Skip to main content
Mohanraj Munisamy

Mohanraj Munisamy

Efficient Production manager with vast experience of more than 30 years with special focus in windmill turbines

Talent
Karnataka, INMember since September 3, 2026
Mechanical AssemblyFabricationBlastingPaintingPackingWind Turbine Assembly
·

Hire this person

Send a job offer directly to this candidate

Mechanical AssemblyFabricationBlastingPaintingPacking

About

Efficient Production manager with vast experience of more than 30 years with special focus in windmill turbines. Heading five departments at present and handling of jobs with small groups for prompt delivery. Have exposure to Mechanical Assembly (Nacelle, Generator & Hub assembly), Fabrication, Blasting, Painting and Packing department as Deputy Manager.

Experience

Deputy Manager - M/s Winomechanic private limited, M/s Leitwindshriram manufacturing Ltd - India

(2009-02 - 2026-07)

Company name has changed but same company from 2009 to 2019.

  • Assembled more than 80nos of LTW77, 100nos of LTW80 models 1.5Mw and 28nos of LTW80 1.80Mw Nozzles, Generator and Hub (wind turbine Generators WTGS) without foreigners.
  • Led the Fabrication team and fabricated 1.50MW rotors and 1.80MW rotors and Direct Drive Stators.
  • Assembled 4 nos of Direct Drive motors for Ropeways.

Executive Erection and Service - M/s. Divine Wind Technik - India

(2004-08 - 2009-02)

  • Assembled, erected and commissioned 14nos of Elecon Turbo Wind 600KW WTG in Tamilnadu, Gujarat and Maharastra Region.
  • Erected 08Nos of GE 1.5mw WTG in Radhapuram Region.
  • De-erected 01 No of GE 1.5 mw WTG.

Technical Specialist and EHS Leader for India - M/s. GE Wind Energy - India

(2002-05 - 2004-08)

  • Led the mechanical erection and maintenance team.
  • Led the EHS department for all over India.

Technical Specialist - M/s Tacke Wind Technik, Enron wind and Tacke Wind Energy India Pvt. Ltd. - India

(1995-09 - 2002-05)

  • Assembled and erected 01Nos of Tacke TW600KW WTG in Muppandal Region.
  • Assembled Tacke TW600a WTG 14 Nos along with German Engineers and erected the machine without German Engineers.
  • Assembled 12Nos of Enron 750i WTG along with Spanish Engineers.
  • Erected 07Nos of Enron 750i WTG in Tamilnadu, Maharastra Region.
  • Led the Mechanical Erection and Maintenance Team.
  • De-erected 01Nos of Tacke TW600 WTG, 06 Nos. of Tacke TW600a WTG and 01Nos of Enron 750i WTG.
  • Went to Germany and Spain for Training of TW600, TW600a KW WTG for Special work, assembly of Enron 750i and 1.5mw WTG and erection work.
  • Assembled 02Nos of Tacke 900kW WTG in Chennai factory.

Technician in erection and maintenance - M/s. Flovel Tacke - India

(1995-05 - 1995-09)

  • Assembled 05Nos of Tacke TW600KW WTG and erected in Gudimangalam, Udumalpet Tamil Nadu Region.

Education

S.S.L.C - S.S.L.C

Millwright Maintenance Mechanic - Mechanical - MRL Institute

Diploma in Mechanical Engineering - Mechanical Engineering - Vinayaga Mission University

Reviews

Related