Site Manager – O&M – WFGD 3x500 MW, IGSTPP, APCPL, NTPC, JHAJJAR - GE VERNOVA - Jhajjar, Haryana, India
(2024-04)
- Proven ability to lead multidisciplinary teams in a matrix organization, managing more than 140 direct and indirect personnel while maintaining regular, needs-based engagement.
- Experience in negotiating the commercial contracts, ensuring contract compliance, and settling monthly RA bills on time with mutual agreement to prevent end-of-contract disputes. Generating RA bill after final amount agreement with sub-contractor monthly-basis.
- Lead day-to-day operations and maintenance activities for thermal power plant systems, ensuring safe, reliable and contract-compliant plant performance with SQDC mindset.
- Plan, coordinate and monitor preventive, corrective and shutdown maintenance activities to achieve availability, reliability and outage execution targets.
- Review plant performance parameters, maintenance trends and operational data to identify issues, initiate corrective actions and improve equipment uptime.
- Coordinate with customer representatives, internal engineering, sourcing, field services and contractor teams to resolve technical, commercial and operational matters.
- Drive EHS compliance through Day-to-Day safety reviews, toolbox discussions, BBS tickets, permit-to-work discipline, risk assessment and incident prevention practices. Conducting Weekly SM walkdowns. Actively Participating and supporting Leadership walkdowns. Implementing and tracking observations with ATS gen-suite.
- Support budget control and cost optimization initiatives by monitoring resource utilization, contractor performance, spares planning and maintenance priorities.
- Maintain process discipline through documentation, reporting, review meetings, action tracking and lessons-learned capture.
- On-time Successful completion of Annual Capital Overhauling of WFGD Jhajjar consecutively each time since O&M started for all three units at Jhajjar Site.
- Preparing and validating the Backbone data for Quarterly Business/Progress Review for Jhajjar O&M.
- Exploring and developing Local Vendors/ suppliers for Spares and consumables to reduce O&M Running Cost and Delay time of supply.
HEAD – C&I COMMISSIONING / SITE O&M EXECUTION LEAD - GE POWER INDIA LIMITED - Jhajjar, Uttar Pradesh, India
(2021-10 - 2024-04)
Projects - 3X500MW, WFGD, IGSTPP, NTPC, JHAJJAR-INDIA (Since Oct'21)
- Led C&I commissioning and site execution for 3X500MW WFGD, IGSTPP, NTPC Jhajjar, coordinating customer, engineering, and other Cross-function teams to achieve system readiness.
- Successfully commissioned ABB Symphony Plus DCS for WFGD, the first ABB automation platform execution in the GE portfolio for this application.
- Commissioned WFGD systems including Thermo Fisher CEMS, CPI limestone ball mill, ELCON limestone ball crusher and Atlas Copco compressor packages for all 3 units of WFGD- Jhajjar.
- Managed critical-path priorities, commissioning risks, interface issues and resources to achieve contractual milestones, availability targets and customer commitments while recovering execution delays in C&I commissioning.
- Maintained commissioning spares within approved budget, supporting cost discipline, supplier coordination and risk mitigation for materials and site execution.
- Prepared and controlled TQ, NCR, ITP, ITPL, protocol and test documentation to ensure compliance, traceability and structured handover.
- Embedded Lean routines, SQDC review cadence, KPI tracking, Gemba walks and Kaizen mindset to improve execution discipline, safety awareness and team performance.
LEAD – C&I COMMISSIONING - GE POWER INDIA LIMITED - Multiple locations, India
(2016-11 - 2021-10)
Major Projects – 3X660MW, NTPC – NPGCL NABINAGAR, BIHAR INDIA (April'2020 TO Oct'2021); 2X660MW, NTPC TANDA, UTTAR PRADESH, INDIA (Dec'18 TO April'2021); 2X660MW, NTPC SOLAPUR, INDIA (Nov'2016 TO Dec'2018)
- Led C&I commissioning scope for 2X660MW NTPC Tanda and 2X660MW NTPC Solapur, ensuring readiness of key turbine-generator and BOP systems for synchronization, full load, COD and COF milestones.
- Owned readiness of Condensate Polishing Plant before turbine synchronization and achieved successful completion as per plant requirement.
- Owned readiness of TDBFP system from C&I commissioning side before full-load operation, supporting plant reliability and operational continuity.
- Coordinated with customer representatives for logic tests, system checks, quality reviews and protocol signoffs, strengthening transparent stakeholder engagement and contractual documentation.
- Conducted Hot commissioning of COLTCS, SCS, vacuum system and other TG-BOP systems while working closely with process teams during shift schedules.
- Analysed commissioning issues, plant feedback and inter-system dependencies to drive corrective actions and improve uptime readiness.
- FGD Process and OWS for Desk Operators at Hassyan- Dubai
- DCS Trainer and Co-ordinator for DCS Contractual Training to Desk Operators and C&I Professionals at NTPC Tanda
- DCS Trainer and Co-ordinator for DCS Contractual Training to APCPL Jhajjar Team, conducted at ABB, Bangalore.
Project Engineer – Engineering and Commissioning - Siemens Ltd. - Gurugram, India
(2005-09 - 2008-01)
On R-Services Role. Key Clients: VSEL Jharsuguda CG, MMIPL Vizag AP, ESSAAR Hazira GJ, Rana Sugar, Amritsar PB, JP Rewa MP, NLC Neyveli TN.
- Sponge Iron Kiln Process and WHRB Boiler Commissioning; Client: VSEL Jharsuguda CG
- Sponge Iron Kiln Process and MHS- Conveyor System Commissioning; Client: MMIPL Vizag AP
- Turbine Automation 50MW; Client: Rana Sugar, Amritsar PB
- Burner Management Process Engineering and Commissioning; Client: 12X50MW, TPS-1, NLC Neyveli TN