Sr. Production Engineer in Machine Shop in Fabrication Division at Frontier Alloy Steel Ltd (Present)
Senior Mechanical Engineer with 8 years of Experience in Production Planning and control (PPC), Production Scheduling, Capacity Planning, Inventory Management, and coordination with Production, Purchase, and Quality Teams. Skilled in ERP/M.S. Excel, Production Monitoring, and Process Improvement.
- Machining of all railway Bogie's and bogie's brackets and to check quality of bracket materials.
- I have knowledge of all Engineering Drawings.
- I have knowledge of all types of tools, and accessories of Machines.
- Responsible for my shop floor Management in My Machine shop.
- Responsible for operations, production, preventive & breakdown Maintenance of all machines (CNC PLANOMILLER and all Lath Machine, Drilling Machine and Milling Machine) of machine shop.
- 8 years experience in Tool Room and to make Zigs & Fixtures of Railway Bogie's Brackets and MachineryParts and Indian Railway Bogies.
- Man power handling 50 to 70 operators and helpers and to make proper production planning.
- To make process improvements and develop process control procedures.
- Work following safety manual guidelines at all times. Observe good machine shop practices maintaining highest level of working environment.
- Works in conjunction with Manufacturing Engineering & other Fabrication Departments to ensure smooth & continuous workflow.
- Assists in training of new workers.
- Read engineering prints and interpret tolerances and fits. Develop optimal machining/fabrication process to make parts per given specifications.
- Makes recommendations to management for the purchase of new equipment as well as repairs & upgrade of existing equipment.
- Provide adequate training for department personnel.
- Skilled in CNC Programming and machining.
- Prepared daily, Weekly, and Monthly Machining Production Plans.
- Coordinated with purchase, stores, production, and Quality Departments.
- Monitored machining Production targets and Ensured on time delivery.
- Planed Material Requirement and controlled inventory levels.
- Reduced Production Delays through effective Planning.
- Improved Production efficiency by optimizing schedules.
- Improved on time delivery from 85% to 96%.
- Reduced inventory holding by 15%.
- Increase production efficiency by 10%.
- Reduced Machine ideal time through better Planning.
Supervision at KANSAI NEROLAC PAINT PVT.LTD
6 Months experience in Chilling Department for the post of Supervision.