Skip to main content
Maskoor Alam

Maskoor Alam

Mechanical Engineer | Lead Execution

Talent
AlīgarhMember since October 14, 2026
ConstructionStructural Fabrication & ErectionPipe Rack Structural SteelPipingCivil & StructuralEquipment ErectionHydro testingPre-commissioning & commissioningRate analysisRate analysis of Extra workAHP & CHP
·

Hire this person

Send a job offer directly to this candidate

ConstructionStructural Fabrication & ErectionPipe Rack Structural SteelPipingCivil & Structural

About

Mechanical Engineer and execution leader with extensive experience delivering structural steel fabrication and erection, pipe rack, piping, and equipment projects. Skilled in coordinating clients, consultants, contractors, and subcontractors; monitoring project progress; and managing site teams of up to 600 workers. Focused on safe execution, quality, schedule adherence, and project profitability across large-scale industrial projects.

Experience

Lead Execution - Sharp Tank Structural Pvt Ltd, A Zeywerk Company - Barauni, Begusarai, Bihar, India

(2025-10 - 2026-09)

IOCL Barauni Refinery BR-9 Expansion Project. Mechanical Pipe Rack, Civil & Structural works, Offsite Expansion Project BR-9. Fabrication & Erection Consultant: TOYO ENGINEERING INDIA PVT LTD.

  • Contribute to an offsite pipe rack, civil, and structural steel project, coordinating project-wide construction activities.
  • Manage structural steel fabrication, painting, and erection activities across the project workload.

Mechanical Lead Engineer - VRC Construction (India) Ltd. - Panipat, Haryana, India

(2025-01 - 2025-09)

IOCL Panipat Refinery Expansion Project (P-25). Mechanical Pipe Rack, Civil & Structural works-1 Offsite Expansion Project (P-25). Fabrication & Erection Consultant: Engineers India Ltd.

  • Supported an offsite pipe rack, civil, and structural steel project through management of construction activities.
  • Managed structural steel fabrication, painting, and erection across the project workload.

Site In-Charge - Zuberi Engineering Construction Pvt Ltd. - Pachpadra, Barmer, Rajasthan, India

(2024-02 - 2024-11)

HPCL Rajasthan Refinery Ltd. Mechanical Pipe Rack, Civil & Structural Steel works C&S-V, Fabrication & Erection. Consultant: Engineers India Ltd.

  • Led site construction for an offsite pipe rack, civil, and structural steel project.

Mechanical Lead Engineer - RSB Project Ltd. - Pachpadra, Barmer, Rajasthan, India

(2022-07 - 2024-01)

HPCL Rajasthan Refinery Ltd. Mechanical, Pipe Rack Structural Steelworks III & IV, Fabrication & Erection. Consultant: Engineers India Ltd.

  • Managed construction activities for an offsite pipe rack and structural steel project.

Lead Engineer (On Contract Basis) - Bridge & Roof Co(I)Ltd. - Pachpadra, Barmer, Rajasthan, India

(2021-03 - 2022-05)

HPCL Rajasthan Refinery Ltd. Mechanical Works–II (Part-A) of Residual Utility & Off Site Pipe Rack Structural Steel works II & III. Consultant: Engineers India Ltd.

  • Led site execution for an offsite pipe rack structural steel project.

Lead Engineer (On Contract Basis) - Bridge & Roof Co (I) Ltd. - Bina, Madhya Pradesh, India

(2019-06 - 2020-10)

Bharat Oman Refineries Ltd. Mechanical Works Expansion Projects Unit Kerosene Hydrodesulphurization. Consultant: Engineers India Ltd.

  • Oversaw equipment erection at the dispatch terminal.
  • Coordinated with senior management, the client, consultants, and other management stakeholders to maintain work progress.
  • Contributed to overall project profitability and offsite pipe rack structural steel work.

Site In-Charge - M/s DESEIN INDURE PVT LTD. - Harduaganj, Aligarh, Uttar Pradesh, India

(2018-08 - 2019-06)

Extension II Thermal Power Station 1X660 MW. Installation of AGP Ash Handling System Package, 1X660 MW Project, Cost.-135Cr. Consultant: Toshiba JSW Power Systems Pvt Ltd.

  • Managed ash handling system pipe and equipment erection, testing, and commissioning.
  • Held responsibility for construction of pipeline laying, terminal piping, MULA erection, and associated jetty piping, plus electrical and instrumentation work for the substation and control room building, including procurement.
  • Worked with senior management, the client, and consultants to clarify requirements and support project completion and profitability.
  • Executed bulkhead fabrication and bend insertion, and double-wall metallic pipe-in-pipe laying with izoflex insulation.

Site In-Charge - M/s DESEIN INDURE PVT LTD. - Lara, Raigarh, Chhattisgarh, India

(2016-06 - 2018-08)

NTPC Limited 2X800 MW Super Thermal Power Project. Mechanical Works, Ash Handling System Package 2X800 MW Project. Project Cost.-270 Cr. Consultant: NTPC Ltd.

  • Prepared rate analyses for extra work.
  • Managed pre-commissioning and commissioning activities for ash handling system pipe and equipment erection, testing, and commissioning.

Site In-Charge - M/s DESEIN INDURE PVT LTD. - Lara, Raigarh, Chhattisgarh, India

(2015-05 - 2016-06)

NTPC Limited 2X800 MW Super Thermal Power Project. FDPS (Fire detection & Protection System) Project. Project Cost.-230 Cr. Consultant: NTPC Ltd.

  • Managed erection of water wall panel piping and equipment erection and testing.
  • Coordinated the lifting of client-supplied materials to support site progress.

Site In-Charge - M/s DESEIN INDURE PVT LTD. - Janjgir Champa, Chhattisgarh, India

(2012-08 - 2015-05)

ABIR Infrastructure Pvt Ltd / Athana Chhattisgarh Power Ltd 2X600 MW. Mechanical Works, Ash Handling System Package 2X600 MW Project. Project Cost.-260 Cr. Consultant: Athana Chhattisgarh Power Ltd.

  • Managed erection of water wall panel piping and equipment erection and testing.
  • Coordinated the lifting of client-supplied materials to support site progress.

Education

B.E. - Mechanical Engineering - IMPERIAL INSTITUTE OF MANAGEMENT SCIENCE & RESEARCH (NEW DELHI) (2012)

Intermediate - Bihar Intermediate Education Patna (1998)

B S E B Patna (1994)

Skills

Mechanical EngineerLead Execution

Reviews

Related