Project In Charge (General Manager) at Kalinga Commercial Corporation Ltd (2025-08 – Present)
Leading the mining operation of Jagannath Ananta Coal Mines, KCCL Project commenced from April 2025) to achieve agreed targets with the client Ananta OCP, Jagannath Area, MCL Talcher) confirming safety and productivity norms.
- Facility services developed to commence and continued operation of the mines.
- Development and implementation of systems for fleet administration including shift operation.
- Initiated and developed coal stock of capacity 6 million Tones to maintain production flow.
- As on February 2026 coal production 10.5 million tones and OB removal 20.4 million cubic meters.
- Development of workshop facility and on-site accommodation completed within the timeline.
- As on February 2026 per day production achieved, Coal 60000 tons & OB 110000 cubic meters against the target of 70000 tons coal and OB 130000 m3 per day.
- Mines operation and development activity remained hinderance free by tactical coordination with client & local community.
GM Mines at DBL Siarmal Coal Mines Limited (2024-09 – 2025-07)
To achieve the annual targets on material handling (Coal & OB) complying the conditions cited in the approved mining plan and permissions granted to DBL Siarmal Coal Mines Ltd.
- Spearheaded end-to-end operations of a high-capacity 50 MTPA coal mine under MCL Mahalaxmi Area, ensuring optimal resource utilization and adherence to statutory requirements.
- Preparation and implementation of monthly excavation and operation plan. Day to day monitoring of equipment productivity and mine performance.
- Oversaw compliance with all mining, environmental, and safety regulations as the appointed Mine Developer and Operator MDO) for the MCL Mahalaxmi Area, Sundergarh.
- Successfully drove coal production to 18 million tons in FY 2024 25, surpassing the annual target of 14 million tons through strategic planning and efficient execution.
- Maintained exemplary safety performance, leading the mine to operate incident-free while earning five prestigious awards during the Annual Safety Fortnight 2024.
DGM Mines at JSW Steel Ltd (2021-06 – 2024-08)
To perform the statutory role of Mines Manager, Jajang Iron Ore Mines. To achieve the iron ore production 12MTPA. To Lead Group Vocational Training Centre, Jajang Iron Ore Mines. To commence mining deploying own fleet replacing MDO. To coordinate with project activities for construction of iron ore processing plant CPU, Nuagaon). To coordinate for preparation and implementation of SMP Safety Management Plan) for Jajang and Nuagaon Mines.
- Established and led a state-of-the-art mining operation deploying own fleet replacing MDO.
- Coordinated in selection, training and engagement of 238p HEMM operators at Jajang and Nuagaon mines. ensuring enhanced workforce skills, technical knowledge, and operational competence.
- Optimized and developed standard haul roads separate for tipper/100te dumper, Ore/OB, HMV/LMV at Jajang iron ore mines.
- Integrated three advanced training simulators at Jajang Group VTC, providing immersive hands-on learning experiences to boost operational readiness.
- Collaborated with cross-functional teams to identify hazards and draft safety management plan for Jajang and Nuagaon mines.
- Led GVTC Jajang to secure 1st place overall in the Annual Mines Safety Week competitions for both 2021 and 2022.
- CPU Commissioned during the month of April 2024 and started processing 1560 TPH against the rated 2000TPH.
- Jajang Mines achieved the approved production target for the year 21/22, 22/23 successfully.
- Drafted SMP approved by DGMS during the year 2024.
GM, Mines at NCC Ltd (2020-09 – 2021-05)
Overall responsible for operator and equipment mobilization and commencement of mine operation in MDO mode to achieve the annual production 4MTPA coal.
- Led a large-scale 19.5-million-ton coal extraction project under a 60-month agreement with WCL Nagpur, overseeing all operational and strategic aspects from inception.
- Directed the complete setup of mining infrastructure, including equipment mobilization, site preparation, and workforce deployment, ensuring readiness for production.
- Successfully commenced coal production in December 2020, meeting project timelines and delivering initial outputs efficiently.
