Ramsudhan Kumar
Electrical engineer
SundargarhMember since October 10, 2026
SCADA operating for processing linesMotor testingControl Panel trouble shootingPower panel trouble shootingErectionCommissioningCablingCable LayingDocumentationInstrument mountingloop checkspunch-listing operationscontinuityinsulation resistanceStudy/review/analyze technical DrawingsTesting insulation of HV/LV CablesInstallation of HV/LV systemsExecution of Earthing SystemsElectrical Drawing readingCable tray support and cable tray erection workLT & HT panel erection workCable tray Earthing and panel Earthing workLT & HT cable laying , cable glanding and cable termination workGenerator transformer erection workElectrical light installation work
·
Hire their services
Request a quote with no obligation
Electrical installation, wiring, transformer installation, cabling, earthing ins
About
My name is Ramsudhan kumar from bihar and my qualification diploma in electrical engineering.my core areas of interest,such as electrical panel wiring, troubleshooting or site project handling.I am hard working and learn quickly.
Experience
Technician at M/s. Enviro Control Pvt. Ltd. (2021-06 – 2023-06)
Project: Mangalore Refinery and Petrochemicals Ltd.
- SCADA operating for processing lines.
- Trouble shooting in processing line.
- Motor Maintainer, operator.
- Motor testing.
- Motor running observation and reporting.
- Control Panel trouble shooting.
- Power panel trouble shooting.
Electrical Engineer at DOKOMO INFRO CONSTRUCTION LTD (2023-07 – 2023-12)
Project: IOCL DUMAD
- Erection, Commissioning, Cabling, Cable Laying, Documentation, Instrument mounting, Electrical and Maintenance
- Performs all relevant loop checks.
- Performs punch-listing operations.
- Checks power transformers, switchboard, accumulator battery, sockets outlet, lighting system.
- Performs tests of continuity, insulation resistance.
Electrical Engineer at DOKOMO ENGINEERING SERVICES (2023-12 – 2024-07)
Project: ONSHORE TERMINAL FOR KG DWN 98/2 DEVLP PROJECT
- Study/review/analyze technical Drawings.
- Testing insulation of HV/LV Cables.
- Knowledge in Installation of HV/LV systems.
- Executing the Electrical and Instrumentation works according to approved drawing.
- Execution of Earthing Systems
Electrical Engineer at EPS PROJECT LTD (2024-08 – Present)
Project: Kamanda Stael Plant
- CPP2 65*2MV
- Electrical Drawing reading
- Cable tray support and cable tray erection work
- LT & HT panel erection work
- Cable tray Earthing and panel Earthing work
- LT & HT cable laying, cable glanding and cable termination work
- Auxiliary and convert duty transformer erection and all associrease part fixing work
- Generator transformer erection work
- Electrical light installation work
Education
Diploma in Electrical engineer (2018 – 2022)
B tech in electrical engineering (2026)
Skills
Electrical engineer