Sr. QC Engineer - Quality Control
Send a job offer directly to this candidate
Hi I am Sohail presently I am working as an Sr QC engineer in SNC construction company pvt Ltd.i have 9 years experience in quality control engineer in highway and water supply sector.
Sr. QC Engineer - Quality Control at M/s ShankarNarayanaConstructions Pvt Ltd. (2024-08 – Present)
Drinking Water Supply Facilities to 1406 Rural Urban Local Bodies in Raichur District from Back water of Narayana Pura Reservoir through DBOT mode under Multi Village Drinking Water Supply Scheme. Project cost: Rs 1800 Cr. PMC: Egis India Consulting Engineers Pvt Ltd. Client: RDWSSD Dept Raichur.
Material Engineer - Quality Control at M/s Mecadez CoreTechnologies Pvt Ltd. (2022-09 – 2024-07)
State Highway Development Project Stage II Phase IV Package-5 (Karnataka). Project cost: Rs 150 Cr. Consultant: Mecadez Core Technologies Pvt Ltd. Authority: SHDP.
AQME - Quality Control at M/s DRN Infrastructure Pvt Ltd. (2021-08 – 2022-09)
Four Laning of Kamalapuram to Oddanchatram section of NH-209(New NH-83) from Design Km 0.000 to km 35.822 (Total length - 36.505 km) Under Bharatmala pariyojana phase - I Under the Category of NHDP on HAM in the State of Tamilnadu. Package-I (Tamilnadu). Concessionaire: Yashodhan Highways Pvt Ltd Independent. Consultant: SA Infrastructure Consultants Pvt Ltd. Authority: National Highway Authority of India. Project cost: Rs 820 Cr.
QC Engineer - Quality Control at M/s DRN Infrastructure Pvt Ltd. (2019-01 – 2021-08)
Four/Six Laning of Solapur to Bijapur road project section of NH-13(New NH-52) in the state of Maharashtra and Karnataka on BOT basis. Package-5 (Karnataka). Concessionaire: Vijapur tollways pvt Ltd. Consultant: L N Malaviya Consultants Pvt Ltd. Authority: National Highway Authority of India. Project cost: Rs 1200 Cr.
Trainee Engineer – Quality Control at Rajdeep Buildcon pvt Limited. (2017-11 – 2019-01)
Strengthening and widening to 2 lanes with paved shoulders of NH218 Bijapur- Hubali section in the state of Karnataka. Client: NHAI. Authority: Feedback infrastructure Pvt. Ltd. Project cost: Rs 280 Cr.
MTech in Highway Technology – RASTA - Center for technology Bangalore (2017-09)
B. Tech in Civil Engineering – Angadi Institute of technology and management belgavi (2015-03)