Pressure Vessel Inspection asper ASTM /SA & ASME Sec VIII DIV 1. Inspection of Storage tanks, Dust Silo, Air cooled condenser, Evaporator, Super heater, Sub cooler, heat exchanger. Tubes, bundle, fan & motor as per drawing.
- Factory Acceptance Test for Manifold/Structural Skid inspection
- Visual inspection of cable tray, Junction box, limits switches
- Loop & continuity Testing of cables, Manual functional test for open & close
- Functional Test of Transformer, Distribution Board & EHT Cables & accessories
- Mechanical Leak Test of by Air or Nitrogen & leakage inspection verification
- Tray Fabrication has been as per drawing & visual defects inspection
- P & ID verification as per physically assembled
- Bends Designed as per angle and as specified by drawing inspection to be verified
- Dummy Holes to be sealed with proper plugs to be inspected
- All bolted connection Torque should be as per Specification to be inspected
- Noise, vibration, pump run test, P& ID verification, structural Visual And Dimension, Painting, FAT
- Be part of the technical development team to help coordinate product safety and compliance requirements
- Develop line-art and content for product labels and instruction manuals for global products
- Coordinate internal and 3rd party inspection lab approvals of product labels and manuals using adobe shared review
- Resume Preparation and modifying resume and selecting resume for job orders
- Ensure that all products being sold or to be launched have a full set of compliance validation and verification documents and store in server Library
- Be responsible for the daily management of test requests and reports to support compliance program
- Verify the objectives of allocated projects, work closely with the technical team, communicate progress, elevate key decisions required and ensure regular progress against the critical timings of the business
- Flash Reports and Inspection Reports Review and submitting to client as per project requirement
- Other duties and projects as assigned
- Supervises and coordinates activities of workers engaged in project activities
- Dimension check each of the test specimens has been carried out and found satisfactory
- Witnessed mechanical test (tensile test) on offered sample and found satisfactory
- Overall result was found accepted and satisfactory during time of inspection
- Testing result was found meet the requirements as per standard
- Calibration of the testing equipment's has been verified during inspection
- Witnessed chemical analysis test on the offered sample and result monitored
- Chemical analysis reports were reviewed and found to be acceptable as per material /ASTM /SA standard
- Sample test reports have been reviewed
- Calibration of the testing equipment's has been verified and found satisfactory
- As per Material grade standard verified and found Satisfactory
- IGC Test verified
- Hardness witness/impact witness
- GRP pipe Visual, Dimensional, Testing Acceptance of test Contacted
- Water Absorption test of Flanges, Equal tee & ELBOW, Pipe
- Degree of Curing (TG values) of Flanges, Equal tee & ELBOW, Pipe
- Loss on Ignition Test for Flanges, Equal tee & ELBOW, Pipe
- Product Marking / Identification
- Stiffness test & Deflection Test
- Axial Tensile Strength of Pipe
- Hoop Tensile Strength of Pipe
- Loss on Ignition Test & Structure Glass content of Pipes
- Dimensional Inspection
- Hydrostatic Pressure Test
- Barcol hard ness test
- Test Reports & final inspection
- As per approved drawing verified overall length, Baffle to Baffle dimensional Tube expansion inside diameter and outside diameter of tube after expansion verified and tube inside dimension after expansion verified as per approved drawing
- As per approved Procedure weld visual inspection has been carried out for all tag no and found accepted as per ASME SEC VIII Div 1
- As per client Approved all attachments verified and visually inspected and as per ASME SEC VIII Div 1
- Visual inspection verified on tube sheet welded joints before NDE and found satisfactory
- Verified as per ASME SEC VIII DIV.1 2017 ED +TEMA 9TH Edition ED 2007 +API660 ED 2015 Verified all Parameters
- Visual and Dimensional inspection of tube bundle, flange tag no and baffle dimension, overall length, tube expansion inside and outside verified as per approved drawing
- Tube projection has been verified as per approved drawing and readings matching the specification
- Tube outer diameter and inner diameter verified and Found satisfactory as per Approved drawing
- Expansion percentage 2-3 % checked as per client specification and found satisfactory
- Tube sheet expansion hole diameters and groove Dimensions
- Tube OD and Wall
- MTR's
- Orientation of inlet, outlet, and baffles
- Verification of baffle tie rods being properly secured
- Nozzle material, location, square, plumb, two-hole
- Internal prior to bundle insertion
- Shell Dimensions
- Head/Channel Dimensions
- Impingement plate installation
- Welder Qualifications
- Tube Rolling Procedure
- % Reduction in Wall
- In-Process Welding
- Final Welding
- Saddle/Support location and orientation
- Gasket Material
- Total assembly of one bay of each cooler
- Fan clearance and Angle check
- Noise Test
- Vibration Test
- As per approved hard ness test approved procedure verified and its not exceeded 200 HBW, as per NACE MR 0175 and NACE RP 0472C Hardness verified for shell and channel and found satisfactory
- With that microscope reading impression verified, weld seam, HAZ and weld deposition nozzle one part and manway hardness verified and found satisfactory
- Material Traceability Handling Welding Inspection Fit-Up, Visual Inspection, Dimensional spool
- Check NDT requirement and material take number report of the assigned project
- Ensure All NDT carried out as per specification and costumer requirement
- Discussion with client and all Quality matters
- Release Inspection
- Prepares necessary documents and Quality Control Inspection reports including punch list
- Witness of Material identification and Verification
- Handling in Welder test Qualification preparation, WPS Preparation
- Welder qualification witness, PQR Witness, WPS prepation, Lab test witness
- valuates, selects and applies standard engineering techniques, procedures and criteria, using judgment in making adaptations and modifications
- Performs all the tasks necessary to complete primary design elements for engineering works
- Completes assignments requiring the investigation of a number of variables
- Performs structural analysis, design, detailing
- Assists with investigations, developing plans, and specifications
- Completes design checking of calculations and construction shop drawing reviews
- Responds to contractor RFI
- Performs regular field observations and write field reports
- Performs Quality Control/Quality Assurance review tasks
- Checking for shuttering, fixing and leveling of expansion joint
- Layout of the building, line and level, excavation for foundation, checking of shuttering brick work, plaster work
- Setting out the works in accordance with the Drawings and Specifications
- Executing the Work as per Quality and Safety norms within Time
- Issue working drawing and coordinate change management
QA/QC INSPECTION/EXPEDITING ENGINEER - ATS PIPE LINE SERVICES - SHARJAH, UAE
(2017-01 - 2017-05)
- Pressure Vessel inspection as per ASME SEC VIII DIV-1
- Factory Acceptance Test for Manifold/Structural Skid inspection
- Visual inspection of cable tray, Junction box, limits switches
- Structural fabrication visual, Dimensional & NDT inspection as per AWS D1.1
- Spool welding visual & pipe hydro test inspection as per ASME B31.3