Skip to main content
Rohan Godithi

Rohan Godithi

HVAC Design Engineer with 10years work experience

Talent
Pune, PuneMember since June 8, 2022
·

Hire this person

Send a job offer directly to this candidate

About

PERSONAL PROFILE

Date of Birth : 18-01-1988

Sex : Male

Marital Status : Married

Nationality : Indian

Languages Known : English, Telugu and Hindi.

PROFESSIONAL SKILLS

  • Heat load estimation.
  • Develop Ducting Flow Diagrams (PFD's) and Piping Flow Diagrams (P&ID's).
  • Develop Ducting and Equipment Layouts.
  • Develop Piping and Equipment Layouts. 
  • Perform Ducting Pressure Drop Calculations.
  • Perform Piping Pressure Drop Calculations.
  • Prepare and check Bill of Quantity (BOQ) / Material Take Off (MTO) 
  • Prepare Procurement Specifications and RFQ’s
  • Equipment Selection and Vendor Co-ordination.
  • Preparing and Reviewing Equipment Datasheets & GA Drawings.
  • Prepare Technical evaluation report of vendor offers.
  • Familiar with ASHRAE Handbook, Carrier handbook, ASHRAE 90.1, ASHRAE 62.1, SMACNA HVAC systems duct design.
  • Have basic knowledge regarding “Hazardous Area Classification and Control of Ignition Sources”.
SOFTWARE SKILLS
  • Carrier HAP
  • ASHRAE Duct Fitting Database
  • Danfoss Cool selector 2
  • AutoCAD
  • McQuay Ductsizer
  • Bell & Gossett System Syzer
  • Carrier Psychrometrics
EMPLOYMENT HISTORY: SEPTEMBER 2020 to PRESENT

Name of Company : Darwish Cybertech India Private Limited (on behalf of AHI CARRIER).

Location : Pune, India

Period : September 2020 to Present

Designation : Senior HVAC Engineer

PROJECTS

  • Arctic LNG 2 : 1-TMR-005, 2-TMR-005 & 3-TMR-005, Russia
  • Mozambique LNG, Cabo Delgado province of Mozambique.
  • Pearl Petroleum- KM500 Project, Kor Mor (Iraq) 
RESPONSIBILITIES:
  • Heat load estimation using HAP.
  • Prepare PFD and P&ID.
  • Develop Ducting and Equipment Layouts.
  • Develop Piping and Equipment Layouts. 
  • Estimation of Pressure drop in Ducting system using “ASHRAE Duct Fitting Database” software.
  • Prepare Technical evaluation report of vendor offers.
  • Preparing and Reviewing Equipment Datasheets & GA Drawings.
  • Responsible for issuing manufacturing clearance for various HVAC Equipment.
  • Preparing HVAC Design basis report.
  • Prepare Equipment inspection (FAT) procedures and reports.
  • Attending weekly meetings with Customer and Consultant.
EMPLOYMENT HISTORY: MARCH 2020 to SEPTEMBER 2020

Name of Company : VK Building services private limited

Location : Hyderabad, India

Period : March 2020 to September 2020

Designation : Manager - Planning

PROJECTS

  • Aurobindo Galaxy Towers – HVAC, Hyderabad, Telangana, India
  • Campus Development Project of IIT Hyderabad: 3B HVAC Package.
RESPONSIBILITIES:
  • Preparing RFQ and Technical specification for High Side Equipment.
  • Preparing Technical & Commercial Comparison.
  • Negotiation with vendors.
  • Participated in technical meeting with clients and consultants 
  • Vendor Finalization
  • Pressure loss estimation for Ducting and Piping systems.
  • TDS submission and Approval.
  • SAP Migration Works.
EMPLOYMENT HISTORY: NOVEMBER 2014 to JULY 2019

Name of Company : AHI CARRIER FZC

Location : Sharjah, UAE

Period : June 2015 to July 2019

Designation : HVAC Design Engineer

Name of Company : SS Building Services Consultants Pvt. Ltd (on behalf of AHI CARRIER).

