Captive Power Plant Maintanance&Operations (25MW / 30MW / 35MW Units)Plant Reliability & Asset ManagementBudget Planning & Cost OptimizationShutdown & Turnaround PlanningRoot Cause Analysis (RCA)Energy Efficiency & KPI Monitoring33kV / 11kV / 6.6kV / 415V Switchgears ManagementSAP Maintenance & Inventory Control
·

About

Strategic and performance-driven Electrical & Instrumentation Leader with 15+ years of experience in Captive Power Plant (CPP) operations and maintenance management at Tata Steel Long Products Ltd. Experienced in leading 25MW/30MW AFBC and 35MW WHRB units with strong focus on reliability, cost control, energy efficiency, and safety compliance. Proven record of reducing downtime, optimizing maintenance budgets, and leading cross-functional teams in 24/7 industrial environments.

Seeking Senior

Manager / Plant Head role to drive operational excellence and sustainable power generation performance.

Experience

Manager – CPP, E&I Maintenance - Tirumala Constructions (CPP O&M vendor Partner) - Gamaharia, Jamshedpur, Jharkhand

(2026-02)

  • Led continuous maintenance of 25MW/30MW AFBC & 35MW WHRB /30MW WHRB DRI-based Captive Power Plants ensuring >98% plant availability.
  • Ensuring >98% plant Manpower availability, Skill assessment management.
  • Managed preventive & predictive maintenance programs reducing unplanned breakdowns within TSL EHS protocols.

Manager – CPP, E&I Maintenance - TATA Steel Gamaharia - Jamshedpur

(2009-11 - 2025-02)

  • Led continuous operation of 25MW/30MW AFBC & 35MW WHRB Captive Power Plants ensuring >98% plant availability.
  • Managed preventive & predictive maintenance programs reducing unplanned breakdowns by 30%.
  • Supervised 33kV/11kV/6.6kV substations, MCC, transformers, ACB/VCB ensuring zero major electrical accidents.
  • Directed grid synchronization & tariff metering operations ensuring 100% regulatory compliance.
  • Handled annual shutdown planning reducing maintenance cost by approx. 12% through optimized resource planning.
  • Managed SAP-based inventory control reducing critical spare shortages by 25%.
  • Led team of 40+ engineers & technicians in 24/7 shift operations.
  • Improved energy efficiency initiatives contributing to 5–8% auxiliary power consumption reduction.

Service Engineer - Acme Automation Pvt. Ltd. - Bhilai

(2009 - 2009)

Testing of A.C drives, Controllers & Panel assembling, installation for Weigh bridges, Belt weigher, weigh feeder, hoper weigher in various, Power, Steel & Cement plants

Assistant Technical - Instrumentation Ltd.Bhilai, Govt. of India - Bhilai

(2008 - 2009)

Supervised for Panel wiring, MCC,CO,CO2,H2,O2 analyzer, stack monitoring Opacity system, CV analyzer, CO monitoring system as well as process instrumentation equipment installations including its conduit pipeline &Cable laying work up to PLC panel and loop testing through PLC etc. in Bhilai steel plant (Exauster-3)and Vizag steel plant(COKE OVEN-4&CDCP-4).

Assistant Instrument Technician - Pace Process Control Pvt. Ltd.

(2007 - 2007)

Calibration, testing, erection & commissioning in process instrumentation installation jobs at IOCL Panipat. Haryana. India

Education

Diploma - Electrical Engineering - Govt. Polytechnic, Ranchi (2007)

Intermediate Science - Jharkhand Academic Council, Ranchi (2001)

Matriculation - BSEB, Patna (1999)

Skills

ManagerCPPE&I Maintenance

Reviews