تخطي إلى المحتوى الرئيسي
Abdulbary Ali

Abdulbary Ali

Civil Engineer | Site Execution | Technical Office | Project Management

كفاءة
Baghdadعضو منذ ١٧ أكتوبر ٢٠٢٦
Technical OfficeQuantity SurveyingBOQBBSShop DrawingsAs-Built DrawingsConstruction CoordinationInfrastructureConcrete & FoundationsMEP CoordinationProject Management
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

Technical OfficeQuantity SurveyingBOQBBSShop Drawings

نبذة

Civil Engineer with extensive experience in site execution, technical office activities, quantity surveying, construction coordination, subcontractor/client extracts, progress monitoring, civil and architectural works, infrastructure, foundations, concrete works, finishes, and project documentation. Experienced in coordinating civil works with MEP disciplines, preparing shop drawings and as-built drawings, reviewing contract documents, and resolving technical issues during construction.

الخبرة

Senior Site Engineer at DAEWOO E&C (2025-01 – 2026-05)

Project: Khor Al Zubair Immersed Tunnel – Basra, Iraq Immersed tunnel project including precast tunnel elements cast, assembled, and submerged beneath the water, with control and administration buildings for tunnel operation and monitoring.

  • Supervised and managed day-to-day construction activities in accordance with approved drawings, specifications, and project requirements.
  • Coordinated with subcontractors, consultants, and site teams to ensure smooth execution of works.
  • Monitored project progress and ensured construction activities were completed according to the approved schedule.
  • Coordinated civil works with MEP and other disciplines to resolve site conflicts and technical issues.
  • Prepared daily and weekly progress reports and monitored site productivity.
  • Identified and resolved technical and construction-related issues in coordination with the project management team.

Technical Office Engineer at ECIP (2023-03 – 2024-05)

Project: Construction of Oasis Buildings – Owner: Capital Administrative Municipality

  • Studied project documents including drawings, specifications, BOQ, RFIs, and correspondence to support accurate implementation.
  • Prepared information requests for the project consultant to obtain missing information and resolve design conflicts.
  • Calculated reinforcement steel quantities from approved structural drawings and prepared BBS tables.
  • Prepared quantity surveys for civil, architectural, and electromechanical works.
  • Prepared subcontractor and client invoices based on progress reports, execution rates, completion rates, and delivered works.

Project Manager at Global Falcom for Trading and Contracting (2020-12 – 2022-06)

Project: Construction of Moudi Alhuker Mosque – Owner: Association for the Care of Road Mosques

  • Managed the overall execution of the mosque project from structural works through architectural finishes and MEP coordination.
  • Planned and coordinated daily and weekly construction activities in accordance with approved drawings, specifications, project requirements, and schedule.
  • Coordinated site teams, subcontractors, suppliers, and project disciplines to maintain workflow and resolve execution issues.
  • Monitored project progress, productivity, manpower, materials, costs, and completion against the project plan.
  • Reviewed structural and architectural drawings and coordinated electrical, plumbing, HVAC, and ventilation works to resolve site conflicts.
  • Followed up quantities, project cash flow, subcontractor works, owner requirements, and payment extracts.
  • Prepared progress reports and coordinated inspections, testing, and handover of completed works.
  • Supervised reinforced concrete works, exterior and interior finishes, false ceilings, flooring, marble, GRC, stone works, painting, air-conditioning, and ventilation systems.
  • Project included men's prayer hall, women's prayer hall, and Friday prayer hall with a reinforced concrete frame system.

Technical Office Engineer at Abdulmohsen AlSAHLI Holding Co. (2018-03 – 2020-10)

Project: Construction of Broiler Chicken Farms – Owner: Fakih Chicken Company

  • Followed up general site works including roads, interlock, landscaping, irrigation network, water tank, sewage pit, and a 25 m high concrete minaret with stone and GRC finishes.
  • Followed up project cash flow and prepared owner and subcontractor extracts.
  • Coordinated between project departments and contractors for different construction activities.
  • Reviewed contract documents and coordinated structural drawings with architectural and electromechanical drawings to identify conflicts.
  • Prepared quantity inventories and quantity tables for civil, architectural, and electromechanical items.
  • Prepared subcontractor and client extracts based on executed quantities, completion rates, contract prices, and price differences.
  • Prepared executive shop drawings for excavation, concrete, and building works, and prepared as-built drawings.

Site Engineer at Kairouana Company for General Contracting, Construction and Building (2017-01 – 2018-03)

Project: Construction of Hotel Chalets at Galala Resort 6 – Owner: Armed Forces Engineering Authority

  • Project consisted of 15 hotel chalets.
  • Handed over boundaries and levels of replacement layers.
  • Followed up formwork for plain and reinforced concrete foundations including isolated footings, neck columns, and ground beams.
  • Followed up foundation waterproofing, internal backfilling, and concrete ground slab works.

Site Engineer at Sulaiman Al-Tuwaijri Company for General Trading and Contracting (2015-02 – 2016-12)

Project: Installation of Flood Drainage Pipes – Owner: Qassim Municipality

  • Project consisted of reinforced concrete pipe networks, manholes/inspection chambers, and a reinforced concrete culvert.
  • Surveyed natural ground levels and handed them over to the consultant before excavation.
  • Followed up asphalt cutting, excavation, concrete bedding, pipe levels, and internal pipe invert level (IL).
  • Followed up layered backfilling and warning tape installation.
  • Followed up MC-1 and RC-2 application, asphalt laying, and metal covers.
  • Followed up formwork and reinforcement for columns and slabs, consultant inspection, and concrete pouring.
  • Followed up blockwork and electrical/plumbing provisions, plastering, and painting works.

التعليم

Bachelor's Degree in Civil Engineering – Higher Institute of Civil and Architectural Engineering (2009 – 2014)

المهارات

Civil EngineerSite ExecutionTechnical OfficeProject Management

التقييمات