Skip to main content
Sunil Singh

Sunil Singh

Deputy Project Manager

Talent
RanchiMember since October 16, 2026
AutoCADTotal StationL-SectionPreparation of L-Section and cross section of roadsCo-ordinates calculationFRLCamber CalculationEngineering and Topographical SurveysSetting outFixing the center lineTBM shiftingClose traverseTaking cross sections
·

Hire this person

Send a job offer directly to this candidate

AutoCADTotal StationL-SectionPreparation of L-Section and cross section of roadsCo-ordinates calculation

About

A person with strong commitment to the duties assigned & Interested in doing the best possible job by my own standards & tends to be a team player rather than loner. Able to work under stressed conditions, leadership, Team work, Flexible, Sincere and Dynamic, Hardworking. 20 Years experience in Highway & Survey.

Experience

Deputy Project Manager - M/s Dhariwal Build tech Limited - Bihar

(2024-04)

Project: Permanent rectification of 4 nos .of black spot on NH-27 (Old NH-28) of Kotwa-Mahsi-Muzaffarpur Section- from Km-440.000 to Km-520.000 (Total Length 80 KM),4 nos.of Black spot on NH-27 of Muzaffarpur -Darbhanga-Purnia Section (Km 0.000 to Km 148.550 and Km 159.357 to Km 287.860) total length 277.053 Km),& Removal of 1No of at grade junction near Ratanpur junction in Ratanpur Village on NH122 in the State of Bihar on EPC Mode.

Client: National Highway Authority of Indias.

Project Cost: 236 Crs.

  • Filling embankment construction works having protected slope and construction supervision Sub-grade, sub-base (GSB) CTSB, Base-Course (WMM), Bituminous Macadam, DBM, BC, DLC, PQC, Concrete.
  • Responsible for National Highway (Embankment, Sub base, base course & wearing course, bituminous & non-bituminous). Road marking as per Technical Specification and entering the running measurement records of the work executed in the measurement book and producing it to the client.
  • Preparation of L-Section and cross section of roads, providing data at site, Co-ordinates calculation, FRL, Camber Calculation.
  • Carried out Engineering and Topographical Surveys, including setting out, fixing the center line, TBM shifting, close traverse, taking cross sections and using latest survey equipment including Total Stations.

Deputy Project Manager - MCC MHAHADEO CONSTRUCTIONS - Bihar

(2021-12 - 2024-09)

Project: Construction of New 4-Lane Bridge across River Kosi at Phulaut Including Rehabilitation and Upgradation of existing Birpur-Bihpur Section of NH-106 from Km 106+000 to Km. 134+918 to 2-Lane with Paved Shoulder In the State of Bihar on EPC Mode. Client: Ministry of Road Transport & Highway AFCONS INFRASTRUCTURE LIMITED.

Survey Manager - Egis India Consulting Engineers Pvt.Ltd.

(2019-03 - 2021-11)

Project: Development of Purvanchal Expressway (Package-II) From Sansara40+200 to Jaraikala 79+900 In the state of Uttar Pradesh.

Assistant Survey Manager - Sadbhav Engineering Limited - Uttar Pradesh

(2016-11 - 2019-03)

Project: Development of Purvanchal Expressway (Package-II) From Sansara40+200 to Jaraikala 79+900 In the state of Uttar Pradesh.

Assistant Survey Manager - Sadbhav Engineering Limited - Gujarat

(2012-08 - 2016-11)

Project: Four lining of Bhavnagar - Talaja Section of NH-8 E from km. 7.090 to km 53.585 (Design chainage from km. 6.945 to km. 54.990) (Package -1) in the State of Gujarat to be executed on Hybrid Annuity Mode under NHDP Phase-IV.

Survey Engineer - Sadbhav Engineering Limited - Rajasthan

(2010-03 - 2012-08)

Project: Four Lanning of Gomati Chavurah-Udaipur Section of NH-8 (from Km.177/000 to Km. 260/100) in the State of Rajasthan under NHDP Phase IV on Design, Built, Finance, Operate and Transfer (Toll) Basis. Project Cost Rs. 914 Crores (9,140million).

Asst. Survey Engineer - MGCPL - Maharashtra

(2006-08 - 2010-03)

Project: 4/6 leaning of Dhule to Palasner of NH-3 from km 168+500 to km 265+000 in The state of Maharashtra on DBFOT Basis Under NHDP Phase-III. Project Cost Rs. 1371 Crote. Project: Yamuna Expressway Noida to Agra at Chainage 0+000 to 165+000 in Package(A-12), Package Chainage From 121+400 to 132+690 Near Balarampur Village in Mathura District.

Education

10th - Board of School Education Uttar Pradesh Board Allahabad (1999)

12th - Board of School Education Uttar Pradesh Board Allahabad (2001)

Diploma - Government Polytechnic Collage Faizabad Uttar Pradesh (2004)

Computer Basic and AutoCAD 6 Months course - Slim IT Durga Kund Varanasi Uttar Pradesh

Skills

Deputy Project Manager

Reviews

Related