Process Asst. Engineer - Vega Auto Accessories Ltd. - Rudrapur, Uttarakhand
(2024-08)
- Process Improvement and Productivity Enhancement.
- BOM Development and cost modelling.
- Value Engineering (VAVE) & NPI Costing.
- Optimized cycle time by 20% through process re-engineering and line balancing, saving approximately ₹12 lakhs annually in production costs.
- Manufacturing & Assembly Process Planning.
- Coordinated with quality, maintenance, and supply chain teams to reduce average machine downtime by 25%.
- Implemented 5S and Kaizen practices on the shop floor, improving workplace organization and reducing material search time by 30%.
- MS Office (MS Excel, MS Power Point, MS Word) / Google sheet
Production Supervisor - ZF Rane Automotive India Pvt Ltd. - Rudrapur, Uttarakhand
(2017-01 - 2024-07)
- Manpower monitoring and Handling on daily basis, to meet the budget.
- Handling production floor operations, process monitoring, and line efficiency
- Process Standardization & SOP Development.
- Manufacturing & Assembly Process Planning.
- Poka-Yoke implementation which lead to zero rejection & Zero Defect.
- Improved Overall Equipment Effectiveness (OEE) Calculation.
- Planned and monitored daily production schedules for 300+ units/day across 2 assembly lines, consistently achieving 95%+ production efficiency.
- Coordinating with Quality, Maintenance, PPC Store and other department for timely resolution of production issues.
- Maintain Daily Production Report, production MIS, down time reports and other relevant production records.
- Implemented 5S and Kaizen activities on the shop floor, improving workplace organization and PPE requirements in the production area.
Diploma Engineer Trainee (Production) - ZF Rane Automotive India Pvt Ltd. - Pantnagar, Uttarakhand
(2015-12 - 2016-10)
- Assisted in daily production monitoring, data logging, and OEE calculation for the machining department.
- Supported implementation of a new inspection checklist that reduced final-stage rejection by 8%.
- Trained on SAP PP module for production order creation, material requirement planning, and shift reporting.