Location : Chennai, India

Period : November 2014 to April 2015

Designation : HVAC Design Engineer

PROJECTS

  • Yamal LNG Project: MR 1 Package (52 Modular Buildings), South Tambey, Russia
  • Sakhalin-2 Project: Sub-station, LER, FAR and Maintenance building, Sakhalin Island, Russia
  • TCO - FGP/WPMP Project: Remote Instrument Enclosures - 6 No's, Tengiz, Kazakhstan.
  • Oyu Tolgoi Mining Project: Lunch room, Main Shop and Truck Shop, Mongolia.
  • ENOC Jebel Ali Refinery Expansion Project: Rack room/Substation Buildings, Dubai.
  • Khor Al Zubair Gas Plant: ECCB Building Modifications, Basrah, Iraq
RESPONSIBILITIES:
  • Heat load estimation using HAP / REHAU software.
  • Prepare PFD and P&ID.
  • Coordinating & giving input for PDMS/Autocad Designers.
  • Develop Ducting and Equipment Layouts.
  • Develop Piping and Equipment Layouts. 
  • Estimation of Pressure drop in Ducting system using “ASHRAE Duct Fitting Database” software.
  • Estimation of Pressure drop in Piping system as per “ASHRAE Handbook—Fundamentals Pipe sizing”.
  • Prepare Technical evaluation report of vendor offers.
  • Interdepartmental coordination with E&I team.
  • Getting approval of engineering drawings/documents from Russian Authority and Client as per the planned schedule.
  • Review and submit Technical Data Sheets/General Arrangement drawings of various HVAC Equipment. 
  • Coordinate and participate in meeting with Clients and Vendors.
  • Responsible for getting Trakhees approval for HVAC Design Calculations & Chiller Selections in ENOC Jebel Ali Refinery Expansion Project, Dubai.
  • Responsible for issuing manufacturing clearance for various HVAC Equipment.
  • Frequent site visits to supervise HVAC related construction activities at ENOC Jebel Ali Refinery Expansion Project, Dubai.
  • Attend Equipment inspections and Close Punch points.
  • Prepare Equipment inspection (FAT) procedures and reports.
  • Resolve site issues and answer Client RFI’s.
  • Prepare Refrigerant P&ID (including pipe sizing and pressure drop estimation) using Danfoss Cool selector 2 Software.
EQUIPMENT INSPECTIONS ATTENDED:
  • Air cooled chiller performance test and acoustic test at Carrier testing facility, Montluel, France.
  • Compressor units and Condenser units inspection at Profroid Industry, Aubagne, France.
  • Chilled water pumps inspection at Grundfos warehouse, Dubai.
  • Camfil chemical filter unit inspection at Climauno Factory, Dubai.
  • Electric Duct Heater inspection at Maxell Industries Factory, Dubai.
EMPLOYMENT HISTORY: AUGUST 2011 to OCTOBER 2014

Name of Company : BGR Energy Systems Limited.

Location : Chennai, India

Period : August 2011 to October 2014

Designation : HVAC Design Engineer

PROJECTS

  • 2 x 660 MW Krishnapatnam Thermal power project: All buildings in Power Plant, India.
  • 2X500 MW Chandrapur Super Thermal Power Station: All buildings in Power Plant, India.
  • 2X500 MW Marwa Thermal Power Plant: All buildings in Power Plant, India.
RESPONSIBILITIES:
  • Preparation of Design basis report for Air conditioning and Ventilation systems.
  • Study of client specification in conjunction with building layout for selection of suitable systems & equipment’s. 
  • Preparation of Procurement (Technical) specification for Various HVAC Equipment’s. 
  • Preparation of Heat load calculation & P&ID for Air Conditioning systems.
  • Preparation of Sizing calculations & Flow diagrams for Wet Ventilation systems.
  • Technical evaluation of vendor offers for AC system involving equipment like chillers, AHU, FCU, Pumps, fans etc.
  • Vendor engineering – review and approval of vendor documents for various HVAC equipment’s.
  • Inter department coordination between civil, electrical and C&I departments.
  • Coordinating with Vendor’s regarding engineering issues. 
  • Bill of quantities of HVAC Systems for preparation of procurement specification.
  • Calculations for Make-up water requirement for HVAC Systems.
  • Calculations for Strip Heater and Humidifier sizing.
  • Pressure drop calculation in piping and ducting.
  • Guiding draftsman for the preparation of ducting layouts, piping layouts & AC plant room layouts.
EDUCATION

