Senior Technician - KK Wind Solutions - Chennai, Tamil Nadu
(2023-03)
We are produced the converters and I'm working in breaker & busbar assembly section
- Heavily copper busbar assemble the section for power transaction and breaker assemble for power distribution and controls
- We are connected breakers cable and laying & routing
- We are assemble the ct coils,arc sensor, fuse links
- Drive process improvement of VSM cycle time reduction initiative and drive productivity improvements via process changes or improvement in future state
Production Technician - Vestas Wind Technology India Pvt Ltd - Chennai, Tamil Nadu
(2021-04 - 2023-02)
We are produced the converters and I'm working in breaker & busbar assembly section
- Heavily copper busbar assemble the section for power transaction and breaker assemble for power distribution and controls
- We are connected breakers cable and laying & routing
- We are assemble the ct coils,arc sensor, fuse links
- Drive process improvement of VSM cycle time reduction initiative and drive productivity improvements via process changes or improvement in future state
Production Technician - Nordex india pvt ltd - Chennai, Tamil Nadu
(2018-09 - 2020-10)
I'm worked in nacelle assembly section with sub assembly,testing & preventive maintenance
- Nacelle top control panel wiring, power cable routing & laying and connection
- Generator speed & vibration testing, hydraulic unit testing, yaw testing, emergency system and read the testing procedure
- We can operating semi gantry and EOT cranes
- We are assemble roof, cover, cooling systems and finally checking the nacelle quality check points
Electrical Technician Maintenance - Tafe Plant-2 - Chennai, Tamil Nadu
(2018-06 - 2018-09)
- Breakdown and utility maintenance
- Heaters and pneumatic maintenance
- Industrial wiring and testing
Engine Assembly Quality Control Inspector trainee - Royal Enfield Motors, TVT Plant - Chennai, Tamil Nadu
(2016-12 - 2018-06)
- Performed daily production as per the operation standard to meet daily target volume
- Doing performance testing of the engine to meet the customer satisfaction criteria
- To achieve the PDI performance to achieve the targets
- To achive Process aduit,gear checking, fly wheel runout checking engine vibration or noise checking
Technical Apprentice of Training Quality Control - Bharat Heavy Electrical Ltd - Trichy Tamilnadu
(2015-03 - 2016-03)
I worked on this organization for quality documentation
Electrical Technician - Sri ganesh wind power engineering pvt ltd
(2013-03 - 2015-03)
My role in this Organization is Electrical Technician.
- Install And Maintain Wiring, Control And Lighting Systems
- Final Testing of Nacelle Generator, Gearbox, Hydraulic Unit and Vibration testing
- Read Blueprint or Technical Diagrams to connect the panel wiring
- Inspect Electrical Components, Such As Transformers And Circuit Breakers
- Identify Electrical Problems and Trouble shooting in Control Panel, Pump and Motor
- Knowledge of Cable Routing, Electrical Panel Wiring and Nacelles Testing as per SOPs
- Measure and record the dimension of components/parts using measuring instruments and analyze the findings for discrepancy
- Perform and coordinate inspections and determine quality assurance testing models of raw materials and finished products
- Assemble goods on a production line, in working with production targets
- Perform any other related duties as assigned by Immediate Supervisor
- Finding ways to increase productivity
- Hub Wiring, Bus bar Assembly, Twist cable Doing with properly
- Administering management information systems
- Utility maintenance and Breakdown Maintenance
- Carry out cleaning and basic maintenance of 5S check sheet in working areas and machinery
- Knowledge of Safety and Other Checklist