- Fostered seamless coordination among cross-functional teams to maintain smooth mining operations and achieve daily production goals.
- Delivered an impressive 1.12 million tons of coal production by March 2021, exceedingly early-phase targets and setting a strong foundation for the project's success.
GM, Mines at Essel Mining, ABG (2019-05 – 2020-03)
To achieve the approved quantity iron ore production within the available time of 07 months prior to expiry of mine lease on March 2020 with statutory role of mines Manager, Kasia Iron Ore Mines.
- Served as Head of Mines and statutory Mines Manager for Kasia Iron and Dolomite Mines, overseeing all facets of mine operations with strict adherence to safety standards and statutory compliance.
- Led and guided operational teams to optimize mining activities, ensuring high productivity while maintaining environmental and regulatory obligations.
- Coordinated production planning and execution, effectively managing resources to maximize output within tight deadlines.
- Achieved a remarkable 3.22 million tons of iron ore production in just 5.5 months, successfully completing production targets before the lease expiration on 31st March 2020.
DGM, Quarry at Larsen & Toubro (2017-06 – 2019-04)
Led the opening and operations of rough stone quarries to supply construction materials for hydro tunnel structures at the Kudankullam Nuclear Power Plant Phases 3 & 4.
- Played a pivotal role in land identification, lease application processes, and liaising with district and state authorities to secure quarry leases.
- Provided strategic leadership in establishing, mobilizing, and operating newly acquired quarry sites, ensuring timely material supply to meet project demands.
- Oversaw production quality standards, ensuring strict compliance with material specifications for critical infrastructure works.
- Successfully secured four quarry leases out of six applications within just five months, accelerating project timelines.
- Operationalized two quarries, commencing material supply to the project site by January 2018.
AGM, Safety at Dalmia Cement Bharat Ltd, OCL (2014-04 – 2017-05)
Led employee training programs at the plant and captive limestone mines, focusing on enhancing productivity, safety awareness, and regulatory compliance.
- Fulfilled statutory responsibilities as Safety Officer and Vocational Training Officer VTO) for limestone mining operations, ensuring adherence to safety and training mandates.
- Monitored both leading and lagging safety indicators to proactively identify risks and foster a culture of safety across plant, mines, and residential colonies.
- Spearheaded the implementation of Behavior-Based Safety BBS) programs at Lanjiberna Limestone Mines in 2016, resulting in measurable improvements in safe work practices and productivity.
- Secured First Prize for Overall Performance in Annual Mines Safety Week competitions for three consecutive years 2014, 2015, and 2016), recognizing outstanding contributions to workplace safety.
Manager, Mines Planning & Safety at Aditya Birla Group INDAL, UAIL, EMIL, BCML (1991-02 – 2014-04)
To look after compliance to EC and FC conditions. Coordinate with client and community respect to land clearance for mine development. To obtain 10te explosive magazine license for Baphilimali Bauxite mines. Faculty development for LDC and mines. Site grading for Alumina Refinery, Power plant and railway corridor at Doraguada, Rayagada.
- Oversaw end-to-end mine operations across Bauxite, Iron Ore, and Coal mines, including shift management, drilling & blasting, project execution, and systems management.
- Led employee training and safety initiatives, fostering a strong safety culture and ensuring regulatory compliance throughout mining sites.
- Streamlined bauxite transportation by optimizing the Aerial Ropeway Mono Cable) system, significantly improving material handling efficiency.
- Introduced Ripper Mining techniques in 1995 to eliminate drilling and blasting in bauxite extraction, enhancing operational safety and productivity.
- Played a key role in achieving an impressive 11.5 million tons of coal production during 2011 12 at BCML, Talcher, exceeding production targets.
- Bagru Hill Bauxite Mine recognized by the International Aluminum Institute IAI) from 1994 1998 for exceptional safety performance.
- Successfully engaged local communities to secure access to Baphilimali Bauxite Mines lease area in 2011, ensuring smooth project progression and stakeholder alignment.