2009-2011 - M.Tech (CAD/CAM) (8.5 CGPA)

GITAM University, Visakhapatnam, Andhra Pradesh, India

2005-2009 - B.Tech (Mechanical Production & Industrial Engineering) (67 %)

GITAM College (Andhra University), Visakhapatnam, Andhra Pradesh, India

Experience

EMPLOYMENT HISTORY: SEPTEMBER 2020 to PRESENT

Name of Company : Darwish Cybertech India Private Limited (on behalf of AHI CARRIER).

Location : Pune, India

Period : September 2020 to Present

Designation : Senior HVAC Engineer

PROJECTS

  • Arctic LNG 2 : 1-TMR-005, 2-TMR-005 & 3-TMR-005, Russia
  • Mozambique LNG, Cabo Delgado province of Mozambique.
  • Pearl Petroleum- KM500 Project, Kor Mor (Iraq) 
RESPONSIBILITIES:
  • Heat load estimation using HAP.
  • Prepare PFD and P&ID.
  • Develop Ducting and Equipment Layouts.
  • Develop Piping and Equipment Layouts. 
  • Estimation of Pressure drop in Ducting system using “ASHRAE Duct Fitting Database” software.
  • Prepare Technical evaluation report of vendor offers.
  • Preparing and Reviewing Equipment Datasheets & GA Drawings.
  • Responsible for issuing manufacturing clearance for various HVAC Equipment.
  • Preparing HVAC Design basis report.
  • Prepare Equipment inspection (FAT) procedures and reports.
  • Attending weekly meetings with Customer and Consultant.
EMPLOYMENT HISTORY: MARCH 2020 to SEPTEMBER 2020

Name of Company : VK Building services private limited

Location : Hyderabad, India

Period : March 2020 to September 2020

Designation : Manager - Planning

PROJECTS

  • Aurobindo Galaxy Towers – HVAC, Hyderabad, Telangana, India
  • Campus Development Project of IIT Hyderabad: 3B HVAC Package.
RESPONSIBILITIES:
  • Preparing RFQ and Technical specification for High Side Equipment.
  • Preparing Technical & Commercial Comparison.
  • Negotiation with vendors.
  • Participated in technical meeting with clients and consultants 
  • Vendor Finalization
  • Pressure loss estimation for Ducting and Piping systems.
  • TDS submission and Approval.
  • SAP Migration Works.
EMPLOYMENT HISTORY: NOVEMBER 2014 to JULY 2019

Name of Company : AHI CARRIER FZC

Location : Sharjah, UAE

Period : June 2015 to July 2019

Designation : HVAC Design Engineer

Name of Company : SS Building Services Consultants Pvt. Ltd (on behalf of AHI CARRIER).

