Manish Kumar
PSD T&C ENGG
Hire this person
Send a job offer directly to this candidate
About
Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration. Developed positive working relationships with stakeholders to effectively coordinate work Activities Reviewed and edited technical documents in accordance with template requirements.
Experience
T&C ENGG-PSD - PPS INTERNATIONAL - PPS PLANT, INDORE & METRO
(2024-07)
- Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
- Developed positive working relationships with stakeholders to effectively coordinate work Activities
- Reviewed and edited technical documents in accordance with template requirements.
- Trained and mentored junior engineers, providing guidance and direction.
- Prepared Weekly Progress Reports & Monthly Progress Reports of the project & submitted the next working day plan to the client.
- Coordinated with GC and Client for any electrical issues arising in the project phase.
- Supervised all work undertaken and coordinated manpower at all working sites.
- Responsible for the installation of all mechanical and electrical equipment of the PSD system.
- Provided input to team leaders regarding areas for process and procedural improvement.
- Conducted rigorous quality assurance tests, identifying areas of improvement for product optimization.
- Managed electrical equipment testing and commissioning.
PSD SYSTEM EXPERT - MMMOCL - MUMBAI
(2023-06 - 2024-04)
- Regularly monitor the operational status of the PSD system during passenger service periods.
- Detect and troubleshoot any faults or malfunctions in the PSD system promptly.
- Analyse system logs and reports to identify potential issues and implement corrective measures.
- Collaborate with the maintenance team for more complex troubleshooting tasks.
- Develop and implement preventive maintenance schedules for the PSD system components.
- Ensure compliance with maintenance standards and safety regulations.
- Respond promptly to any reported issues or failures in the PSD system.
- Conduct thorough root cause analysis to identify the underlying problems and submit to the Client.
- Maintain accurate and up-to-date documentation of all maintenance activities.
- Generate reports on system performance, maintenance tasks performed, and any modifications made.
- Coordinate with the operations team to align PSD system activities with the overall metro line operations.
SITE ENGG - E2E MUMBAI METRO LINE 3 (MMRCL) Alstom/FANGDA Group Co. Ltd - MUMBAI
(2023-04 - 2023-06)
Managed installation of Full Height PSD System for Mumbai Metro Line 3 (Alstom/Fangda Group Co Ltd).
- Coordinated with signaling, civil, and other authorities for ease of installation.
- Conducted survey and verification for core cutting.
- Supervised all work undertaken and coordinated manpower at all working sites.
ELECTRICAL ENGG - AARADHANA ENGINEERING (KMRCL) CRRC - KOLKATA METRO
(2022-06 - 2023-04)
- Checking harnessing & cable connection to prevent connection error.
- Structure Equipment inspection.
- Involvement in all Testing.
- Preventive maintenance of PSD System.
- Testing & commissioning of half height PSD.
- Ensure smooth functioning of PSD system during Passenger Service Period.
- Interface testing with ATC Signalling system.
- Attend the mainline failure during operation hour.
- Software configuration and upgradation of PSD System.
- Various operating procedures including start-up, shut-down, paralleling, and downgraded operation.
- Preparation of maintenance procedures and instructions to enhance the service life of equipment of PSD Systems.
- Effective corrective maintenance procedures to reduce the downtime.
- Material management of PSD, signalling spares.
- Supervision of Defect Liability period (DLP) of PSD system.
- Fault identification on Main Line Revenue Service, rectification to troubleshoot, and Failure Analysis and preparation of a report.
- Downloading and analysing PSD logs
- Attending daily failure meeting with the operation team, Closure of preventive maintenance work orders.
INSTALLATION AND T&C ENGG - SHAKYA ENTERPRISE (CRRC/KMRCL) - KOLKATA
(2019-06 - 2022-06)
Worked on installation and testing of Full Height PSD systems for Kolkata Metro Rail Corporation Ltd (Zhuzhou CRRC Times Electric Co Ltd).
- Executed project activities including marking, installation, alignment, and commissioning of PSD systems.
- Conducted material inspections with Chinese CRRC Engineers.
- Prepared weekly & monthly progress reports for the project.
- Coordinated with clients for electrical issue resolutions.
- Supervised all site activities and manpower coordination
- Material management of PSD, signalling spares.
- Supervision of Defect Liability period (DLP) of PSD system.
- Fault identification on Main Line Revenue Service, rectification to troubleshoot, and Failure Analysis and preparation of a report.
- Downloading and analysing PSD logs
- Attending daily failure meeting with the operation team, Closure of preventive maintenance work orders.
Education
DIPLOMA - ELECTRICAL & ELECTRONICS ENGINEERING