Sunil Chandra
B-Tech in Mechanical Engineering
Hire this person
Send a job offer directly to this candidate
About
Sunil Chandra, a seasoned professional with a B-Tech in Mechanical Engineering, has a robust career background more than 15 years in construction and project management, particularly in high-speed rail and infrastructure projects.
Skills include leading the supervision and alignment of launching girders, managing the erection of precast structures, and overseeing mechanical activities in casting yards. Successfully contributed to the completion of significant projects such as the 15Km viaduct in the MAHSR project, and the 4.7KM Viaduct in Nagpur Mumbai Super Communication Expressway. Accomplishments include enhancing project efficiency, reducing operational costs, and ensuring structural integrity and safety.
Opportunities to leverage expertise in project management and mechanical engineering.
experience with specific tools and technologies, such as PTFE and elastomeric bearings, underscores his proficiency in the field.
Experience
Sr. Manager Erection –& Launching - H.G Infra Engineering Limited - Jamshedpur
(2025-04)
Construction of 4 lane Elevated corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241+940 to km 251+961) (Length 10.021 km) under NH (O) on EPC mode in the State of Jharkhand.
- As Erection-in-charge responsible for all the activities of Pre cast Pier cap (130MT weight and 19M width) and I-girder (30,35 Mtr) erection works and safety precautions to be followed during erection process.
- Inspection and tests before hoisting personnel
- Monitor designs regularly, particularly in the event of changing site conditions,
- Supervision of Erection & Launching Activities
- Safety & Quality Assurance
- Maintain erection checklists, crane load charts, lifting plans, and safety documents.
- Ensure compliance with IRC, BIS, and MoRTH standards as applicable
Manager M1B- Erection - Larsen & Toubro Ltd - Gujarat, (NHRCL Project)
(2023-01 - 2025-03)
MAHSR Project (Bullet train C4 pkg) -
- Led the supervision and alignment of Single and Double Box Launching Girders, ensuring precise execution and operational efficiency in the High-Speed Rail Project (MAHSR).
- Managed the erection of precast structures, including U-girder, I-girder, T-girder, pier cap, and noise barriers, contributing to the successful completion of the 15 Km viaduct.
- Oversaw the lifting, gluing, and alignment of segments, as well as the fixing of PTFE and elastomeric bearings, ensuring structural integrity and safety.
- Conducted post-tensioning and grouting of precast structures, enhancing the durability and stability of the construction.
- Attended Weekly Review Meetings (WRM) with NHSRCL and L&T teams, facilitating effective communication and project alignment.
- Reviewed and ensured compliance with Method Statements (MS), maintaining high standards of quality and adherence to approved procedures.
- Monitored work progress according to the approved Commission Work Program (CWP) and prepared detailed Monthly Progress Reports (MPR) to track project milestones. Initiated and managed Requests for Inspection (RFI), ensuring timely inspections and adherence to project timelines.
Asst. Manager- Erection - Trans rail Lighting Limited - Kosi, Bihar (NAHI Project)
(2020-10 - 2023-12)
Kosi Bridge project (Bakaur to Bhaja, NH-527A Under BRT Scheme of Bharatmala Pariyojana Phase-1)
- LG operation & Span erection
- Successfully led the erection and commissioning of the Overhead Launching Gantry (NRSAS) of 132.5 meters long and Capacity 1800 tons (Including 10% load test ensuring Deflection within design limit).
- Assembly & Erection of LG, Erection of Precast segment by Overhead launching system, Dry matching, Segment Gluing, Stressing, Grouting, Span lowering, Span alignment, Bearing Fixing, LG Dismantling,
- Oversee erection activities at the site to ensure proper execution.
- Monitor the quality of work and compliance with design specifications.
- Develop and implement detailed erection plans and schedules.
- Coordinate with project managers, engineers, subcontractors
- Ensure that all erection activities are aligned with the project timeline.
