About

Accomplished senior leader in the cement and heavy manufacturing sector with over 35 years of experience overseeing large integrated plants, grinding units, and capital-intensive projects across India and the Middle East. Currently serving as Unit Head & Joint Executive President at UltraTech cement. Proven track record in leading large integrated cement operations, commissioning major capital projects, driving operational excellence & building high performance leadership team.

Extensive experience in multi plant operations, cost leadership, asset reliability, post-acquisition integration and large capital program execution across India & in Middle East.

Experience

Unit Head and Executive Joint President at UltraTech Cement (2021-07 – Present)

  • Held overall responsibility for the UltraTech Hirmi Integrated Plant and the Patliputra (Bihar) Grinding Unit, with accountability for operational performance, capital projects, safety systems, statutory compliance, and the effectiveness of leadership teams across both sites.
  • Provided senior oversight of Hirmi Cement Works, an integrated operation with two production lines using FLS and KHD technologies, covering clinker capacity of 5.70 MTPA and cement capacity of 3.20 MTPA, with a clear focus on asset reliability, cost discipline, and long-term performance.
  • Maintained oversight of the Patliputra Cement Works grinding unit with cement capacity of 4.72 MTPA ensuring stable operations, regulatory compliance, and alignment with enterprise performance priorities.
  • Carried senior accountability for the commissioning of Line 2 within a fourteen-month timeframe, ensuring execution readiness, risk management, cross functional coordination, and a smooth transition from project completion to steady state operations in April 2022.
  • Oversaw both project and operational activities through structured planning and performance reviews, supporting delivery discipline and consistent execution across functions.
  • Accountable for financial performance, cost optimization initiatives, supply chain alignment, customer interface, and continuous improvement programs, supported by regular governance and review mechanisms.
  • Mentored senior leaders and functional heads, strengthening leadership capability, decision making quality, and a culture of accountability across complex manufacturing environments.

Technical Head at UltraTech Cement (2019-02 – 2021-07)

  • Managed technical functions at UltraTech Nathdwara Cement Ltd. (Acquired from M/s Binani Cement) addressing challenges related to cultural integration, plant reliability, cost optimization, and quality assurance.
  • Improved plant reliability and enhanced the overall culture and employee morale.
  • Elevated product quality to meet UltraTech standards and optimized product costs through strategic initiatives.
  • Implemented an effective and structured roadmap in a relatively short timeframe and successfully addressed cost optimization through numerous strategic initiatives, meticulous monitoring, improved coordination, and fostering an environment of effective control and participation.

Grinding Unit Head at UltraTech Cement (2017-10 – 2019-02)

  • Led operational strategy at UltraTech Cement's 1.6LMT plant, ensuring seamless production and adherence to quality standards.
  • Implemented cost-effective measures, optimized processes, and fostered a high-performance team culture.
  • Achieved increased production efficiency, cost savings, elevated product quality, and enhanced team morale.

Hod Mech (Pre Clinkerisation) at UltraTech Cement (2010-07 – 2017-10)

  • After Commissioning joined & addressed all the major issues & streamlined the 10000 TPD KHD plant with utmost reliability & efficiency. Played a key role in achieving prestigious WCM excellence award for the unit.

Senior Project Development Manager at Ambuja Cements Limited (2008-09 – 2010-07)

  • Managed all capital expenditure projects at a 7800 TPD unit, ensuring optimal cash flow utilization and future Capex planning.
  • Oversaw project planning, execution, equipment evaluation, procurement, and the erection and commissioning of mechanical equipment.
  • Enforced rigorous safety procedures and ensured adherence to time, cost, and quality parameters.

Head of Section at Saudi Cement Company (2005-12 – 2008-09)

  • Oversaw operations of multiple ball mills for limestone grinding and finish grinding processes.
  • Managed the packing plant operations, including bulk and bag loading stations.
  • Contributed to a significant capacity expansion project, showcasing proficiency in managing diverse milling operations.

Deputy Manager at Vikram Cement (1991-03 – 2005-12)

  • Led crusher operations, raw mills management, cement mills supervision, kiln operations, and utility operations.
  • Ensured optimal efficiency and performance in critical production processes