Quantity Surveyor - Rathinam College
(2025-07)
Working as a Quantity surveyor in this project team
- Taking BOQ & BBS (Bill of Quantity) from GFC Drawings for each item of works
- Taking the estimate for (Residential buildings & houses)
- Check the bills completion work for every vendors
- Check the others Civil Vendors Quotations for doing upcoming work (with including Measurement) except interior work
- Taking Materials stock for every site month wise to maintain reports
- Weekly once inspect the site to check the site cleaning & materials wastages & quality checking
Quantity Surveyor - Nambi + Partners
(2024-08 - 2025-07)
Worked as a Quantity surveyor in this team
- Check the civil Vendors bills from the given contractor to clear the bills in one week
- Array the Bill of Quantity with rates doing Estimation work for residential buildings, Factories
- List of Projects (BOQ Prepared) only civil works – a) Aparna Aravind – Peelamedu b) Skyfast factory – Bodipalayam c) Skyfast - Power House Expansion
- Check the comparsion for bills (with BOQ and Billed Quantity) to prepare the overall statement
- Check the others Vendors Quotations to check with previous rates
Quantity Surveyor - Sri SS – Prathein Infrastructure - Ambur
(2022-04 - 2023-05)
Worked as a Quantity surveyor for Highway project
- Raise the RFI (Request for Inspection) for Daily work details mention with time & date with contact person
- Array Measurement Quantities which have been in drawing
- Check the daily concrete actual Production concrete quantity & Site Concrete quantity
- Write RFI daily which work have been done in site and attached with all measurement, checklist, to get approval from PMC
- Weekly completed bill & submission work
Billing Engineer - Sri Vignesh Plumbing Works
(2019-07 - 2021-12)
- All Credit- purchase materials bills for various sites should be entered in monthly wise within the month Ending. Current statement should be submitted that how many payment should be done from month to month
- Maintaining petty cash Accounts monthly and submitted to MD
- Preparing the statement for invoice bill payment which are not received
- Preparing the Present, Previous, Cummalative bills for every project of the site
- Typing the letters to the client regarding pending payment issues
Billing Engineer - Praswathi Plumbing Works
(2018-12 - 2019-01)
- Writing JMR-book as per the work is completed
- Draw the (As built drawing) of the toilets where the internal water line & waste line are laying according to direction with key plan
- Checking the Pressure testing for water line & waste line (including the initial & final testing)
Junior Site Engineer - Ramani Realtors Coimbatore - Coimbatore
(2014-12 - 2016-01)
For the project of Coconut Grove, Singanallur, Coimbatore. Silt +3 Apartment.
- Taking sub contract bills (mainly civil works) every week checked & submitted on Thursday
- Taking Daily work reports in every day & labour outturn every day
- Checking the work is done without wastage of materials
- Proper management of materials & workmanship
Junior Quantity Surveyor - KCM Construction
(2013-06 - 2014-01)
Office work
- Array the bill of quantities from drawings
- Calculate the materials which are been require for site
- Maintaining site accounts every week