Location : Chennai, India

Period : November 2014 to April 2015

Designation : HVAC Design Engineer

PROJECTS

  • Yamal LNG Project: MR 1 Package (52 Modular Buildings), South Tambey, Russia
  • Sakhalin-2 Project: Sub-station, LER, FAR and Maintenance building, Sakhalin Island, Russia
  • TCO - FGP/WPMP Project: Remote Instrument Enclosures - 6 No's, Tengiz, Kazakhstan.
  • Oyu Tolgoi Mining Project: Lunch room, Main Shop and Truck Shop, Mongolia.
  • ENOC Jebel Ali Refinery Expansion Project: Rack room/Substation Buildings, Dubai.
  • Khor Al Zubair Gas Plant: ECCB Building Modifications, Basrah, Iraq
RESPONSIBILITIES:
  • Heat load estimation using HAP / REHAU software.
  • Prepare PFD and P&ID.
  • Coordinating & giving input for PDMS/Autocad Designers.
  • Develop Ducting and Equipment Layouts.
  • Develop Piping and Equipment Layouts. 
  • Estimation of Pressure drop in Ducting system using “ASHRAE Duct Fitting Database” software.
  • Estimation of Pressure drop in Piping system as per “ASHRAE Handbook—Fundamentals Pipe sizing”.
  • Prepare Technical evaluation report of vendor offers.
  • Interdepartmental coordination with E&I team.
  • Getting approval of engineering drawings/documents from Russian Authority and Client as per the planned schedule.
  • Review and submit Technical Data Sheets/General Arrangement drawings of various HVAC Equipment. 
  • Coordinate and participate in meeting with Clients and Vendors.
  • Responsible for getting Trakhees approval for HVAC Design Calculations & Chiller Selections in ENOC Jebel Ali Refinery Expansion Project, Dubai.
  • Responsible for issuing manufacturing clearance for various HVAC Equipment.
  • Frequent site visits to supervise HVAC related construction activities at ENOC Jebel Ali Refinery Expansion Project, Dubai.
  • Attend Equipment inspections and Close Punch points.
  • Prepare Equipment inspection (FAT) procedures and reports.
  • Resolve site issues and answer Client RFI’s.
  • Prepare Refrigerant P&ID (including pipe sizing and pressure drop estimation) using Danfoss Cool selector 2 Software.
EQUIPMENT INSPECTIONS ATTENDED:
  • Air cooled chiller performance test and acoustic test at Carrier testing facility, Montluel, France.
  • Compressor units and Condenser units inspection at Profroid Industry, Aubagne, France.
  • Chilled water pumps inspection at Grundfos warehouse, Dubai.
  • Camfil chemical filter unit inspection at Climauno Factory, Dubai.
  • Electric Duct Heater inspection at Maxell Industries Factory, Dubai.
EMPLOYMENT HISTORY: AUGUST 2011 to OCTOBER 2014

Name of Company : BGR Energy Systems Limited.

Location : Chennai, India

Period : August 2011 to October 2014

Designation : HVAC Design Engineer

PROJECTS

  • 2 x 660 MW Krishnapatnam Thermal power project: All buildings in Power Plant, India.
  • 2X500 MW Chandrapur Super Thermal Power Station: All buildings in Power Plant, India.
  • 2X500 MW Marwa Thermal Power Plant: All buildings in Power Plant, India.
RESPONSIBILITIES:
  • Preparation of Design basis report for Air conditioning and Ventilation systems.
  • Study of client specification in conjunction with building layout for selection of suitable systems & equipment’s. 
  • Preparation of Procurement (Technical) specification for Various HVAC Equipment’s. 
  • Preparation of Heat load calculation & P&ID for Air Conditioning systems.
  • Preparation of Sizing calculations & Flow diagrams for Wet Ventilation systems.
  • Technical evaluation of vendor offers for AC system involving equipment like chillers, AHU, FCU, Pumps, fans etc.
  • Vendor engineering – review and approval of vendor documents for various HVAC equipment’s.
  • Inter department coordination between civil, electrical and C&I departments.
  • Coordinating with Vendor’s regarding engineering issues. 
  • Bill of quantities of HVAC Systems for preparation of procurement specification.
  • Calculations for Make-up water requirement for HVAC Systems.
  • Calculations for Strip Heater and Humidifier sizing.
  • Pressure drop calculation in piping and ducting.
  • Guiding draftsman for the preparation of ducting layouts, piping layouts & AC plant room layouts.

Education

EDUCATION

2009-2011 - M.Tech (CAD/CAM) (8.5 CGPA)

GITAM University, Visakhapatnam, Andhra Pradesh, India

2005-2009 - B.Tech (Mechanical Production & Industrial Engineering) (67 %)

GITAM College (Andhra University), Visakhapatnam, Andhra Pradesh, India

Reviews