Civil Supervisor cum Surveyor - M/s QSD Company - Thumrait Landfill Project, Oman
(2025-07)
Working as a Civil Supervisor cum Surveyor
Sr. Surveyor - M/s Vijayalakshmi Constructions - Jindal Steel Plant (JSW), Bellary-Karnataka
(2022-06 - 2025-05)
Worked at LCP-4, LCP-5, Battery, Coke-5, CDQ-1 and CDQ-2 area.
- Done Column foundation position and level checking
- Rail alignment, column verticality and Bottom & Top level checking
- Checking verticality of chimney
- Conveyor center line marking
- Route marking of Drainage, Roads, E-Poles and cable line marking and level checking
- Survey related co-ordination with client
Sr. Land Surveyor and Supervising of Pipeline Work - M/s Galfar Engineering & Contracting (SAOG) - 16'' MOL OQ PIPE LINE, BISAT TO YIBAL
(2020-12 - 2021-05)
- Done route marking and level checking for pipe line, foundation and fencing co-ordinate marking
- Used Total station, GPS and Auto Level
Sr. Surveyor and Civil Supervisor - M/s Galfar Engineering & Contracting (SAOG) - Fahud Rehabilitation Airport Project, Oman
(2020-10 - 2020-12)
- Marking center line of Runway
- Marking of A.G.L Light Foundations, Papi Light Foundations
- Apron Area Marking
- Level Checking for Taxi Way
- Setting out Survey and Level Checking for Storm Water Drainage
- Done route marking and level checking for pipe line, foundation and fencing co-ordinate marking
- Used Total station, GPS and Auto Level
Surveyor cum Civil Supervisor - M/s Galfar Engineering & Contracting (SAOG) - Al Hamra Water Distribution Network Project, Oman
(2020-05 - 2020-10)
- Fixing control points by GPS
- Done Setting-out survey and level checking about 30 kms of DI-400mm, DI-200mm, and HDPE dia 110mm, dia-250mm and dia-180mm pipe
- Preparation of daily basis survey report and submit to consultant
- Collecting of survey data for drawing preparation
Surveyor and Civil Supervisor - M/s Galfar Engineering & Contracting (SAOG) - Darsait STP Project, Oman
(2011-01 - 2020-05)
I was the only Surveyor to handle the survey work and survey related coordination with the consultant and client for Darsait Sewage Treatment Plant (STP Project) and worked from beginning to end of the construction.
- Fixing Control points in project area as per WGS-84 System
- Grid contour survey throughout the project
- Computation of earth cutting and filling
- Setting-out and Level checking survey of structures: Operation Building, Biological Treatment Plant, Headworks Building, Chemical Building, Blower Building, TE Tank, TE Pump Station etc. Roads, Overflow Pond, External services cables route marking, street light pole, interlock walkways, retaining wall, culvert, Rip Rap, Ditch and swale etc.
- Setting out survey and excavation level, bedding level, invert level checking of Pipe line (GRP-1000 dia, GRP-1200 dia, HDPE 300 dia upvc-200 dia, 100 dia etc.)
- Setting out survey of Thrust block position, Valve position, Fire Hydrant position etc.
- 11kv. line route marking (5 km long) from Matrah sub-station to Darsait STP Project
- L.S and C.S level checking for roads and shop drawing preparation with draftsman
- Setting out survey of roads and level marking for Sub-base, ABC and final asphalt level (FRL)
- Drawing related co-ordination with consultant and client
- Time to time survey instruments calibration checking
- Maintain Survey records for future requirements
Sr. Surveyor and Civil Supervisor - M/s Galfar Engineering & Contracting (SAOG) - Omantel Project, Muscat, Oman
(2010-01 - 2011-01)
It was a building project as well as internal roads, pipe lines etc.
Sr. Land Surveyor and Civil Supervisor - M/s Galfar Engineering & Contracting (SAOG) - Al Ansab STP Project, Oman
(2005-01 - 2010-05)
Responsibilities were same as Darsait STP Project.
Senior Land Surveyor - M/s Galfar Engineering & Contracting LLC - Salalah Waste Water Collection & Conveyance System, Salalah, Oman
(2000-06 - 2005-12)
- Control points fixing around 50 km
- Setting out survey for Trunk pipe line (dia 1200mm and dia 1000mm hdpe pipe) 12km
- Setting-out survey for lateral pipe line dia-200, dia-300 more than 100 km. by UTM co-ordinate system and by set-back distance
- L.S and C.S level checking for pipe line
- Curve setting out survey
- Pipe invert level and Manhole level checking
- Set-out survey of MPS (Main Pumping Station) & APS (Additional Pumping Station)
- House connection survey and related all log-sheet preparing
- Survey related co-ordination between contractor and client
- Collect survey data for as-built drawing
- Documents maintain for future use
Land Surveyor - M/s Gammon India Ltd. - J.J Hospital - Palton Road Flyover Project, Bombay, India
(1999-04 - 2000-06)
- Setting out survey for flyover
- Horizontal and Vertical curve setting out
- LS & CS level checking
- Details survey work for existing services and prepared the drawings with draftsman
- Calculation, Ground Profile Drawing preparation, Pipe Line route marking, Fixing of Control Points
Surveyor - M/s National Contracting Co. Ltd - Hadeed Steel Plant, Jubail, Kingdom of Saudi Arabia (K.S.A)
(1998-05 - 1999-01)
Done Equipment Alignment & Steel structural Survey
Surveyor - M/s M.N. Dastur & Co. Ltd. (Consultant) - Ispat Industry, dolvi site, Bombay, Maharastra
(1996-02 - 1998-05)
Done civil foundation layout survey, Level checking, internal roads survey, External services, equipment alignment and steel structural survey at Ispat Industries Ltd., Raigad, Maharastra.
Surveyor - Calcutta Metropolitan Development Authority (CMDA) - Batanager, Calcutta
(1995-08 - 1996-02)
Done Plane table Survey