Project Engineer & Drafting in AUTOCAD MEP Division, (Electrical) - GIGA POWER SOLUTION - Pondicherry
(2024-12 - 2026-02)
- Execution of Internal & HT/LT Electrical Works.
- Carried out Internal Electrification package planning and execution works.
- Preparing timelines for MEP works for projects in coordination with planning dept.
- Prepare the Estimate and Cost of materials, issue the Work order and prepare the Contractor bills (coming under Electrical section).
- Design and Review of BOQ /General Arrangement of Switchyard, Power Transformer, Control Panel & Relay Panel schematics and Cable schedule for Electrical, Telecom & instrument.
- Substation Calculation, Cable Sizing calculation, Cable Tray Routing, (HV and LV) sizing and calculation.
- Design and Review of Plan, Sectional View & Elevation for Tray routing, Clearance & Check diagram for Earthing & Grounding and Cable Tray Routing.
- Design and Preparation of concern Drawing using latest AUTOCAD (2007 and 2010) versions.
- Designing and Drawn in Power layout, Lighting and Small power layout, Telecom layout, Fire detection and alarm system layout, HVAC layout, Cable tray trunking system of various MEP projects.
- Design and detailed Engineering of Switchyard and SLD for ACDB, DCDB, HT & LT Panel.
- Provided layout drawings and technical guidance as per the ADNOC Standard.
Project Engineer - ks mani ELECRICALS - Pondicherry
(2022-06 - 2024-02)
- Preparation of Bill of Material (BOM) & Bill of Quantity (BOQ).
- Execution of Internal & HT/LT Electrical Works.
- Carried out Internal Electrification package planning and execution works.
- Preparing timelines for MEP works for projects in coordination with planning dept.
- Quantity Analyzing for Monthly and Fortnight work.
- Prepare the Estimate and Cost of materials, issue the Work order and prepare the Contractor bills (coming under Electrical section).
- Coordinated CCTV, Networking and Telephone lines installation work.
- Procurement of materials and intend preparation work and Certification of Bills related to Electrical work.
- Substation Calculation, Battery sizing, Cable Tray Routing, Power cable (HV and LV) sizing and calculation.
Technical Assistant - Project Implementation Agency, GOVT. OF Pondicherry - Pondicherry
(2013-03 - 2022-04)
- Conversion of Existing Overhead LT line to U.G. Cable conversion Detailed Project Report and Estimate prepared for an amount of Rs.90 Core. (13.86 Million USD).
- Performed on-site field surveys and wrote technical narratives to document processes and design changes.
- Tender Document preparation as per world Bank Norms.
- Designing, Cable Scheduling and Laying of HT & LT Distribution system.
- Laying of 1.1KV LT U.G. Cables for the Consumers (House hold Service connections) over the sea shore Under the Coastal Disaster Risk Reduction Project (Funded by World Bank).
- Supervising the U.G. Cable conversion work executing the entire coastal stretch of Puducherry Oversaw teams of electrical contractors focused on installing Underground cable and Ring Main systems (RMU) for HT/LT UG cable conversion projects.
Planning Engineer (Staff trainee) - supreme indstries limited - Pondicherry
(2012-05 - 2013-03)
- Production planning as per Marketing delivery order & updating the EDOM.
- Reporting to Production Manager and Responsible for Daily Production.
- Responsible for work on Daily OEE Report & ERP Entry & MRM Reports.