Project's Incharge - Ronalda's Construction - Madgao, Goa
(2023-06)
- Planning, organizing, and directing the completion of projects, while ensuring these projects are on time, on budget, and within scope.
Project Manager - Runwal Developer pvt. Ltd. - Runwal Elegante Site, Mumbai
(2015-05 - 2023-05)
Residential Towers
- Execution, Quality control as per IS standards
- Co-ordination with Architects, RCC Consultants, Service Consultants, EHS (Environment Health & Safety)
Project Manager - DB REALTY - Mumbai
(2011-03 - 2015-05)
3 nos. Residential Building 75 floors
- Quality Assurance, Quality control.
- Co-ordination with Architects, RCC Consultants, Service Consultants
- Executing work as per approved plans by Government Authorities within Municipal Limits.
- Preparing Agendas & Minutes of meeting.
- Tendering, Preparation for high rise committee
- Preparing BOQ, Floating Inquiry.
- Preparing Comparatives, Assigning Contractors, Checking & Certifying bills of various Agencies & Contractors.
- Project costing, Cost Control.
Project Manager - GSIDC - Kalabhavan Vasco Sancole, Goa
(2009-05 - 2011-05)
- Quality control, Co-ordination with Architects, RCC Consultants, Service Consultants, EHS (Environment Health & Safety)
Project Management - S.K. ENTERPRISES - Mumbai
(2007-01 - 2009-02)
Sunshine tower, (42 storey Commercial Building 180.75 meters ht.) With Structural steel, Glass Glazing, ACP Cladding, Mechanical car parking System, Plumbing, Electrical work & Mivan formwork.
- Preparing Comparatives.
- Working with Total Station for checking verticality & co-ordinates
- Co-ordination with Designers, Architects & Mahimtura Consultant for services of Plumbing, Electrical & Firefighting.
- Preparing Agendas & Minutes of meeting. Tendering.
- Preparation for high rise committee.
Project Engineer - NIRMITI CIVIL ENGINEERING SERVICES - Mumbai
(2003-01 - 2006-12)
POWER PROJECT - Boiler House, Steam Turbine Foundations, Air Pre-Heater Structures, controlled Building, Belt Filter House.
- RCC work, Maintaining quality standards.
- Line out of Building and Demarcation of foundations
- Execution of superstructure
- Working within Pre- Determined budget and Bar Chart to achieve target.
- Cross Checking, calculation and Estimation of Bills of Contractors.
- Physical and Chemical Testing of Steel Procured as per IS 1786:1985 for Fe 415, Fe 500
- Planning for shuttering and getting approval from Consultants.
- Preparing Bar-Bending schedule as per drawing.
Site Engineer - LARSEN & TOUBRO LTD. - Mumbai
(1997-01 - 2003-01)
Hostel buildings at Powai Mumbai for IIT students 12 storey building 6 wings with cafeteria (4.8 lac sq. ft.)
- Keeping a close eye on Stores for their inwards and outwards of materials.
- Co-ordination with Architect & RCC Consultant.
- Co-ordination with all contractors for smooth working of the Project.
- Maintaining Quality Standards for the Works.
- Following the Check list method for each and every activity. Checking of Bills Bar Bending Schedule.
- Preparation of Client & Labour Contractors Bills on EVERY FORTNIGHT.
- Finalisation of rates and payment schedule with contractors & suppliers.
- Estimation of quantities, analysis of rates & cost control.
- Ongoing Project Costing & Comparing Estimates with Actual Progress of Work.
Site Engineer - MANDORAN DEVELOPERS - Mumbai
(1992-05 - 1996-11)
Shiv Dharshan bld (Residential) Location - Charni road (W), Mumbai. 7- Storied Residential Building. Total 62 numbers of Flats, 9 in each floor.
- Execution, Planning & co-ordination with sub-contractors scheduling day to day work
- Complete Building work including finishing.
- Concrete Mix Design was conducted on site and the same was approved with Consultants.
- Suppliers Payments Bills and Preparation of Sub Contractors Bill.