Skip to main content
Venkat Singh

Venkat Singh

SR. PROJECT ENGINEER

Talent
TirupatiMember since November 2, 2026
Preventive maintenance
·

Hire this person

Send a job offer directly to this candidate

Preventive maintenance

About

Results-driven Senior Project Engineer with 8+ years of experience in project execution, plant maintenance, operations management, and environmental engineering. Adept at leading multidisciplinary teams, optimizing processes, enhancing operational reliability, and ensuring strict adherence to safety and regulatory requirements. Experienced in solid waste processing facilities, preventive maintenance strategies, vendor coordination, and continuous improvement initiatives.

Recognized for strong leadership, technical expertise, and a proactive approach to driving operational excellence and project success.

Experience

Sr. Project Engineer at ZIGMA GLOBAL ENVIRON SOLUTIONS PVT LYD. (2020 – Present)

  • Managed production operations of solid waste processing plant, focusing on operational efficiency and sustainable practices.
  • Coordinated with maintenance teams to ensure daily production targets and minimize equipment downtime.
  • Planned manpower, allocated shifts, and reported daily metrics to enhance workforce optimization.
  • Implemented process improvements that reduced breakdowns and enhanced plant output.
  • Monitored and maintained critical equipment including conveyors, shredders, balers, and compactors.
  • Increased plant availability by 15% through effective preventive maintenance strategies.
  • Reduced energy consumption by optimizing overall process flow.

Assistant Maintenance Engineer at PUSHPIT STEELS PVT LTD (2018 – 2020)

  • Executed shutdown and breakdown maintenance activities for rotary kilns, air fans, blowers, and dust handling systems.
  • Supervised erection and commissioning of sponge iron plant equipment, ensuring operational readiness of kilns, coolers, and conveyors.
  • Ensured compliance with safety and quality standards during erection and production processes.
  • Coordinated with vendors and contractors, facilitating timely execution of erection work to maintain project schedule.
  • Monitored daily process metrics, manpower productivity, manufacturing costs, and inventory against defined targets.
  • Served as primary point of contact for contractors and vendors, ensuring adherence to contractual terms.
  • Organized kickoff meetings with contractors and consultants to finalize basic engineering inputs with design team.
  • Tracked submission and approval of all drawings and documents, ensuring compliance with master document list for project integrity.

Education

Bachelor of Technology – Sri Venkateswara Engineering College (2012 – 2016)

Skills

SR. PROJECT ENGINEER

Reviews

Related