Skip to main content
Rahul Tekade

Rahul Tekade

Sr. SURVEYOR

Talent
WarudMember since August 25, 2026
Operating Total StationNikon DTM 352,552,852Nikon Touch Screen Nikon Nivo 1.cLieca TC 501,502,503Trimble M3 DR1.cAuto level and Digital Auto levelOGL recordingDetail surveyTopographical surveyCenter line markingTBM TraversingLay out of culvert pipe culvert minor bridge major bridgeChecking of pedestal top level pile foundation open foundation, slab top levelBC DLC PQC layersRoad markingConstruction supervision
·

Hire this person

Send a job offer directly to this candidate

Operating Total StationNikon DTM 352,552,852Nikon Touch Screen Nikon Nivo 1.cLieca TC 501,502,503Trimble M3 DR1.c

About

Survey professional with more than 12 years of substantial professional experience in national highway projects. To grow with the esteemed concern by continuous up gradation of new technology and increasing performance. I want to be part of a team where I will be able to learn contribute and enjoy my work and at the same time give value to my organization.

Experience

Surveyor - khalatkar construction infra PVT. LTD (KCC) - Nagpur

(2026-05)

Construction of cement concrete road from mansar mahuli salai Bitoli SH-337 KM 0+000 TO 18+000 (MDR147) NAGPUR On EPC Mode.

Surveyor - Oriental Structural Engineers Pvt. Ltd. - Nagpur

(2009-11 - 2012-03)

Four leaning project of Nagpur Betul Section NHDP Base on DFBOT Basic Project length 176 KM NH-69 In (MP). Client: NHAI. Overall responsible for survey work include TBM Fixing Control pillar fixing center line marking layout of Box culvert pipe culvert crusher plant foundation layout Topography Survey major bridge minor bridge layout pile foundation open foundation document preparation Related to survey work and its approval from consultant.

  • All level calculations for the entire bridge site using Total station, & Auto level.
  • Fixing of TBM pillars & Control pillars an every 100m intervals.

Surveyor - D.P.JAIN&COMPANY INFRASTRUCTURE PVT.LTD NAGPUR - Nagpur

(2012-03 - 2015-02)

Pipliya Manasa Road Project (M.P) - Client: MPRDC and Aproach Road at Auto Testing Track Project - Client: NATRAX. Consultant: Rites. Overall responsible for survey work include TBM Fixing Control pillar fixing center line marking layout of Box culvert pipe culvert crusher plant foundation layout Topography Survey major bridge minor bridge.

  • All level calculations for the entire bridge site using Total station, & Auto level.
  • Fixing of TBM pillars & Control pillars an every 100m intervals.

Surveyor - Sorathiya Velji Ratna & Co. (VRS)

(2015-02 - 2018-04)

Widening and Reconstruction of Hatnapur – Anwalighat, Tawa Bridge – Itarsi Mandi, & Itarsi – Dularia Road Under MPRDC Package – R. Client: MPRDC. Consultant: Indian Technocrat Limited (I.T.L.)

Surveyor - Sorathiya Velji Ratna & Co. (VRS)

(2018-05 - 2020-01)

Itarsi to Maroda Road Project. Client: MPRDC. Consultant: Indian Technocrat Limited (I.T.L.)

Surveyor - Sorathiya Velji Ratna & Co. (VRS)

(2020-01 - 2021-04)

SH-22 to Mudiyakhedi Road Project. Client: MPRDC.

Surveyor - Jain Stone Crusher

(2021-04 - 2022-07)

SH-22 TO Madhai Road Project (M.P.). Client: PWD.

Surveyor - Jain Stone Crusher

(2022-07 - 2023-08)

Hadiya to Nyapura Road Project (M.P.). Client: PWD.

Surveyor - Jain Stone Crusher

(2023-08 - 2024-10)

Pagdhal to Nawalgaon Road Project (M.P.). Client: PWD.

Surveyor - Jain Stone Crusher

(2024-10 - 2025-12)

Kachbaidi to Pachatalai Road Project (M.P.) and Sontalai to Babar Road Project (M.P.). Client: PWD.

Education

Diploma - Surveying (2007 - 2007)

10+2 (2009 - 2009)

Skills

Sr. SURVEYOR

Reviews

Related