Experienced consultant with expertise in highway design, traffic engineering, and road safety auditing. Registered consultant with the Ministry of Road Transport and Highways. Specialized in feasibility studies, DPR preparation, survey work, and LiDAR technology implementation for road projects.
Experience
Not associated with any Organisation - No Work - India
(2013-06 - 2014-07)
Highway Design Engineer - Pavetech Consultants - India
(2014-08 - 2017-05)
Worked on multiple highway design and infrastructure projects as Highway Design Engineer
- Four Lanning of Chakan-Shikrapur Road SH-55 (Km 24/000 to Km 53/000) on Built Operate & Transfer Basis (BOT) for District Pune, Maharashtra - Project Cost: ₹377.91 Cr (01/08/2014 - 15/03/2015)
- Rehabilitation and upgradation of NH12A from Design Ch.191.422 to Ch.242.300 (Chilpi - Kawardha Section - Package-I) in Chhattisgarh to 2-Lane with paved shoulder under NHDP-IV Phase on EPC Basis - Project Cost: ₹170.25 Cr (16/03/2015 - 31/07/2017)
- Two lane with Paved Shoulders Project for NH848 sections in Nashik District (Km 16/000 to Km 34/000, km 39/000 to 57/000 & km 62/000 to 65/600) - Project Cost: ₹289.60 Cr (16/03/2015 - 31/07/2017)
Senior Highway Design Engineer / Acting Team Leader - RJ CONSULTANCY SERVICES - India
(2017-08 - 2019-10)
Worked as Senior Highway Design Engineer and Acting Team Leader on consultancy services for DPR and feasibility studies
- Consultancy Services for Feasibility study cum DPR, Survey & Preparation of Land plan for Ashtavinayak Roads (Package No. PN-05) including 8 temple sites with total proposed length of 266.49 Km for Public Works Department, Maharashtra - Project Cost: ₹705.63 Cr (01/08/2017 - 31/10/2019)
- Consultancy Services for Feasibility study cum DPR, Survey & Preparation of Land plan for Package No. PN4A (Belhe-Loni-Pabal-Shikrapur-Ashtapur-Uralikarhan-Jejuri - 106.093 Km) and Part 2 PN-4B (Morgaon-Baramati-Kalmb-Bawada-Narsingpur - 86.384 Km) with total length 192.477 Km for Public Works Department, Maharashtra - Project Cost: ₹427.61 Cr (01/08/2017 - 31/10/2019)
Traffic Engineer cum Road Safety Auditor - Indian Infratech - India
(2019-11)
Currently working as Traffic Engineer and Road Safety Auditor on multiple highway construction and safety projects
- PKG-7 Construction of Six lane Access Controlled Nagpur-Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) Km 296.000 to Km 347.190 (Village Banda to Village Sawargaon Mal) in District Buldhana - Project Cost: ₹1,906.99 Cr (01/11/2019 - 10/12/2022)
- Rehabilitation and Upgradation of 2 lane road with paved shoulders of Naigaon Bandi to Mangrulpir NH 161A (Km 40/000 to Km 75/000) - Total Length 35.0 Km - Project Cost: ₹152.19 Cr (20/11/2019 - 15/12/2021)
- Improvement to Road No. NAG-131 from Ghorad at Seloo takuka to Sirasgaon (SH-321) District Wardha (Design Km 61+700 to Km 112+360) on Hybrid Annuity Mode - Project Cost: ₹179.32 Cr (01/01/2020 - 08/04/2021)
- Construction of Two Laning with Paved Shoulder to HAM NAG-127 (SH-344, MDR-27 & MDR-14, SH-347) Total length 63.573 Km - Project Cost: ₹148.20 Cr (01/01/2020 - 28/02/2022)
- NSK-65 Part-A Improvement of Chopda Khedi Bhokar Amoda Kanalda Jalgaon Pachora Wadi Satgaon Bharadi road SH40 (42.80 Km) and Part-B Improvement of Haripura Yawal Takarkheda Nimgaon Bhadli Asoda Jalgaon Road (20.00 Km) - Project Cost: ₹183.00 Cr (16/04/2020 - 20/06/2022)
- Four Laning of existing 2-laning stretch from Mohol at Km 0.000 to Wakhri at Km 44.700 (Pkg-1) on Mohol - Alandi Section (Design length 44.700 km) of NH-965 on EPC mode for National Highways Authority of India - Project Cost: ₹799.70 Cr (12/08/2020 - 31/08/2023)
- Four Laning of existing 2-laning stretch from Khudus at km 77.800 to Dharmapuri at km 117.000 (Pkg-3) on Mohol - Alandi Section (Design length 39.200 km) of NH-965 on EPC Mode - Project Cost: ₹733.17 Cr (12/08/2020 - 31/08/2023)
- NSK-72 Improvement to Bhikangaaon - Pal - Khiroda - Savada - Amoda Road SH-45 (Km 0/000 to Km 40/000) to Two Lane with Paved shoulder on Hybrid Annuity Mode - Project Cost: ₹98.65 Cr (18/08/2020 - 23/12/2021)
- Rehabilitation and up-gradation of Sabalkhed to Ashti section (Km 37/900 to Km 55/100) and Chinchpur to Jamkhed section (Km 70/000 to Km 72/922) of NH-561 to Two lanes with paved shoulder/Four lane configurations (Length 20.122 Km) on EPC mode - Project Cost: ₹183.80 Cr (01/06/2023 - 11/04/2025)
- Appointment of Safety Consultant for Four Laning of Tuljapur- Ausa section of NH-361 (Km 0.000 to Km 55.835 including Tuljapur bypass 11.593 km) on Hybrid Annuity Mode for National Highways Authority of India (NHAI) - Project Cost: ₹911.07 Cr (14/06/2023 - Ongoing)
Education