T&C ENGG-PSD - PPS INTERNATIONAL - PPS PLANT, INDORE & METRO
(2024-07)
- Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
- Developed positive working relationships with stakeholders to effectively coordinate work Activities
- Reviewed and edited technical documents in accordance with template requirements.
- Trained and mentored junior engineers, providing guidance and direction.
- Prepared Weekly Progress Reports & Monthly Progress Reports of the project & submitted the next working day plan to the client.
- Coordinated with GC and Client for any electrical issues arising in the project phase.
- Supervised all work undertaken and coordinated manpower at all working sites.
- Responsible for the installation of all mechanical and electrical equipment of the PSD system.
- Provided input to team leaders regarding areas for process and procedural improvement.
- Conducted rigorous quality assurance tests, identifying areas of improvement for product optimization.
- Managed electrical equipment testing and commissioning.
PSD SYSTEM EXPERT - MMMOCL - MUMBAI
(2023-06 - 2024-04)
- Regularly monitor the operational status of the PSD system during passenger service periods.
- Detect and troubleshoot any faults or malfunctions in the PSD system promptly.
- Analyse system logs and reports to identify potential issues and implement corrective measures.
- Collaborate with the maintenance team for more complex troubleshooting tasks.
- Develop and implement preventive maintenance schedules for the PSD system components.
- Ensure compliance with maintenance standards and safety regulations.
- Respond promptly to any reported issues or failures in the PSD system.
- Conduct thorough root cause analysis to identify the underlying problems and submit to the Client.
- Maintain accurate and up-to-date documentation of all maintenance activities.
- Generate reports on system performance, maintenance tasks performed, and any modifications made.
- Coordinate with the operations team to align PSD system activities with the overall metro line operations.
SITE ENGG - E2E MUMBAI METRO LINE 3 (MMRCL) Alstom/FANGDA Group Co. Ltd - MUMBAI
(2023-04 - 2023-06)
Managed installation of Full Height PSD System for Mumbai Metro Line 3 (Alstom/Fangda Group Co Ltd).
- Coordinated with signaling, civil, and other authorities for ease of installation.
- Conducted survey and verification for core cutting.
- Supervised all work undertaken and coordinated manpower at all working sites.
ELECTRICAL ENGG - AARADHANA ENGINEERING (KMRCL) CRRC - KOLKATA METRO
(2022-06 - 2023-04)
- Checking harnessing & cable connection to prevent connection error.
- Structure Equipment inspection.
- Involvement in all Testing.
- Preventive maintenance of PSD System.
- Testing & commissioning of half height PSD.
- Ensure smooth functioning of PSD system during Passenger Service Period.
- Interface testing with ATC Signalling system.
- Attend the mainline failure during operation hour.
- Software configuration and upgradation of PSD System.
- Various operating procedures including start-up, shut-down, paralleling, and downgraded operation.
- Preparation of maintenance procedures and instructions to enhance the service life of equipment of PSD Systems.
- Effective corrective maintenance procedures to reduce the downtime.
- Material management of PSD, signalling spares.
- Supervision of Defect Liability period (DLP) of PSD system.
- Fault identification on Main Line Revenue Service, rectification to troubleshoot, and Failure Analysis and preparation of a report.
- Downloading and analysing PSD logs
- Attending daily failure meeting with the operation team, Closure of preventive maintenance work orders.
INSTALLATION AND T&C ENGG - SHAKYA ENTERPRISE (CRRC/KMRCL) - KOLKATA
(2019-06 - 2022-06)
Worked on installation and testing of Full Height PSD systems for Kolkata Metro Rail Corporation Ltd (Zhuzhou CRRC Times Electric Co Ltd).
- Executed project activities including marking, installation, alignment, and commissioning of PSD systems.
- Conducted material inspections with Chinese CRRC Engineers.
- Prepared weekly & monthly progress reports for the project.
- Coordinated with clients for electrical issue resolutions.
- Supervised all site activities and manpower coordination
- Material management of PSD, signalling spares.
- Supervision of Defect Liability period (DLP) of PSD system.
- Fault identification on Main Line Revenue Service, rectification to troubleshoot, and Failure Analysis and preparation of a report.
- Downloading and analysing PSD logs
- Attending daily failure meeting with the operation team, Closure of preventive maintenance work orders.