Network Planning Manager - Sybex Support Services Private Limited (RVNL-Rail Vikas Nigam Ltd) - Noida
(2025-04)
- Responsible for OFC Network Planning and Designing for UPE and UPW Circle in BBNL (Bharat Broadband Network Limited) Project.
- Ensure network design should be as per guidelines.
- Monitoring design progress, survey status with DGPS tool and creation of RFC, BoQs and SoQs as per survey inputs and Data should be as per RFP guidelines.
- Ensure to vendors shared proper data to BSNL for approvals.
- During the execution ensuring to capture all the details and deviations (Photos, Videos with DGPS.) with evidence to update As Built in AutoCAD and ArcGIS.
- Ensure uploading all data in BSNL GIS portal with proper coding and attributions.
GIS Manager - Presto Info Solutions Pvt Ltd
(2023-04 - 2025-04)
- We are working on Delhi Safe City (DSC) Project. This project is under Delhi police to lay the 3000 KMs UG fiber to install and connect Cameras.
- We are making the fiber laying plan through ArcGIS to connect more than 10 thousand Cameras on multiple locations from PODs, C4i (Police Headquarter), C3i (District headquarters), C2i (Police Station) and JBs (Junction Box).
- Responsible for GIS data management.
- JBs and Cameras received after survey with respective teams.
- We made desktop plan for C2i, C3i, C4i and PODs to release construction team to do the survey with ROW team.
- We received the input from construction team and made changes as per input received from construction team. And release the RFC plan with construction pack C2i wise to apply ROW and for execution.
- To design OSP Network Planning as per requirement of business teams.
GIS Manager - Uttez Digital India Pvt Ltd
(2022-05 - 2023-03)
- We are working on Delhi Safe City (DSC) Project. This project is under Delhi police to lay the 3000 KMs UG fiber to install and connect Cameras.
- We are making the fiber laying plan through ArcGIS to connect more than 10 thousand Cameras on multiple locations from PODs, C4i (Police Headquarter), C3i (District headquarters), C2i (Police Station) and JBs (Junction Box).
- Responsible for GIS data management.
- JBs and Cameras received after survey with respective teams.
- We made desktop plan for C2i, C3i, C4i and PODs to release construction team to do the survey with ROW team.
- We received the input from construction team and made changes as per input received from construction team. And release the RFC plan with construction pack C2i wise to apply ROW and for execution.
- To design OSP Network Planning as per requirement of business teams.
Senior Executive – Planning Engineer - ONE OTT iNTERTAINMENT Ltd
(2019-04 - 2022-05)
FTTH Planning and designing based on Home Pass requirements and survey findings.
- To prepare the FTTH planning according to Home Pass (COB, DSA, CSA) on ArcGIS software.
- Incorporate the survey findings and prepare the final design.
- Planning of stage-1 splitter (2:8) and stage-2 splitter (1:8).
- To prepare Bill of material (BoM) and Bill of Quantity (BoQ) for the COB.
- In-building designs for the area are released by business in line with the guidelines and splicing plan.
- To prepare eMRF for material.
- Carry out physical AT and ODN elements, In-building design, Feeder and distribution network and optical AT from FDP to S2 output port.
- We are worked on Delhi Govt. WI FI project.
FTTH planning and acceptance engineer - Reliance SMSL (subsidiary of Reliance Jio Infocom Ltd.)
(2017-01 - 2019-04)
OSP FTTH Planning and acceptance engineering including network design and site validation.
- Worked on NE (Network Engineer) tool for multiple activities like to import XML files, trace the fiber, splicing, equipment placement, patching and many more.
- Responsible to prepare OSP FTTH Planning like:-FSA, DSA, CSA, ESA on AutoCAD (Comsof) tool and ArcGIS software.
- Cary out site survey along with the construction and business team to validate.
- Incorporate the survey findings and prepare the final design and create construction pack consisting of civil plan, ODN plan, Splice plan, Bill of material (BoM) and Bill of Quantity (BoQ) for the FSA.
- In-building designs for the area are released by business in line with the guidelines and splicing plan.
- Building RFS and approved.
- Co-ordination for the deployment of backhand network for OLT.
- Carry out periodic site visits to make sure vendor partner is adhering to quality norms in construction.
- Meeting with various societies board members for better clarity on FTTx and help those to logic clear on fiber.
- Liaise with the business team to facilitate In-buildings permission to carry out survey for In-building design. Validate all changes management proposed during pre-network construction and network construction period. Incorporate only valid changes.
- ROW layer release to construction to enable to apply for ROW. To conduct periodical audit to check process adherence by construction staff and deployment partners.
Engineer Mehsana (Gujarat) - IKYA Human Capital Solution Ltd. - Mehsana, Gujarat
(2014-05 - 2017-01)
Worked with client company Reliance Jio Infocomm Limited (RJIL) as consultant in 4G project with overall responsibility for fiber maintenance and installation activities in Mehsana, Gujarat.
- Fiber: - I am looking 300 km fiber maintenance from (Mehsana–Ahmedabad, Mehsana-Himmatnagar-Raigadh-modasa) including part of intracity fiber with support of Pratap (Maintenance Vendor) 01Nos FRT.
- Supervision & implementation of HDD, Trenching, duct laying as per plan.
- DIT, OFC blowing in Existing duct & resolution of problems during blowing of fiber cable.
- Link testing by OTDR as well as LSPM MH/HH installation as per Guideline. Fiber splicing & termination.
Site Engineer - MS Joda Corporation
(2012-02 - 2014-05)
Site supervision and implementation of fiber network infrastructure including HDD, trenching, duct laying, and fiber installation.
- Supervision & implementation of HDD, Trenching, duct laying as per plan.
- DIT, OFC blowing in Existing duct & resolution of problems during blowing of fiber cable.
- MH/HH installation as per Guideline.
- Fiber splicing & termination.
- Link testing by OTDR as well as LSPM.
- I have good knowledge of tower foundation also done GBM foundation with multi pilling.