تخطي إلى المحتوى الرئيسي
Durgham Sattar

Durgham Sattar

Senior Architect and Project Manager

كفاءة
Erbilعضو منذ ١٤ مايو ٢٠٢٦
Architectural DesignUrban DesignStructural Steel FabricationQA/QCPrimaveraMicrosoft ProjectAutoCAD3ds MaxV-RayAdobe PhotoshopArchitectural DraftingHealth & Safety
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

Architectural DesignUrban DesignStructural Steel FabricationQA/QCPrimavera

نبذة

Accomplished Senior Architect and Project Manager with over 25 years of experience driving large-scale architectural design and civil construction initiatives. Distinguished track record in managing complex project lifecycles within high-security and challenging environments, including the International Zone (IZ). Expert in urban design, structural steel fabrication, and multi-disciplinary QA/QC.

Proven ability to leverage advanced planning software (Primavera, MS Project) to ensure rigorous adherence to milestones and budgetary constraints.

الخبرة

Senior Planning Manager | Project Manager | QA/QC Lead - RASAN GROUP - Erbil, Iraq

(2011-08)

  • Direct operations as the Rasan Steel Factory Manager while concurrently serving as a Resident Project Manager for high-priority infrastructure works
  • Orchestrate comprehensive planning, programming, and scheduling for architectural and steel projects using Microsoft Project to ensure 100% on-time milestone delivery
  • Serve as the primary QA/QC authority, establishing rigorous inspection protocols for architectural and civil works to maintain international design standards
  • Generate detailed accomplishment and progress reports for stakeholders, translating complex technical data into actionable project insights

Senior Planning & Cost Engineer | QA/QC Architectural Lead - SAEH AL SAHRA GROUP INC. (SSG) - Baghdad, Iraq

(2008-07 - 2010-07)

  • Directed the planning and programming for a diverse range of large-scale infrastructure projects, including military location commands and training complexes
  • Expertly managed the mobilization of manpower, heavy equipment, and construction materials within harsh environments and active combat zones
  • Leveraged Primavera and Microsoft Project to develop sophisticated work schedules, cost estimates, and progress tracking for Proposal, Design, and Construct contracts
  • Functioned as the lead QA/QC for architectural works, ensuring all construction activities met rigorous technical specifications and safety standards
  • Managed the Diyala RCB Project full lifecycle from proposal and design to final construction
  • Oversaw the design and construction phase for Kirkush Location Command critical military installation
  • Led the proposal and design efforts for EOD HQ & Training Complex (Baghdad) high-specialty training facilities
  • Spearheaded the architectural design and proposal for Al-Ghizlani Location Command

Sr. Planning/Cost Engineer/ utilizes as QA/QC for Architectural Works - AMERICAN-IRAQI SOLUTIONS GROUP (AISG) - Al-Harthia, Baghdad, Republic Of Iraq

(2007-06 - 2008-07)

Generally responsible for planning and programming, including architectural drafting and design, and scheduling using Microsoft Project Office and Primavera Software. Make an accomplishment report. Assist in the mobilization of manpower, equipment, and materials in a harsh environment/combat or war zone.

  • CONSTRUCTION OF DIVISION HEADQUARTERS, SUPPORT BATALLIONS, IRAQI NATIONAL GUARD BATALLIONS, AND OLD MUTHANA MILITARY BASE LARGE (L) GARRISON SUPPORT UNIT (GSU) (Design & Construction)
  • DESIGN AND CONSTRUCT AL ANBAR JUDICIAL COMPLEX-HURRICANE POINTRAMADI, IRAQ (proposal)
  • OMINIBUS LIFE SUPPORT STATEMENT OF WORK FOR IRAQI TRAINING CAMP AT ASHRAF TRAINING CENTER (Design & Construction)
  • UNION III 2200 MAN CAMP BAGHDAD, IRAQ (IZ) (Design & Construction)
  • Design and Construct DGIS HQ Campus (proposal)
  • Detention International Facility (DIF) BAGHDAD TAJI (proposal)
  • FOB ENDEAVOR (Design & Construction)
  • Al Anbar Regional Police Training Center, Habbaniyah, Iraq (Design & Construction)
  • HAMMAM ALAIL FIRE RANGE (proposal)
  • OMNIBUS HUSAYNIYAH (Design & Construction)
  • 601st Motor Pool Project COB Speicher, Iraq (proposal)
  • National Police Headquarters Site 1, Baghdad (proposal)
  • CONSTRUCT A LEVEL I AID STATION AT BESMIYAH, IRAQ (Design & Construction)
  • Construction of Tajii TIFRIC (proposal)
  • infrastructure battalion (Renovation and new construction) (proposal)
  • MRAP/SEI Industrial Power Generation Al Taqaddum (TQ), Iraq (Design & Construction)
  • CONSTRUCTION OF TUWAITHA LIFE SUPPORT AREA (Design & Construction)
  • CONSTRUCTION SPRUNGS (TALIL, TQ, TEKRIT, BALD VBC) (Design & Construction)

Project Manager, Sr. Planning/Cost Engineer/ utilizes as QA/QC for Architectural Works - VIN COMPANY - Agra-ERBIL, Republic of Iraq

(2006-04 - 2007-06)

Project Manager in the Agra Hospital project

  • Directed comprehensive Architectural QA/QC for hospital facilities, meticulously verifying the integration of architectural finishes with Structural, Mechanical, Sanitary, and Electrical (MEP) systems
  • Monitored critical installation phases, including specialized concrete screeding, drywall systems, suspended ceilings, and high-specification flooring and tiling
  • Orchestrated complex procurement and scheduling using Primavera software, aligning material acquisition with construction milestones to ensure the project met strict target completion dates
  • Conducted weekly and monthly progress assessments, tracking project resources and costs to maintain strict budgetary and timeline compliance
  • Utilized AutoCAD to produce precise architectural planning and drafting necessary for on-site implementation

Architect- Designer - Karim Bowab CO - Amman Jordan

(2004-07 - 2006-04)

  • Responsible for the design and supervision of all construction works related to the development of all infrastructure projects of the Municipal government
  • Supervise the construction of projects and handle all documents about contractors' technical requirements for their project accomplishments
  • Monitor the construction phase, contractors' work performance, and prepare the necessary technical requirements of the project

Project Manager - Private Sub-Contractor – Free Lancer

(2003-03 - 2004-07)

  • Do sub-contracting works for the construction of residential housing units and civil repair works
  • Do architectural designing and drafting using Autodesk software
  • Prepare and work the technical documentation needed for bidding of infrastructure projects, such as Bill of Quantities, Technical Specifications, Milestone Payment Schedule, Manpower and Equipment Utilization Schedule, Construction Methodology, and the like

Executive engineer - Al-Faw Company - Baghdad Iraq

(2001-10 - 2003-03)

Generally responsible for the Design and Implementation of all Special Infrastructure projects of the Authority. Supervised a section of specialists who designed and implemented an essential building center, two floors underground and six floors over ground. Spend the majority of time ensuring that quality control and specifications were met within the approved time frame.

التعليم

Master of Science (M.Sc.) - Urban Design - Jordan University (2001 - 2003)

Bachelor of Science (B.Sc.) - Architecture - Technological University (1994 - 1999)

المهارات

Senior Architect and Project Manager

التقييمات