Not associated with any Organisation - No Work - India
(2013-06 - 2014-07)
Highway Design Engineer - Pavetech Consultants - India
(2014-08 - 2017-05)
Worked on multiple highway design and infrastructure projects as Highway Design Engineer
- Four Lanning of Chakan-Shikrapur Road SH-55 (Km 24/000 to Km 53/000) on Built Operate & Transfer Basis (BOT) for District Pune, Maharashtra - Project Cost: ₹377.91 Cr (01/08/2014 - 15/03/2015)
- Rehabilitation and upgradation of NH12A from Design Ch.191.422 to Ch.242.300 (Chilpi - Kawardha Section - Package-I) in Chhattisgarh to 2-Lane with paved shoulder under NHDP-IV Phase on EPC Basis - Project Cost: ₹170.25 Cr (16/03/2015 - 31/07/2017)
- Two lane with Paved Shoulders Project for NH848 sections in Nashik District (Km 16/000 to Km 34/000, km 39/000 to 57/000 & km 62/000 to 65/600) - Project Cost: ₹289.60 Cr (16/03/2015 - 31/07/2017)
Senior Highway Design Engineer / Acting Team Leader - RJ CONSULTANCY SERVICES - India
(2017-08 - 2019-10)
Worked as Senior Highway Design Engineer and Acting Team Leader on consultancy services for DPR and feasibility studies
- Consultancy Services for Feasibility study cum DPR, Survey & Preparation of Land plan for Ashtavinayak Roads (Package No. PN-05) including 8 temple sites with total proposed length of 266.49 Km for Public Works Department, Maharashtra - Project Cost: ₹705.63 Cr (01/08/2017 - 31/10/2019)
- Consultancy Services for Feasibility study cum DPR, Survey & Preparation of Land plan for Package No. PN4A (Belhe-Loni-Pabal-Shikrapur-Ashtapur-Uralikarhan-Jejuri - 106.093 Km) and Part 2 PN-4B (Morgaon-Baramati-Kalmb-Bawada-Narsingpur - 86.384 Km) with total length 192.477 Km for Public Works Department, Maharashtra - Project Cost: ₹427.61 Cr (01/08/2017 - 31/10/2019)
Traffic Engineer cum Road Safety Auditor - Indian Infratech - India
(2019-11)
Currently working as Traffic Engineer and Road Safety Auditor on multiple highway construction and safety projects
- PKG-7 Construction of Six lane Access Controlled Nagpur-Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) Km 296.000 to Km 347.190 (Village Banda to Village Sawargaon Mal) in District Buldhana - Project Cost: ₹1,906.99 Cr (01/11/2019 - 10/12/2022)
- Rehabilitation and Upgradation of 2 lane road with paved shoulders of Naigaon Bandi to Mangrulpir NH 161A (Km 40/000 to Km 75/000) - Total Length 35.0 Km - Project Cost: ₹152.19 Cr (20/11/2019 - 15/12/2021)
- Improvement to Road No. NAG-131 from Ghorad at Seloo takuka to Sirasgaon (SH-321) District Wardha (Design Km 61+700 to Km 112+360) on Hybrid Annuity Mode - Project Cost: ₹179.32 Cr (01/01/2020 - 08/04/2021)
- Construction of Two Laning with Paved Shoulder to HAM NAG-127 (SH-344, MDR-27 & MDR-14, SH-347) Total length 63.573 Km - Project Cost: ₹148.20 Cr (01/01/2020 - 28/02/2022)
- NSK-65 Part-A Improvement of Chopda Khedi Bhokar Amoda Kanalda Jalgaon Pachora Wadi Satgaon Bharadi road SH40 (42.80 Km) and Part-B Improvement of Haripura Yawal Takarkheda Nimgaon Bhadli Asoda Jalgaon Road (20.00 Km) - Project Cost: ₹183.00 Cr (16/04/2020 - 20/06/2022)
- Four Laning of existing 2-laning stretch from Mohol at Km 0.000 to Wakhri at Km 44.700 (Pkg-1) on Mohol - Alandi Section (Design length 44.700 km) of NH-965 on EPC mode for National Highways Authority of India - Project Cost: ₹799.70 Cr (12/08/2020 - 31/08/2023)
- Four Laning of existing 2-laning stretch from Khudus at km 77.800 to Dharmapuri at km 117.000 (Pkg-3) on Mohol - Alandi Section (Design length 39.200 km) of NH-965 on EPC Mode - Project Cost: ₹733.17 Cr (12/08/2020 - 31/08/2023)
- NSK-72 Improvement to Bhikangaaon - Pal - Khiroda - Savada - Amoda Road SH-45 (Km 0/000 to Km 40/000) to Two Lane with Paved shoulder on Hybrid Annuity Mode - Project Cost: ₹98.65 Cr (18/08/2020 - 23/12/2021)
- Rehabilitation and up-gradation of Sabalkhed to Ashti section (Km 37/900 to Km 55/100) and Chinchpur to Jamkhed section (Km 70/000 to Km 72/922) of NH-561 to Two lanes with paved shoulder/Four lane configurations (Length 20.122 Km) on EPC mode - Project Cost: ₹183.80 Cr (01/06/2023 - 11/04/2025)
- Appointment of Safety Consultant for Four Laning of Tuljapur- Ausa section of NH-361 (Km 0.000 to Km 55.835 including Tuljapur bypass 11.593 km) on Hybrid Annuity Mode for National Highways Authority of India (NHAI) - Project Cost: ₹911.07 Cr (14/06/2023 - Ongoing)