/C maintenance
- PRF line M/C maintenance
- CNC M/C maintenance
- VMC line M/C maintenance
R&D Department APP Role Electrical Maintenance - Endurance Technology pvt Ltd
Works Again In APP Roll In R&D Dept Electrical maintenance work
- To check and Round in M/C Shop areas M/C
- Round at Air Compressor Room
- To check the machines wiring & problems
- To check the cooling tower motor pump and panel Current
- Switch off the Unwanted fans and Light's
- Solve the problems of machines
- Solved the major problem RS-45 machine Counting problem, adjustment of limit switches using nut-bolt and drill machine
- RS-30 Drop testing machine HMI Dropped out from panels wiring Damaged Cut wiring solve problem
- CAM Drum Machine Maintenance
- Disconnecting & Connecting Cam Drum M/C Trail ok done
- For all machine Shifting to G-45 wiring Disconnecting and Connecting All machine's input & output Supply
Ss control & F-15 TP Role - Precision Power products pvt Ltd
We have making Universal Battery for Indian Army Defence Security system
- Ex 2kw Battery Charger , 2.5kw Battery Charger
- In 2kw Battery Charger have 5 Cards are there 4 card are 500 watts And 1 Is 100 watt
- There are 6 O/P ie A B C D E F Name is given that outputs
- 1st to 4 O/P of card (ABCD) is same (500w) 6V to 28.5VDC And max current is 17.5 to 19 AMP
- And other 5 and 6 card (EF) is (100w) 2V to 28.5VDC And max current is E-3 AMP F-1 AMP Total Input AC current of 2 kw Battery Charger panel is 10.4 AMP
- Done HVIR test , Short Circuit test, Reverse polarity test, meter calibration
- Then panel is ok found we will take Heat run panels (checking working of panels properly 2 hr full load and ½ hr over load Heat Run
- Then Complete 100 panels we take Factory Inspection of that panels Govt DGQA Officer came to check the panels testing and checking of batteries properly charged using the charger
- Then Complete inspection the Inspector give report all panels