Sr. Engineer (CPE- Erection) - Afcons Infrastructure Limited - Kosi, Bihar (NAHI Project)
(2017-02 - 2020-11)
Project-2: 1. Nagpur-Mumbai Super Communication Expressway (PKG-14) Twin Tunnel(13.3KM). 2. Viaducts (1.2KM +3.5KM) The viaduct was a balanced cantilever cast in-situ bridge with a length of 1.2 kilometers containing 35 no’s spans. Project-2: Annaram barrage is 1270m long with 66 radial gates of 15m along with energy dissipation arrangement and abutments. It has 72 piers, each 100m long, 4m wide and 24m high.
- Viaduct, I-Girder, T-Girder PI-Girder Erection
- Review Drawings and Plans, Erection Methodology, Resource Allocation, collaborate with design, fabrication, quality, and safety teams to ensure smooth workflows. Across the Nagpur Mumbai Super Communication Expressway Package 14 project, and Annaram barrage project ensuring effective resource deployment for seamless execution.
- Verify the availability and condition of girders (size, length, and dimensions).
- Inspect foundations, piers, and bearings to ensure they are ready for girder placement.
- Supervise crane or launching gantry operations for lifting girders.
- Oversee proper alignment, levelling, and positioning of girders.
- Ensure temporary supports and stabilization during the process.
Engineer - Gammon India Limited - Bhutan
(2014-07 - 2017-02)
Mangdechhu Hydro Electric Project 720 MW, Bhutan, two intake tunnels of 196 m and 150 m length, and a 13.54 km long headrace tunnel capable of discharging 118 m³ of water per second. The 152 m high surge shaft has a diameter of 13.5 m.
- Tunnelling activity & Machine maintenance
- Managed the entire operational and maintenance activities for mechanical equipment and plant operations at the Mangdechhu Hydroelectric Power Plant, ensuring efficient site execution.
- Implemented effective schedules for preventive and breakdown maintenance of construction equipment, including Excavators, Dozers, Loaders, and Batching Plants, enhancing equipment reliability and performance.
- Coordinated maintenance for a diverse range of machinery such as Concrete Pumps, Transit Mixers, and Pneumatic Machines, ensuring optimal functionality and minimizing downtime.
- Led the maintenance team in executing timely repairs and servicing of critical equipment like DG sets, Shot-Crete machines, and Crawler Drills, contributing to uninterrupted project progress.
- Developed and enforced safety protocols and maintenance procedures, resulting in a 20% reduction in equipment-related incidents.
- Collaborated with cross-functional teams to streamline operations and improve maintenance processes, leading to a 15% increase in overall project efficiency.
- Maintained comprehensive documentation of maintenance activities, ensuring clear communication and seamless knowledge transfer among team members.
- Consistently adhered to industry standards and best practices, ensuring high-quality maintenance and operational outcomes.
GET & Engineer - Coastal Projects Limited - Sikkim West
(2010-12 - 2013-10)
Rangit Stage-IV Hydro Electric Project 120 MW, Sikkim. Head Race Tunnel- horseshoe shaped and has a diameter of 4.5Mtr ,Length - 12.5 km
- Supervised and managed all mechanical activities at the Rangit Stage-IV Hydro Electric Project site, including power house, surge, shaft, and HRT, ensuring efficient operations and adherence to project timelines.
- Successfully erected and commissioned critical machinery such as Road Header, L2D Boomer, and Scheff Loader, contributing to the project's smooth progression.
- Led the erection and commissioning of a 35-ton E.O.T crane, enhancing the site's operational capabilities and safety standards.
- Managed the maintenance and operation of essential equipment, including Tamrock, Boomer, Transit Mixer, Hauling equipment, Compressor, DG sets, Shotcrete machine, and Pneumatic machine ROC (203 crawler drill), ensuring optimal performance and minimal downtime.
- Coordinated with the client, Jal Power Corporation of India, to ensure project specifications and requirements were met, contributing to the successful generation of 120 MW of power.
- Implemented effective maintenance strategies, reducing equipment failure rates and extending the lifespan of critical machinery.
- Maintained consistent documentation and reporting of mechanical activities, ensuring clarity and accuracy for seamless communication with stakeholders.
- Utilized action-oriented language and specific details to convey responsibilities and achievements, avoiding industry jargon for broader comprehensibility.
Education
B-Tech - Mechanical - RGPV (2006 - 2010)
HSC (12th) - BSEB (2003)