Skip to main content
Swet Nagar

Swet Nagar

Senior Engineer Production

Talent
NoidaMember since September 20, 2026
Problem SolvingTeam WorkLeadership And Team CollaborationAdaptabilityTeamwork/CollaborationTime ManagementMultitasking
·

Hire this person

Send a job offer directly to this candidate

Problem SolvingTeam WorkLeadership And Team CollaborationAdaptabilityTeamwork/Collaboration

About

Results-driven Production Engineer with 6 years of experience in the wiring harness manufacturing industry, including 5 years with Motherson Group and 1 year with Everest Group. Skilled in production planning, process optimization, quality control, and team coordination to achieve operational excellence. Proven ability to improve productivity, reduce defects, and ensure timely delivery while maintaining high safety and quality standards.

Adept at handling manufacturing processes, troubleshooting production issues, and implementing continuous improvement initiatives. Seeking to leverage technical expertise and hands-on experience to contribute effectively to organizational growth.

Experience

Apprenticeship (ITI) at Mothersun Sumi System Ltd (2019-01 – 2020-12)

  • Knowledge Of Quality Inspector Checking Wire On C&C Machine
  • Knowledge Of Vernier Caliper; Micrometer; Puss-pull Gauge; Stepping Gauge; Magnify Lamp
  • Knowledge Of Crimping & Striping All Tools Use
  • Knowledge Of Line Control, Visually Check Defects
  • Knowledge Of Quality All Line Control Manual Crimping, Joint Crimping; Battery Machine, Resistance Welding Machine; Heating Frequency Welding Machine
  • Knowledge Of Quality Defects Check; Manual Crimping And Auto Crimping

Quality Inspector at Mothersun Sumi System Ltd (2020-01 – 2021-12)

  • Knowledge Of Quality Control Check Terminal, Wire, Connector And Grommet; VTB, RWC Welding All Defects Check Visual, And Instrument Check Defects
  • Knowledge Of Area Wise Defects Analysis Update Quality Engineer
  • Knowledge Of 7 Tools Use, 5S
  • Customer Can Send(Problem) Containment Checking When Customers Issue
  • Kaizen Ideas For Improvement In Process And Product
  • Training New Employees And Explaining To Them How To Work In Each Area

Quality Controller at Mothersun Sumi Wiring India Ltd (2021-01 – 2022-12)

Success In Life Through Hard Work Is My Main Aim

  • Check And Verification Of The Poka-yoke, 4M, Daily Check Sheet And All Related Documents
  • Study And Analysis Critical Quality Defects Reported In-house And Internal Field Issues
  • Daily Line Rejection Part Analysis And Minimize The Defect
  • Have Good Knowledge Of Wiring Harness

Apprenticeship (DET) at Mothersun Sumi Wiring India Ltd (2022-01 – 2023-12)

  • Able To Work Under A Hard Schedule And Ability To Work With Team
  • Have Ability To Work Under Pressure
  • Ability To Work In Multiple Projects, Calm Cool Nature To Cope Up With Job Stress
  • Ensure Adherence To Production Schedules, Quality Standards, And Safety Regulations Throughout The C&C Machine Process
  • Have Technical Knowledge On The Production Line
  • Experience Working With C&C Machine Operating System
  • Experience Working In The Automotive Industry
  • Have Good Knowledge Of The Terminals Installed In Wiring Harness
  • Have Good Experience In Operating C&C Machine

Production Supervisor at Mothersun Sumi Wiring India Ltd (2023-01 – 2024-12)

  • New Model Trial-quality Improvement Activities Responsible For LPC And CPG Implementation At Assembly Line
  • All Documents Verification And Maintain Them
  • Verification Of Assembly Process
  • Active In Daily Morning Shift Start Meeting
  • Analysis And Control The Daily Machine Wise Scrap And Line Rejection
  • Daily Check And Maintain The Temp. & Humidity Data Of Shop Floor
  • Check Daily Documents In Line & Machine
  • Responsible For Productivity
  • Responsible For The Inventory Of Finished Goods
  • Responsible For Schedule Adherence Of Product With Right Quality Cost
  • Responsible To Deliver Line Output Without Compromise On Quality & Safety
  • Daily Basis Monitoring Of Rejected/Reworked Parts
  • Completion Of Internal Planning As Per Requirements
  • All Process Audit Observation Same Day Closure
  • Daily Process Audit Conducted As Per Plan
  • Have Good Experience In Planning Manpower On Machines And Handling Manpower; Currently Handling Manpower For 40 Employees
  • Also Handling 12 Machines Of Different Types
  • Working On New Project In Airbag Wiring Harness Model Shift, Baleno, Wagonr

Engineer (Production) at Everest Cables and Connectors Private Limited (2025-01 – 2025-12)

I have worked on the wiring harness of all these customers and I have the necessary knowledge:- Exicom, Genus, V-GUARD, Shiv ram medical, Spark Minda, Have Good Experience In Planning Manpower On Machines And Handling Manpower; Currently Handling Manpower For 60 Employee I have also worked on projects involving electronic and DC chargers and wiring harnesse Manufacturing the small wiring harnesses that are used inside the DC charger I also have knowledge of new product development

  • Manufacturing parts according to the PPC plan specifications and planning the production after checking the Ro-materials in the store.
  • I have significantly improved production by doing things like planning in advance which parts we need to work on the next day and ordering raw materials on time
  • Prepare the Home Appliances wiring harness for the DC charger
  • Setting the plan on the cutting machine according to the PPC
  • Prepare production reports for all areas of the wiring harness

Senior Engineer (Production) at Noida electronics international (2026-01 – Present)

My job is to provide material for two lines on a daily basis. I know about multiple parts like - Wire Harness, Connector Harness, Group Harness I am daily that production with less manpower is target achive I also have the knowledge to set up a new line- Crimping area, part fitting area, Assembly area I know how many pieces of a specific part can be produced, the processes involved, and the number of people required. I am aware of all the potential defects involved in wire harness manufacturing—specifically, the types of defects that occur.

Havells, Dixon, Napino Company parts are currently being manufactured on the lines I am looking at.

  • I can consistently meet the maximum possible production targets with the available manpower. I know how to maximize production output even with frequent changeovers.
  • Execute daily and monthly production plans as per targets.
  • Identify and resolve production bottlenecks and line issues.
  • Allocate manpower effectively across production lines.

Education

High School – Janta Inter College (2013-01)

Intermediate – Janta Inter College (2015-01)

ITI – Indira Gandhi Memorial ITI (2017-01)

Bachelor of Arts – CCS University (2022-01)

Diploma – Academy Of Technology Memorial Sincere (2022-01)

Skills

Senior Engineer Production

Reviews

Related