Executive Engineering and Maintenance - Natural Product Manufacturers - Madhyamgram, Kolkata, West Bengal, 700155
(2026-03)
- Install hydraulic PP Plates filter press and Installation new 5 kl PP frp reactor & 10 kl SSR Reactor
- Worked on Gasifier boiler for hot water generator and PM maintenance work
- Worked on Centrifuge filter, Dryer, Multimill, Compactor, Sifter Machines
- Maintain predictive, Preventive and Breakdown Maintenance of pharmaceutical equipment
- Major Job to deal with pumps, gearbox, Hydraulic and Pneumatic system
- Supervising the Manpower through Project Guidelines
Executive Project and Maintenance - West Bengal Chemical Industries Limited - GIDC Industrial estate, Dahej-2, B Gujarat
(2025-07 - 2026-02)
- Install hydraulic PP Plates filter press and Installation new 5 kl PP frp reactor & 10 kl SSR Reactor
- Drawing reading, Project management and planning, Budget management and cost control
- Maintenance of Spray dryer system
- Worked on Centrifuge filter, Dryer, Multimill, Compactor, Jet mill, Sifter Machines
- Maintain predictive, Preventive and Breakdown Maintenance of pharmaceutical equipment
- Worked on AHU, HAG, Burner, Pump, Motor, Gearbox, Equipment troubleshooting and repair
- Proficiency in relevant engineering disciplines (mechanical, electrical)
- Team leadership and management, contractor management
- Performance management and employee development
Maintenance Engineer Project Coordinator - Ravasco Transmission And Packing India Pvt Ltd. (Hindustan Rubber) - GIDC Vapi Phase-II, Vapi, Gujarat
(2023-05 - 2025-06)
- Install New Bunbury Mixture Capacity 270 ltr and Auto Batch of Cooling Machine and Auto staging system
- Install Automatic Carbon Feeding System & Oil Feeding System, Semi-Automatic Chemical Weighing system and recipe management system. Install new rubber vulcanization press 10600mm X 1800mm double decker
- Maintenance of All Calendar machine and Rubber Vulcanization press
- Maintenance of TCU, Heat exchanger, Cooling and Thermic line
- Maintenance Air compressor, Pneumatic system And Cooling tower
- Preventive Maintenance, Breakdown Maintenance
- Scheduled maintenance, documentation of all report
- Analysis of Repetitive Equipment Failures
- Major Job to deal with pumps, gearbox, Hydraulic and Pneumatic system
- Supervising the Manpower through Project Guidelines
- Documentation of all Mechanical Equipment
- Monitor and control maintenance cost
Quality Control Engineer - Fiber glass processors - Rajkot, Gujarat
(2022-01 - 2023-04)
- Major job to deal with FRP Product manufacturing like pressure vessel, Tanks, Underground safety tank, Bio gas tank, FRP cable tray, Gutter, Distillation system
- Material handling system, Material management system, Quality, Fabrication, Erection, Painting
- Manpower handling / Contractor Management
- Quality control monitoring
- Production and planning coordination
- Material flow improvement
- Engineering drawing reading skills
- Extremely detail orientation
Machine maintenance trainee - Apollo Tyres Ltd (Under MN Engineering Maintenance Division) - Oragadam, Tamilnadu, 631604
(2020-01 - 2020-06)
- Maintenance all conveyor roller and bearing
- Routine claque up of all mills oiling and greasing system
- Fixing the problem of all gearbox and bearing
- Air compressor, Hydraulic and pneumatic problem solving