F.M Engineer - Teamlease pvt Ltd
(2024-06 - 2025-09)
- Good working knowledge on Ericsson BTS (6630,6631,6651,5216,5212,2001, ).
- Maintenance and Consolidation.
- Integration and alarm handling
- Installation of 2300,2500.U900 &L1800,G900,L900,U1800,L2100,U1800 MHz Integration and antenna band of 5G,4G,3G,2G for IDEA.
- FDD and TDD,MIMO Integration and alarm handling. Good working knowledge & Experience on NMS (network management system).
- Alignment & fine-tuning of microwave links (0.3,0.6,1.2,1.8m) between two sites
- Visit vendor team installed site to check quality of their Installation and Alignments
Implementation Engineer - Teamlease pvt Ltd
(2021-07 - 2024-05)
Site Integration and alarm handling
- Responsible to Installation, Alignments and Integration of Ceragon (0.6m, 0.9m, 1.2m, ) MW at planned site of Airtel site as per the Link Budget plan with a team of Riggers.
- Responsible for timely and proper delivery of materials as per the checklist plan to site. So check all materials at the time of delivery at site.
- Responsible for proper installation of Ceragon MW at site, as per the norms of customer. Proper Alignments as per plan and achieved planned RSL value.
- Responsible for all the quality related issue at site, so make sure either our team or vendor to all installation or alignments as per the customer requirements.
- Responsible for configuration of Ceragon IDU IP 21 C, IP 21E as per proper plan with proper software updates of version 21, 68, 78 and 182.
- Responsible for Integration for Ceragon IDU IP 20, through Cisco router and L2 Switch with airtel field team.
- Responsible for ATP of site along with JIO field team as per their requirements, and get ATP sigh from them.
- Visit vendor team installed site to check quality of their Installation and Alignments.
BSS Engineer - Quess Corporation Ltd
(2020-04 - 2021-06)
Site Integration and alarm handling
- Installation, Commissioning, Site integration of Nokia 2G, 3G, 4G LTE (both TDD & FDD), CRFS, 2G Modernization and U-900 band.
- Knowledge of installation and commissioning of Ultra, Flexi, MR, MR10 BTS.
- Installation and commissioning of SDH and PDH microwave system.
- E1 connection from cell site to BSC.
- E1 dropping at new site and E1 bypassing, E1 dividing.
- Upgrading of E1 capacity from 4*2 to 8*2 or 16*2 as per plan.
- TRx expansion in 2G (900 & 1800) & 3G.
- Operation and maintenance of base station and microwave networks.
- Coordinate with MNOC to rectify performance related alarm.
- Defining and testing of all alarm related to BSS.
- Monitoring and maintenance of microwave transmission network.
- Monitoring the quality control during installation of site.
- Check all equipment properly used in GSM antenna-tilt, connector jumper and weather proofing.
- RFI survey for 2G, 3G, 4G (TDD, FDD), CRFS and U900.
- Acceptance test(AT)
F.M Engineer - Shivam info pvt ldt
(2018-06 - 2020-03)
- Good working knowledge on Ericsson BTS (6630,5216,5212,2001, ).
- Maintenance and Consolidation.
- Integration and alarm handling
- Installation of 2300,2500.U900 &L1800,G900,L900,U1800,L2100,U1800 MHz Integration and antenna band of 4G,3G,2G for IDEA.
- FDD and TDD,MIMO Integration and alarm handling. Good working knowledge & Experience on NMS (network management system).
- Alignment & fine-tuning of microwave links (0.3,0.6,1.2,1.8m) between two sites
- Visit vendor team installed site to check quality of their Installation and Alignments.
S.S Engineer - I W S
(2015-04 - 2018-04)
Site Installation Integration and alarm handling
- Installation of 2300 &1800 MHz antenna band of 4G for Reliance Jio.
- Installation of GSM of 850 MHz Antenna band of 4G for Reliance Jio.
- ATP 11A for installation quality report.
- ATP11B to check the speed of network.
- RFE1 survey.
- Maintenance, Integration and alarm handling
- Installation, Commissioning, Site integration of Nokia 2G, 3G, 4G LTE (both TDD & FDD), CRFS, 2G Modernization and U-900 band.
- Knowledge of installation and commissioning of Ultra, Flexi, MR, MR10 BTS.
- Installation and commissioning of SDH and PDH microwave system.
- E1 connection from cell site to BSC.
- E1 dropping at new site and E1 bypassing, E1 dividing.
- Upgrading of E1 capacity from 4*2 to 8*2 or 16*2 as per plan.
- TRx expansion in 2G (900 & 1800) & 3G.
- Operation and maintenance of base station and microwave networks.
- Coordinate with MNOC to rectify performance related alarm.
- Defining and testing of all alarm related to BSS.
- Monitoring and maintenance of microwave transmission network.
- Monitoring the quality control during installation of site.
- Check all equipment properly used in GSM antenna-tilt, connector jumper and weather proofing.
- RFI survey for 2G, 3G, 4G (TDD, FDD), CRFS and U900.
- Acceptance test(AT)
Project Engineer - Brightview Telecom Pvt. Ltd.
(2011-06 - 2015-02)
Huawei Project.
- Installation of BBU3900,BBU3910,
- Commissioning with WDT (Wireless Deployment Tool).
- ISDP work for quality of installation.
- Site Integration.
- Acceptance Test.
- RFI survey
- Maintenance and alarm monitoring.
- Installation of MW Antenna, RTN 905, RTN 950, RTN 950A,RTN 980
- MW RTN Commissioning, & Alarm Rectification.