Highway Engineer
Send a job offer directly to this candidate
I have 8 years of experience in Construction State & National Highway projects as a Supervisor and Foreman. Knowledge of work procedures. Responsible in preparing and checking of RFIs. Preparation of Earth work, GSB, CTSB, WMM, CTB, ARL, DBM, BC, DLC, RE-WALL. Preparation of Day to Day Monitoring programmes. Responsible in preparing the Monthly Programme. Familiar with the computer programs like Ms-Office, Excel.
Supervisor (Highway) - Barbrik Project Limited - Chhattisgarh
(2016-10 - 2018-12)
Rehabilitation and Up-Gradation of NH-43 from KM. 180+000 to 241+000(Bedma to Dahikonga) in the state of Chhattisgarh Two lanes with paved shoulder under NHDP-IV phase on EPC basis. Client: Chief Engineer, NHDP-IV PWD Chhattisgarh. Consultant: Bloom Companies, LLC USA.
Supervisor (Highway) - D.P jain & company infrastructure private limited - Maharashtra
(2018-10 - 2019-12)
Malegaon to Rishod KM. Ch-0±000 to ch-45+000 DLC, PQC two line with paved shoulder in the State of Maharashtra.
Supervisor (Highway) - PR. Agrwal private limited - Maharashtra
(2019-01 - 2021-12)
Mansar to Tirora km. Ch-0+000 to ch-87+030 DLC, PQC Two lane with paved shoulder in the state of Maharashtra.
Sr. Supervisor (Highway) - Dp jain co & infrastructure Pvt Ltd. - Tamil Nadu
(2021-01 - 2022-12)
Construction of four lane Bangalore Chennai expressway from Ch-204+500 to ch-230+000 (Arakkonam to kancheepuram Section in the state of Tamil Nadu) under bharatmala on Hybrid annuity mode (Phase-III package-III).
Sr. Supervisor (Highway) - DRA Infracon Pvt. Ltd. - Haryana
(2022-09 - 2023-11)
Construction of Six-Lane Access controlled highway from Junction with Jaitpur-Pushta road to Junction with sector 62-65 dividing road on Faridabad-Ballabhgarh bypass to Junction with KMP Expressway with NH-148 NA from design CH. 09+000 to 59+000 (Pkg-II & Pkg-III) in the state of Haryana on Hybrid Annuity Mode.
Highway Engineer - RP Infraventure Pvt Ltd - Uttar Pradesh
(2023-11 - 2025-12)
Improvement and Upgradation of Existing Road to 4 lane with Paved Shoulder from Km 229.070 to 260.800, End of Hardoi District to Lucknow of NH 731 on EPC basis in the state of Uttar Pradesh.
Highway Engineer - Dynasty Promoters Pvt Ltd - Uttar Pradesh
(2025-03)
Rehabilitation And Upgradation of Salon - Jais - Jagdishpur Road Section of NH 931A, From Design Chainage Km 0.000 to Km 5.740 to Four Lane Divided Carriageway and From Design Chainage Km 5.740 to Km 53.500 to Two Lane with Paved (Total Design Length 53.500 Km) Along with One Time Improvement in 04 No's of Realigned/Bypassed Built-Up Areas in a Total Length of 9.732 Km in the State of Uttar Pradesh on EPC Mode.
10th - U.R.S Inter college bhaw siya kunda pratapgarh
12th - U.R.S inter college bhaw siya kunda pratapgarh
B.A. - prof. Rajendra singh (Rajju bhaiya) university of prayagaraj
Diploma - civil engineering - Rajasthan