Skip to main content
Pawan Mahra

Pawan Mahra

Engineer – Structure and Highway

Talent
Dehradun, UttarakhandMember since September 30, 2026
Bar Bending schedule (b.b.s.)Bill of quantities (b.o.q)Auto cadMS ExcelMS wordField survey
·

Hire this person

Send a job offer directly to this candidate

Bar Bending schedule (b.b.s.)Bill of quantities (b.o.q)Auto cadMS ExcelMS word

About

A civil engineer with around 8 years of experience. Five (5) years experience in building construction and three (3) years experience in Highway construction.

Experience

Structure – site engineer - Blue berry infratech Pvt. Ltd. - Maharashtra

(2026-02 - 2026-08)

Project – Residential building (G+04 floor). Client – M.S.R.D.C. Experience in site-in-charge construction works and detailed drawings. Knowledge of construction methods and construction sequence in civil structural construction above and below the ground. Execution of civil structural as per drawings, B.O.Q. technical specifications. Coordination with clients, consultants, vendor and contractors to ensure work is completed in a coordinated manner.

  • Bar Bending schedule (b.b.s.)
  • Bill of quantities (b.o.q)
  • Auto cad
  • MS Excel
  • MS word
  • Field survey
  • Prepare daily work schedule with the required resource deployment and review and monitoring daily

Structure – Site Engineer - Jampana Construction Pvt Ltd.

(2021-03 - 2024-12)

Project – Highrise Building (G+10 Floor). Client – Nagarjuna Construction company Limited. Hands on experience in the constitution and monitoring of (G+10) Structure.

  • Executing and analysis tests and reports and drawing and bar-bending schedule to execute structure works
  • Reviewing drawing and as per site and preparation of hand made drawings for better understanding of skilled labours

Structure – site Engineer - Dinesh Chandra and R. Agarwal infracon pvt Ltd. - Faridabad, Haryana

(2018-01 - 2020-04)

Project – Six lanning at Faridabad by pass road in the state of Haryana under Bharatmala pariyojna. Client – N.H.A.I. Experience in the constitution and monitoring of 1740mtr length of 4-Lanes elevated structure having span arrangement of 52×33.46mtr and 28.500mtr width on single pier with transverse prestressing design on deep foundation.

  • Preparation of layout, plans for fabrication of shuttering (form work) for diaphragm, pier, pier cap and superstructure for bridge

Education

Diploma - Civil Engineering

Skills

EngineerStructure and Highway

Reviews

Related