Pavan Madasi
DET
Talent
ChennaiMember since July 22, 2026
Continuous ImprovementRoot Cause AnalysisIncoming Quality Control (IQC)In-Process Quality (IPQC)Final Inspection (OQC)Gloss measurementSalt spray testPFMEAMSA (Visual inspection)CQI-128D report submissionHistogramCheck sheetFlow chart
·
Hire this person
Send a job offer directly to this candidate
Continuous ImprovementRoot Cause AnalysisIncoming Quality Control (IQC)In-Process Quality (IPQC)Final Inspection (OQC)
About
To prove my self dedicated, wrathful and energy as a member in a progressive organisation, that gives me scope to apply my knowledge and skills and be member of team, that dynamically work toward success and development of the organisation.
Experience
DET - Isuzu motor
- 1 Years Working as DET at Isuzu motor
Engineer in QUALITY DEPARTMENT - ROCKMAN INDUSTRIES LTD
(2019-10)
- Incoming Quality Control (IQC): Inspect incoming alloy wheels (casting quality – porosity, dents, burrs)
- Check paint materials (primer, base-coat, clear coat, thinner)
- Verify COA (Certificate of Analysis)
- Conduct viscosity & shade verification
- Maintain supplier rejection records
- PPM monitoring
- In-Process Quality (IPQC): Check surface cleanliness before painting
- Monitor paint booth parameters (air pressure, temperature, humidity)
- Measure DFT (Dry Film Thickness), Gloss level, Adhesion (cross hatch test), BYK Colour inspection
- Control rejection trend hourly
- Line audit & process audit
- Maintain control charts (SPC)
- Final Inspection (OQC – Outgoing Quality Control): Visual defects inspection (Dust, Flow marks, Pinholes, Orange peel, Shade variation)
- Gloss measurement (Gloss meter)
- Adhesion test
- Impact resistance test
- Salt spray test (corrosion resistance), Cass test, Acid test, Solvent test, Alkalinity test, Humidity and water resistance test
- Packing audit
- Customer Quality / Complaint Handling: Analyze customer complaints
- Perform Root Cause Analysis (5 Why / Fishbone)
- 8D report submission
- Trial validation before implementation
- Maintain warranty PPM
- Customer audit handling (OEM standards like Hyundai, KIA, Mahindra, etc.)
- Documentation & System Responsibilities: Maintain Control Plan
- PFMEA update
- SOP display in work area
- MSA (Visual inspection)
- CQI-12
- Calibration control
- MES data monitoring
- Continuous Improvement (CI): Rejection reduction projects
- Cost of Poor Quality (COPQ) monitoring
- Kaizen activities
- 7 QC tools usage (Pareto, Control chart, Fishbone, Histogram, Check sheet, Scatter, Flow chart)
Education
SSC - Z.P High School Panguru (2015)
Diploma - MECH - Gmr polytechnic college Madanapalle (2018)
Skills
DET
