Safety Officer at QCON - RLOC TA-25 (2025-09 – 2025-12)
Assigned to look after the turnaround activities and regular documentation compliance with the RLOC facility
- Confined space
- Work at height
- Hot work
- Hydro jetting and milling
- Vehicle movement & critical lifting
- Hydro carbon waste management
- Radiography
- Replacement of piping spools and exchanger tubes
HSE Officer - PREZIOSO EMDAD at GASCO - HABSHAN-BAB (2019-11 – 2021-03)
TA-19 plant maintenance activities in HABSHAN-BAB GAS PROCESSING PLANTS
- Confined space
- Hot work & Hydrogen Sulfide monitoring
Client Safety Officer at QAFAC-QATAR (2019-02 – 2019-04)
Looked after activities in TA-2019 and complying QAFAC safety standards
- Confined space activity of reactors, tanks, Heaters and vessels
- Work at height
- Hot work
- Lifting and rigging
- PTW Audit
Safety Officer at QASCO-QATAR (2018-11 – 2019-01)
- Critical lifting and rigging
- Hot work
- Work at height
- Confined space in the Reformer
Safety Supervisor at HPCL-VRMP, L&T- HYDRO CARBON (2018-06 – 2018-10)
- Excavation
- Fabrication
- Scaffolding
- Lifting and rigging
- Welfare of work force
HSE Supervisor at BRIDGE AND ROOF CO.(INDIA)LTD (2017-11 – 2017-12)
CDU-I SHUT DOWN-HPCL-VR
- Cleaning of trays in the atmospheric column and replacement of mesh pads, packing in the vacuum column
- Removal of scaling on feed heating coils in the vacuum & atmospheric heaters
- Established and observed the safety procedures & controls for hot work, work at height and confined space activities
- Associated with Fire & safety Dept in checking of equipment, tools and Machinery for issuing safe work practice certification to the contractors
HSE Supervisor at PROJECTS DEPARTMENT (MECH)-HPCL-VR (2014-11 – 2017-05)
- Erection of steel structures for the new VGO PIPE lines, piping work of various dimensions from 18" to 2" for more than 2000m length, pumping station and conversion of crude tank (15 m height and 79 m dia) in to VGO TANK
- Successfully completed the undertaken job by establishing and implementing safety measures for hot work, work at height, confined space, crane operations and by establishing coordination and amicable relations among various contractors and working groups
- Dismantling of 40" LPG and 10" AMINO ACID gas pipe lines from the live unit and 61m high flair structure as part of VRMP (VISAKHA REFINARY MODERNISATION PROJECT)
- Avoided hazards posed by the hot work, working at height, confined space and crane movements in the live unit as well as in complex pipe racks
- Shifting the huge quantity of dismantled waste safely without affecting any worker and the other installations in the site
- Dismantling of old SRU UNIT very cautiously to eliminate and mitigate the adverse consequences
- Conducted maintenance work of floating roof naphtha storage tanks (14 m & 13 m dia) by following the safety measures for hot work, working at height and crane& vehicle movement
- Carried out the maintenance work of heat exchangers in the CDU-III, structural construction for HDS REACTOR in MS BLOCK and replacement of condensate pipeline for the crude tanks
- Completed the job in safe mode by following the safety measures for activities such as HOT WORK, VEHICLE MOVEMENT in live units, lifting & rigging, confined space and working at height
- Established and maintained the work place safety standards as per the standards established by the organizational safety policy
- Established coordination among various departments such as projects operations, maintenance, fire & safety and contractors by sharing information in time and without ambiguity
- Submitted the daily work progress or status to the concerned authority i.e. job engineer and rectifications of the deviations to the F&S DEPT
- Daily tool box and Controlled the worker's activities effectively by identifying the unsafe acts and conditions
- Stopped/checked the job completely when there was imminent danger to avoid the damage
- Observed and followed regularly JHA to conduct the jobs in safe hands and maintained documentation pertaining to the jobs
- Receiving Permits, checking its validity and appropriateness to the nature of job, contractor or sub-contractor, work place location or area and advised about preventive and proactive actions
- Preparation of Risk Assessment for the task and reviewing with the subcontractor
- Inspecting the site conditions, equipment and tools conditions & validity of the certifications issued by the FIRE & SAFETY DEPT and PPE OF THE WORKERS to avoid the penalties and other undesirable consequences
- Vital information about symptoms of health problems and remedies provided to the workers
- Knowledge about the positive safety culture, duty of care and the impact of accidents on human life, organization and environment imparted to the contractors and workers