Manager MEP - GHV INDIA PVT LTD - Madhav Bhavan Parel site
(2024-06-01)
Project comprises of 5 Towers of 25th story Rehab building, Ground +2 flr BMC school, 30 Story Hotel and sale tower of 50 story.
Manager MEP - CBRE SOUTH Asia Pvt ltd
(2024-02-28 - 2024-05-24)
Project Handled Asian paint Bhandup, 2 ware houses and 1 Admin Buildings.
Manager MEP - Relcon infraprojects Ltd
(2023-12-01 - 2024-02-23)
Project executed Patra chawl Goregaon and Tata Hospital Buildings.
Executive Assistant – MEP - HUBTOWN LTD
(2023-01-16 - 2023-11-25)
B1, B2, Ground, Podium 1 to 3, Club house and 5th to 25th story Building 1A, 1B and 1C (Three tower), Tower-2, Tower 3 and Udyog bhavan commercial Bldg. Electrical, plumbing, firefighting, FAPA and HVAC works.
Manager – MEP - ALFA DEAL
(2020-08-01 - 2023-01-14)
- Bajaj Emerald Andheri - Firefighting project -14th story 3 towers completed.
- Shapoorji Pallonji - The designate Khar – Firefighting project –Completed.
- Vibgyor school - Kalyan - HVAC project completed.
- SPRE MULUND - Experience center Mulund.
Manager - MEP - DB Realty
(2010-10-01 - 2020-06-14)
Installation, Testing, Commissioning & Handing over of Electrical, Plumbing, HVAC, Firefighting, FA / PA, CCTV, BoomBarrier, Access Control & Intercom Systems. Commissioning of 1500 Kva / 11KV Compact Sub Station with distribution.
- Orchid Enclave, Mumbai Central - Residential tower of height 210 meters, 55 floors with 332 Flats in Two wings.
- One Mahalaxmi - Rehab 1 & Sales gallery.
- One Mahalaxmi - Residential tower -1 of 72 floors, & Tower -2 of 52 floors. Project is under construction.
- Rehab 1 - Residential Tower of 22 Floors with 234 Flats & 17 Shops. (Project is Handed over)
- Sales gallery - Ground floor 20000 Sq Feet, 1st Floor -20000 Sq Feet (Project was Handed over)
- Taken Active part in Design & Coordination in Electrical, Plumbing, Firefighting STP OWC plant, DG set, Podium amenities like SPA's, GYM, Swimming pool.
- Certification of Measurements of all MEP Contractor.
- Overall Responsibility of power distribution and MEP System operation.
- Coordination with Contractors, Suppliers and other Departments.
- Checking of Material irrespective Specifications as per BOQ & BOM.
- Quantity variation as per site condition & Amendment for the same.
- Taken Active part in Testing & commissioning of Equipment and systems (Like Hydro pneumatic Water transfer System, STP plant, Ventilation Fan system, De watering system, irrigation water transfer system).
- Execution, Supervision & Testing of Elevators of 4m/s Speed and load of 2100 kg capacity at Enclave (Contractor- Mitsubishi Elevators Co.) 8 Nos.
- Execution and commissioning of 185 KLD STP, 140 KLD GWTP & RO Plant.
- Maintain Track Record of AMCs, Renewals.
Sr. Engineer - WADHWA Developers
(2010-02-01 - 2010-09-30)
Club Aquaria – Shanti Nagar, Borivali. Residential tower of 39 floors in Two TOWERS.
- Installation of cable tray, earthing pits, earthing Strips, cables.
- Taken Active part in Design & Coordination in Electrical, Plumbing, Firefighting STP, OWC plant, DG set, Podium amenities like SPA's, GYM, Swimming pool.
- Supervision of slab /wall conduiting & Box fixing for two towers.
- Supervision of Plumbing work of Internal & external water supply for two towers.
- Coordination for Approvals & Liaoning with related government bodies.
- Supervision of Firefighting System for two towers.
- Checking Electrical bills of executed work as per work order and making reconciliation of material.
Sr. Engineer - Roshan electrical pvt. Ltd
(2006-02-01 - 2010-02-28)
- Raghu Leela Mall, Vashi
- Vishwaroop Infotech Park, Vashi
- BASF, Turbhe, Navi Mumbai.
- Raheja Mind space, Airoli.
- Installation, Testing & Commissioning of 11 KV & 33 KV HT Panels.
- Installation, Testing & Commissioning of Dry Type Transformer -1500 KVA -33KV- 5 Nos, 2000 KVA / 11 KV – 2 Nos, 1000 KVA- 11 KV – 2 Nos, 630 KVA /11 KV -2 Nos.
- Installation Testing & Commissioning of LT Panels.
- Cable Laying as per Schedule.
- Point wiring for Lighting & Power.
- Certification of Measurements.
- Taken care of Overall power distribution and operation.
- Monitoring on smooth working of Handed over system.
- Coordination with Contractor Supplier and other Departments.
- Challenging Work - Completed Raghu Leela Mall Vashi & Vishwaroop Infotech Park around 7.5 MVA/ 11 KV and 7.5 MVA/ 33 KV substations and all its distribution with 100% DG Backup with Synchronizing Panels as a project head without any complaint.
Site engineer - Rohini industrial electrical
(2003-09-01 - 2006-01-31)
- Power Grid Corp of India Ltd. SEEPZ, Mumbai. (Commercial Project)
- LG India PVT Ltd. Ranjan Gaon MIDC, Pune. (Industrial Project)
- Installation of various Panels according to drawing, cable tray, earthing, Point wiring, Termination, testing and commissioning.
- Classification of materials.
- Selection of suitable vendors.
- Expedite & follow-up with the vendors.
- Survey of working site and make a proper estimation. Planning the work.
- Attaining the maximum efficiency of the workers.
- Certification of Measurements.
- Coordination with Contractor, Supplier and other Departments.
- Race way installation, Db dressing, Data/telephone cabling, workstation installation, commissioning and UPS back up.
Site engineer - Pravin electrical Pvt. Ltd
(1998-08-01 - 2003-09-30)
- Arthur Anderson Site, Maker's tower, Cuffe parade.
- Taj President, Colaba.
- Lupin Lab, Airoli, Goregaon for Landmark builders.
- Haffkine Bio-pharmaceutical Ltd, Parel, Mumbai.
- Lokhandwala, Pali Hill, Bandra.
- BTS Tower, All over Mumbai.
- Bhakti Park Wadala for Ajmera Builders.
- Electrical conduiting in slab as per drawing, vertical conduiting as per location of electrical points wiring.
- Coordinate Project Work & work Planning as per Client requirement.
- Accessories fixing, cable work, meter room work & break up measurement of electrical quantities at site.
- Procedures, formalities & policy of purchasing.
- Survey of working site and make a proper estimation. Planning the work.